Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Comments Log
ENGG CERT

J.S.N

J.S.N

J.S.N

Company 1ST
O.S.K

O.S.K

O.S.K

On COMPANY TR Ref. :TF& TD-2-T-0718-14 10/20/14


Comment :
HAL 1ST Issue : On HAL TR Ref. : JZR&TPD-EPC2-TR-HAL/SA-2165 9/28/14
Document Number : J34-A-DOC-VE-678054
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

Current Revision : 0A IFA


Document Title : METHOD STATEMENT OF STONE COLUMN
DESCRIPTION

Company
Contractor Response Contractor
Sheet Section Company Comments Comments
No. (for Rev. 0A Response
No. No. ( in Rev.00) ( in
Comments)
Rev.0A)
1 The Stone Column Method Incorporated Closed
Statement document shall be comments @
modified to include Soil conditions Attachment No.3
JO/EWO

encountered within the


10-01055

10-01055

10-01055

Geotechnical Investigation already


taken (submitted Geotechnical
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

Report prepared by Osaimi


Engineering Office has been
approved);
NO.
REV

0A

0C
0B

DISCIPLINE 2 The Stone Column Method Incorporated Closed


ENGINEER
O.S KWON Statement document shall be comments at Item #
DATE:
DEC.01 ‘2014 modified to include project 2.1
PROJECT
ENGINEER
description including soil
Y.G. PARK improvement limits and project
DEC.01 '2014
DATE:
acceptance criteria;
CERTIFIED
J.S. NA
3 The Stone Column Method The purpose of the Open
DEC.01 '2014
Statement document shall be Trial Test is to
DATE:
modified to include trial Testing confirm the suitability
CONSTRUCTION
AGENCY results which from a summary of of the design concept
parameters to be utilized shall be (e.g. SC diameter,
It is noted.
DATE: provided; more specifically, two design parameter,
OPERATIONS We will
different Trial areas have been spacing grid) and
resubmit the
identified composed of : construction
revised trial
DATE: 1)  Area 1: 4 No of SC, grid parameter for main
test report
CONTROL NUMBER

spacing-1.5m, diameter-1m, depth stone column works


VERIFICATION

for
treatment:7.7m; for this project site
EDSD

Company’s
2)  Area 2: 4 No of SC, grid condition.
review and
DATE:

spacing-2m, diameter-0.9m, depth As the results, we


BY:

approval.
treatment:7.7m; could confirm that
APPROVAL/CERTIFICATION REQUIREMENTS,

3)  No information in relation to they are suitable for


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

various parameters (e.g. grid the site condition.


(DCC) NO. _____________________

spacing/SC diameter/holding And the construction


time/raising steps/re penetration parameter for the main
METHOD STATEMENT OF STONE COLUMN
DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
3
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Company
Contractor Response Contractor
Sheet Section Company Comments Comments
ENGG CERT

J.S.N

J.S.N

J.S.N
No. (for Rev. 0A Response
No. No. ( in Rev.00) ( in
Comments)
Rev.0A)
O.S.K

O.S.K

O.S.K

numbers/water-surge-aggregate works is mentioned in


feeding) for achieving the required the section 7.2.
degree of compaction within the
main works is provided;
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

4 Cone Penetration tests shall be Contractor believes Open


included within the Post quality that the ground
DESCRIPTION

control testing, in addition to plate strength between


load tests; Stone Columns
1) Plate load tests, unless a couldn't be checked by
prototype concrete footing is CPT. Because the
utilized by undertaking a full scale column is designed by
load test, are, mostly, applicable for the concept of a
verifying the compactness/strength supporting column.
of the top soils up to depth of about Therefore, SC will be
2-3m; therefore, no information are verified by Full Scale
obtained in relation to deeper Load Test and check
JO/EWO

10-01055

10-01055

10-01055

improved soil layers; the level of vibro


2)On completion of soil treatment probe tip, pressure,
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

schemes, Post-compaction CPTs time and volume of


are, usually, carried out; Cone inserted aggregates.
Penetration Tests are, normally, It is noted.
NO.
REV

