4-laning of Amravati to Chickle Section of DRG. NO. CIPL/D1033/MJBR/STR/DWG/302 (SH. 1 OF 1)
DIMENSION AND REINFORCEMENT NH-6 from Km 166.000 to Km 360.000 (Package-I) in the state of Maharashtra DETAIL OF PIER-P2 FOR MAJOR BRIDGE DATE : MARCH 2020 REV: R0 to be executed as BOT (Toll) project @ CH.:273.075 (CA DESIGN CH.: 273.069) R0 MARCH 20 DESIGNED DRAWN CHECKED APPROVED on DBFOT pattern under NHDP Phase III REV DATE DESCRIPTION A B C D NS LS GS SK SCALE : AS SHOWN PAPER SIZE : A3
Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LPL-06 5 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23