0A

0C
0B

DISCIPLINE
performed at specified frequencies Even though CPT is CPT will be
ENGINEER
O.S KWON
for quickly identifying the degree the fast testing method conducted
DEC.01 ‘2014
of compaction achieved within the to evaluate the effect during Post
DATE:
PROJECT
granular formations; each set shall of soil improvement Quality
ENGINEER
be consisted of one CPT at the work, please note that Control
Y.G. PARK
DEC.01 '2014
centroid of a grid and one at 1/3rd Contractor's design Testing.
DATE:
CERTIFIED
of two adjacent points; therefore, concept is based on Incorporated
J.S. NA the weakest point within the SPT N Value by DC @ 8.4(a).
DATE:
DEC.01 '2014 triangle of Stone Columns shall be Vibro software. So if
CONSTRUCTION tested; for places where fine the qc value obtained
AGENCY
grained soils (cohesive) exist, CPTs from CPT is used for
are not recommended, since the settlement
DATE:
OPERATIONS compatibility of such soils is not calculation and
significantly improved within bearing capacity, it
compaction incorporated at Stone should be converted to
DATE:
Column execution; at those cases, N Value, and then the
CONTROL NUMBER
VERIFICATION

achievement of the required potential conversion


EDSD

diameter of the aggregate vertical error will be occurred.


column is the vital objective since Contractor believes
DATE:

dissipation of pore water pressure that above mentioned


BY:

(included within the low methods are the most


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

permeability soils) will be effective way for the


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

accelerated through the drainage verification of


(DCC) NO. _____________________

provided (in case of less diameter treatment effect.

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
4
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Company
Contractor Response Contractor
Sheet Section Company Comments Comments
ENGG CERT

J.S.N

J.S.N

J.S.N
No. (for Rev. 0A Response
No. No. ( in Rev.00) ( in
Comments)
Rev.0A)
O.S.K

O.S.K

O.S.K

the drainage path is reduced, and,


then, consolidation is taking place
slower); therefore, excavation trials
are recommended for identifying
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

that specified column diameter has


been achieved within accepted
tolerances;
DESCRIPTION

3) acceptance criteria in relation to


lower/upper bound limits of Post
CPTs shall be provided; minimum
values of cone resistance at various
depths (at spacing of 1m) which are
satisfying the required
settlements/bearing capacities
specifications shall be clearly
given; those values are to be used
JO/EWO

10-01055

10-01055

10-01055

as references and compared to the


actual Post CPTs values at same
OCT 23,2014

depths; in case that less cone


DEC.01.2014
DATE

NOV.17.2014

resistance values are acquired, then,


remedial measures shall be taken;
NO.
REV

0A

0C
0B

4)As an alternate pressure meters


DISCIPLINE
ENGINEER tests at various depths are also
O.S KWON
recommended;
DEC.01 ‘2014
DATE:
PROJECT
5 It is recommended that prior of According to DC Open
ENGINEER
undertaking any soil treatment Vibro, the design
Y.G. PARK
DEC.01 '2014
works a limited field testing by concept of stone
DATE:
CERTIFIED
means of SPTs-CPTs shall be column is that:
J.S. NA performed for verifying the (1) the original
DATE:
DEC.01 '2014 findings within the approved ground will not be As
CONSTRUCTION Geotechnical Report, and, in improved due to stone discussed,
AGENCY
addition, comparisons to column and, we will
subsequent Post quality control (2) stone column can follow the
DATE:
OPERATIONS testing to be carried out; be considered as a design value
composite soil from
supporting external approved
DATE:
load. Namely, the geotechnical
CONTROL NUMBER
VERIFICATION

design parameters of report at


EDSD

original ground are Contractor’s


not changed as per risk.
DATE:

conservative design
BY:

concept. Accordingly,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

Contractor believes
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

the SPTs and CPTs


(DCC) NO. _____________________

are not required for

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
5
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Company
Contractor Response Contractor
Sheet Section Company Comments Comments
ENGG CERT

J.S.N

J.S.N

J.S.N
No. (for Rev. 0A Response
No. No. ( in Rev.00) ( in
Comments)
Rev.0A)
O.S.K

O.S.K

O.S.K

verification of
findings of approved
geotechnical report
(J34-A-DOC-VE-
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

636001).
6 Because site Open As
DESCRIPTION

Need (or not) of a potential preparation works discussed,


working platform shall be have already carried the current
identified; purpose of working out, and existing soils filled soil is
platform, is generally, for are well compacted well-
ascertaining that equipment to be capable of compacted
used for soil treatment works shall withstanding loads to by Company
not face any problems in relation to be imposed, it is and provided
bearing capacity and failure/settle believed are not to
issues; if site preparation works required. Contractor.
have already carried out, and, Therefore,
JO/EWO

10-01055

10-01055

10-01055

therefore, existing soils are well we believe


compacted capable of withstanding working
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

loads to be imposed, then working platform is


platforms are not required; not
necessary.
NO.
REV

0A

0C
0B

DISCIPLINE 7 In case of Pre/Post SPTs usage, The purpose of Open


ENGINEER
O.S KWON then, type of hammers to be used geotechnical
DATE:
DEC.01 ‘2014 for undertaking field SPT test shall investigation is to
PROJECT
ENGINEER
be indicated and calibration verify the
Y.G. PARK certificates shall be provided geotechnical
DEC.01 '2014
DATE:
(SAES-A-113 indicates that condition.
CERTIFIED automatic SPT hammers shall be
J.S. NA As
employed); moreover, field N SPT Al Osaimi, approved
DEC.01 '2014 discussed,
DATE: values shall be corrected by taking geotechnical
we will
CONSTRUCTION into account the following subcontractor,
AGENCY follow the
parameters, and, then be used on performed the
geotechnical
DATE: calculations in relation to investigation well and
design value
OPERATIONS foundation recommendations: approved by
from
hammer efficiency, borehole Company.
approved
DATE:
diameter, sampler correction,
geotechnical
correction for rod length; In addition, the design
CONTROL NUMBER
VERIFICATION

report at our
of stone column is
risk.
EDSD

based on the approved


geotechnical
DATE:
BY:

investigation report
(J34-A-DOC-VE-
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

636001).
(DCC) NO. _____________________

Therefore, Contractor
METHOD STATEMENT OF STONE COLUMN
DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
6
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Company
Contractor Response Contractor
Sheet Section Company Comments Comments
ENGG CERT

J.S.N

J.S.N

J.S.N
No. (for Rev. 0A Response
No. No. ( in Rev.00) ( in
Comments)
Rev.0A)
O.S.K

O.S.K

O.S.K

believes additional
SPTs are not
necessary for
verification of
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

findings of approved
geotechnical report.
DESCRIPTION

8 Clarification of source of aggregate It is Noted Closed


to be used (working platform, stone
columns) in relation to the area to
be taken shall be provided; this is
purely logistic matter for
identifying if such material exist at
nearby places;
9 Furthermore, a completed design 1 As the result of trial Closed
of the soil improvement method test, it was proven that
JO/EWO

10-01055

10-01055

10-01055

(SC) to be applied shall be proposed Stone


prepared on a Final Design Report Column design
prior of the main soil improvement concept and
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

works commencement (referred as construction method


Calibration/Trial Report providing are the most suitable
NO.
REV

design methodology to be for the soil


0A

0C
0B

DISCIPLINE applicable within the main improvement at the


ENGINEER
O.S KWON compaction works), including the project site.
DATE:
DEC.01 ‘2014 following: So, there would be
PROJECT
ENGINEER
1. Calculations (incorporating both included bearing
Y.G. PARK pre and post treatment phases) capacity/settlements
DEC.01 '2014
DATE:
based on results acquired by the issues through
CERTIFIED Trial to prove adequacy and engineering
J.S. NA
compliance to the project specified calculations and
DEC.01 '2014
DATE: acceptance criteria; the degree of designed to be
CONSTRUCTION
AGENCY
compaction to be achieved for applicable for each
eliminating bearing foundation’s size and
DATE: capacity/settlements/liquefaction applied load within
OPERATIONS issues within tolerable limits shall the Final design
be clearly identified through report.
DATE:
engineering calculations (similar to 2. It would be
those submitted within Trial consider for the long
CONTROL NUMBER
VERIFICATION

Method Statement document but term components of


EDSD

having verified soil properties after fine grained soils to be


improvement taken from the Trial designed. And
DATE:
BY:

Post Tests) within the Final Design There is mentioned


Report; that liquefaction is not
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2. Verification that perceived in approved


method/parameters identified geotechnical report
(DCC) NO. _____________________

within the Trial phase are (J34-A-DOC-VE-


METHOD STATEMENT OF STONE COLUMN
DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
7
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Company
Contractor Response Contractor
Sheet Section Company Comments Comments
ENGG CERT

J.S.N

J.S.N

J.S.N
No. (for Rev. 0A Response
No. No. ( in Rev.00) ( in
Comments)
Rev.0A)
O.S.K

O.S.K

O.S.K

applicable for ensuring that post 636001).


treatment bearing capacity, 3. It is noted
settlements including long term 4. It is noted
components of fine grained soils,
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

liquefaction potential are within the


acceptance project criteria;
3. Final Design Report shall
DESCRIPTION

include all relevant information


with regards to soil improvements
methods to be employed (e.g. Stone
Columns: grid spacing/holding
time/raising steps/re penetration
numbers/water-surge-aggregate
feeding) and shall, also,
recommend optimum
set/combination of above
JO/EWO

10-01055

10-01055

10-01055

parameters to be used resulting on


the most favorable ground
OCT 23,2014

improvement design and


DEC.01.2014
DATE

NOV.17.2014

construction scheme;
4. Post treatment bearing
NO.
REV

0A

0C
0B

capacity/settlements/liquefaction
DISCIPLINE
ENGINEER estimates shall be based on actual
O.S KWON
loads, foundations
DEC.01 ‘2014
DATE: widths/dimensions/locations, and
PROJECT
ENGINEER soil parameters (taken from
Y.G. PARK
approved detailed geotechnical
DEC.01 '2014
DATE: investigation);
CERTIFIED
J.S. NA 10 Geotechnical related tests shall It is Noted Closed
DATE:
DEC.01 '2014 comply with SAES-A-113
CONSTRUCTION
AGENCY
Genera All tests shall be conducted by It is noted.
Geotechnical Engineering offices
DATE: in the CSD's approved list (SAES-
OPERATIONS A-113)
4.1 Comments on parag. 4.1 reference Incorporated
DATE: documents -The facility plot plan, comments @
CONTROL NUMBER

geotechnical investigation report Attachment No.3~5


VERIFICATION

with document no.VE-636001, Soil


EDSD

improvement Layout and


DATE:

foundation location plan is not


BY:

available.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

9 Comments on para 9.0 - The below Incorporated


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

items 4.1 & 4.2 quality personel comments @ 9.0


(DCC) NO. _____________________

shall be included in the site

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
8
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Company
Contractor Response Contractor
Sheet Section Company Comments Comments
ENGG CERT

J.S.N

J.S.N

J.S.N
No. (for Rev. 0A Response
No. No. ( in Rev.00) ( in
Comments)
Rev.0A)
O.S.K

O.S.K

O.S.K

organization chart for main works


(Schedule Q Table V1-3 -
Construction Phase Quality
Personnel Requirement ):
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

4.1 Primary Contractor -QC


manager & QC Supervisor.
4.2 Subcontractor - QC Manager &
DESCRIPTION

QC Inspector.
9 Comments on paragraph 9.0- The Incorporated
QC Civil Inspector Mr. Ayaz shall comments @ 9.0
be excluded from site Organization
Chart since he is not approved for
this project and is working for BI
10-01055-0009.
5 The below items are for 5.1 : Incorporated
JO/EWO

10-01055

10-01055

10-01055

clarification: comments @ 8.1


item 5.1 Comment on para 5.2 : Incorporated
8.1(daily records)- include the comments @ 8.2.1
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

actual reading of compaction of 5.3 : Incorporated


every lift in the daily records. comments @ 8.4
NO.
REV

item 5.2 Comment on para 8.2.1 - 5.4 : Incorporated


0A

0C
0B

DISCIPLINE indicate details of the stone comments @ 8.4


ENGINEER
O.S KWON columns/type of structure for each
DATE:
DEC.01 ‘2014 settlement acceptance criteria of
PROJECT
ENGINEER
25mm,50mm& 160mm.
Y.G. PARK item 5.3 Provide the frequency of
DEC.01 '2014
DATE:
quality control test - load test after
CERTIFIED stone column works.
J.S. NA
item 5.4 provide the frequency of
DEC.01 '2014
DATE: quality control test for the
CONSTRUCTION
AGENCY
aggregates to be used for stone
column works.
DATE: General Only companies in the CSD It is noted.
OPERATIONS
approved database shall perform
any Geotechnical related test.
DATE:
General Stone column report shall include It is noted.
CONTROL NUMBER
VERIFICATION

the soil stratification for the area


where stone column will be
EDSD

constructed.
DATE:
BY:

General Geotechnical related tests shall It is noted.


comply with SAES-A-113.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
9
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
EDSD REV
REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0A OCT 23,2014 10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N A.S.H
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, NOV.17.2014 A.S.H

J.S. NA
0B 10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N

AGENCY
O.S KWON
BY:

PROJECT

Y.G. PARK
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
0C

DEC.01 '2014
DEC.01.2014 A.S.H

OPERATIONS
CONSTRUCTION
10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N

DEC.01 '2014
DEC.01 ‘2014
(DCC) NO. _____________________ DATE:

JAZAN
Saudi Aramco 2616-ENG (03/99)

Comment :
Company 2nd

HAL 2nd Issue :

Document Title :
Current Revision :
0B

METHOD STATEMENT OF STONE COLUMN

JAZAN REFINERY & TERMINAL PROJECT-EPC#2


Document Number : J34-A-DOC-VE-678054

SAUDI ARABIA
DOC
Comment Log

J34
SAUDI ARABIAN OIL COMPANY

A
DWG.TYPE PLANT NO. INDEX
On COMPANY TR Ref. :TF& TD-2-T-0839-14

METHOS STATEMENT OF STONE COLUMN

JO# 10-01055-0002
On HAL TR Ref. : JZR&TPD-EPC2-TR-HAL/SA-2336

DRAWING

VE - 678054
45
10
OF
IFA
10/25/14
11/11/14

SHT. NO.: REV.

0C

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0B Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0A)
Comments) ( in Rev.0B)
1 soil improvement limits and project 1) It is noted.
O.S.K

O.S.K

O.S.K

acceptance criteria shall be further


elaborated, especially for tanks 2) We will follow the
construction: allowable settlement
1) According to API STD 650 as per approved
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

paragraph 7.3.6.6, any differential geotechnical report.


settlement greater than 13 mm per
10 m (1/2 in. per 32 ft) of 3) Please refer to
DESCRIPTION

circumference or a uniform “Attachment No.3


settlement over 50 mm (2 in.) shall Part of GEO
be reported to the Purchaser for Technical
evaluation; according to the same Investigation Report -
paragraph of 32-SAMSS-005, Differential
measurements exceeding the limit Settlement of Tank”
shall be reviewed by Saudi Aramco
Engineer;
2) If, for any reason, the Contactor
JO/EWO

10-01055

10-01055

10-01055

cannot meet these limits, API-653


Annex B, paragraph B.3.2 can be
OCT 23,2014

utilized as an evaluation technique


DEC.01.2014
DATE

NOV.17.2014

that can be applied for both new


and existing tanks;
NO.
REV

0A

0C
0B

3) Differential settlement (center to


DISCIPLINE
ENGINEER edge) tolerances have been given as
O.S KWON
0.008R (R=Tank’s radius);
DEC.01 ‘2014
DATE: clarification of source (s) taken
PROJECT
ENGINEER shall be provided;
Y.G. PARK
DEC.01 '2014
2 Trial Testing results which from a All of area tested
DATE:
CERTIFIED
summary of parameters to be showed the low
J.S. NA utilized shall be provided; more settlement under the
DATE:
DEC.01 '2014 specifically, two different Trial criteria. Therefore,
CONSTRUCTION areas have been identified we consider the wider
AGENCY
composed of: distance for optimum
1) Area 1: 4 No of SC, grid design at our risk and
DATE:
OPERATIONS spacing-1.5m, diameter-1m, depth it will be verified in
treatment:7.7m; the calculation note by
2) Area 2: 4 No of SC, grid DC vibro, numerical
DATE:
spacing-2m, diameter-0.9m, depth analysis software.
CONTROL NUMBER
VERIFICATION

treatment:7.7m;
EDSD

3) however, as per the soil


improvement shop drawings, other
DATE:

grid spacing are also proposed e.g.


BY:

2.5m, 3m which have not been,


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

previously, tested; clarification


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

shall be provided;
(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
11
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0B Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0A)
Comments) ( in Rev.0B)
3 UTM coordinates and Mean Sea During bidding stage,
O.S.K

O.S.K

O.S.K

Level (MSL) elevations must be we received


provided for all field tests as coordinate system
described in SAES-A-113; MSL from Company, which
elevations and UTM coordinates is incorporated in all
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

must be shown on the field test log; civil drawings. Please


UTM Coordinates shall be refer to the
provided referenced to the “Attachment No.4
DESCRIPTION

International 1924 Ellipsoid, Ain J95-A-DOC-VE-


(Ayn) Al Abd 1970 Datum (stated 558297 - DESIGN
within SAES-A-100); if different NOTE - JAZAN
system is used by the Contractor REFINERY SITE
for locating the exploratory COORDINATES”
holes/improved points (e.g. World
Geodetic System 1984 (WGS84)),
then, transformations shall be,
initially, carried out (corrections
JO/EWO

10-01055

10-01055

10-01055

equations to be acquired by the


Geomatics Services Division);
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

4 1) Incorporated
comments @ 2.1
NO.
REV

0A

0C
0B

DISCIPLINE
2) The stratum in this
ENGINEER
O.S KWON
The Method Statement document project is revealed soil
DEC.01 ‘2014
shall contain all below mentioned layer intermixed with
DATE:
PROJECT
information: coarse-grained & fine-
ENGINEER
grained soils.
Y.G. PARK
DEC.01 '2014
1) Project description including soil And almost our target
DATE:
CERTIFIED
improvement limits and project improved depth is 8m.
J.S. NA acceptance criteria; Dynamic Compaction
DATE:
DEC.01 '2014 2) Method to be used for an method is suitable
CONSTRUCTION improvement referring to site only sand layer, and
AGENCY
specific circumstances; Dynamic Replacement
3) Trial Testing which from a method could improve
DATE:
OPERATIONS Technical Report including final up to below 6m.
design shall be prepared; Therefore, it is
4) Post quality control testing, suitable for Stone
DATE:
bearing capacity/settlements Column method in
CONTROL NUMBER
VERIFICATION

calculations to be performed for this project.


EDSD

identifying the successful Incorporated


completion of the ground comments @ 2.0
DATE:

improvement scheme;
BY:

3),4) It is noted.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

The trial test report


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

will be resubmitted
(DCC) NO. _____________________

incorporating

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
12
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0B Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0A)
Comments) ( in Rev.0B)
Company’s
O.S.K

O.S.K

O.S.K

comments.
5 Trial/calibration test report has not, It is noted.
yet, approved; later report has We will resubmit the
already been reviewed by CSD and trial test report
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

comments implementation is still incorporating


awaited (under CRM No# Company’s
DESCRIPTION

4040422579); please note that prior comments.


of the main works commencement
a completed design of the soil
improvement to be applied shall be
prepared including the following:

1) Calculations to prove adequacy


(incorporating both pre and post
treatment phases) and compliance
to the project specified acceptance
JO/EWO

10-01055

10-01055

10-01055

criteria; the degree of compaction


to be achieved for eliminating
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

bearing
capacity/settlements/liquefaction (if
any) issues within tolerable limits
NO.
REV

0A

0C
0B

DISCIPLINE
shall be clearly identified through
ENGINEER
O.S KWON
engineering calculations to be
DEC.01 ‘2014
performed having utilized soil
DATE:
PROJECT
parameters acquired from the Trial
ENGINEER
post quality control tests;
Y.G. PARK
DEC.01 '2014
DATE:
CERTIFIED
2) Verification that
J.S. NA method/parameters (e.g. grid
DATE:
DEC.01 '2014 spacing/holding time/raising
CONSTRUCTION steps/re penetration numbers/water-
AGENCY
surge-aggregate feeding) identified
within the Trial phase are
DATE:
OPERATIONS applicable for ensuring that post
treatment bearing capacity,
settlements including long term
DATE:
components of fine grained soils,
CONTROL NUMBER
VERIFICATION

liquefaction potential are within the


EDSD

acceptance project criteria;


therefore, a favorable set of
DATE:

parameters to be utilized within the


BY:

main soil improvement works shall


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

be clearly defined for different


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

areas to be implemented;
(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
13
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0B Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0A)
Comments) ( in Rev.0B)
3) Post treatment bearing
O.S.K

O.S.K

O.S.K

capacity/settlements/liquefaction
estimates within the Trial Design
Report, performed by a Specialist
Soil Improvement Contractor, must
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

be based on actual loads,


foundations
widths/dimensions/locations, and
DESCRIPTION

soil parameters (taken from Trial


post quality control tests
6 Cone Penetration tests shall be It is noted.
included within the Post quality We will resubmit the
control testing, in addition to plate trial test report
load tests; settlement calculations incorporating
shall be, thereafter, undertaken by Company’s
utilizing correlations which are comments.
direct applicable to CPTs e.g.
JO/EWO

10-01055

10-01055

10-01055

Schmertmann method;
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

1) Post CPTUs tests have already


undertaken within Trial Calibration
areas, therefore, same to be
NO.
REV

0A

0C
0B

DISCIPLINE
followed within the main works;
ENGINEER
O.S KWON
DEC.01 ‘2014
2) Plate load tests, unless a
DATE:
PROJECT
prototype concrete footing is
ENGINEER
utilized by undertaking a full scale
Y.G. PARK
DEC.01 '2014
load test, are, mostly, applicable for
DATE:
CERTIFIED
verifying the compactness/strength
J.S. NA of the top soils up to depth of about
DATE:
DEC.01 '2014 2-3m; therefore, no information are
CONSTRUCTION obtained in relation to deeper
AGENCY
improved soil layers;
DATE:
OPERATIONS 3) On completion of soil treatment
schemes, Post-compaction CPTs
are, usually, carried out; Cone
DATE:
Penetration Tests are, normally,
CONTROL NUMBER
VERIFICATION

performed at specified frequencies


EDSD

for quickly identifying the degree


of compaction achieved within the
DATE:

granular formations; each set shall


BY:

be consisted of one CPT at the


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

centroid of a grid and one at 1/3rd


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

of two adjacent points; therefore,


(DCC) NO. _____________________

the weakest point within the

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
14
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0B Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0A)
Comments) ( in Rev.0B)
triangle of Stone Columns shall be
O.S.K

O.S.K

O.S.K

tested; for places where fine


grained soils (cohesive) exist, CPTs
are not recommended, since
compatibility of such soils is not
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

significantly improved within


compaction incorporated at Stone
Column execution; at those cases,
DESCRIPTION

achievement of the required


diameter of the aggregate vertical
column is the vital objective since
dissipation of pore water pressure
(included within the low
permeability soils) will be
accelerated through the drainage
provided (in case of less diameter
the drainage path is reduced, and,
JO/EWO

10-01055

10-01055

10-01055

then, consolidation is taking place


slower); therefore, excavation trials
OCT 23,2014

are recommended for identifying


DEC.01.2014
DATE

NOV.17.2014

that specified column diameter has


been achieved within accepted
NO.
REV

0A

0C
0B

tolerances;
DISCIPLINE
ENGINEER
O.S KWON
4) acceptance criteria in relation to
DEC.01 ‘2014
DATE: lower/upper bound limits of Post
PROJECT
ENGINEER CPTs shall be provided; minimum
Y.G. PARK
values of cone resistance at various
DEC.01 '2014
DATE: depths (at spacing of 1m) which are
CERTIFIED
J.S. NA
satisfying the required
DEC.01 '2014
settlements/bearing capacities
DATE:
CONSTRUCTION
specifications shall be clearly
AGENCY given; those values are to be used
as references and compared to the
DATE: actual Post CPTs values at same
OPERATIONS
depths; in case that less cone
resistance values are acquired, then,
DATE: remedial measures shall be taken;
CONTROL NUMBER
VERIFICATION

7 Signed letter by the Main This report is


EDSD

Contractor (Hyundai Arabia reviewed and


Company LLC) indicating that submitted with
DATE:

report has been adequately peer reviewer’s signature.


BY:

reviewed/endorsed/approved shall Contractor will be


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

be provided to CSD; exercise of responsible for


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Saudi Aramco CSD’s right to engineering and


(DCC) NO. _____________________

review and accept reports shall not construction of stone

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
15
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0B Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0A)
Comments) ( in Rev.0B)
relieve the Main Contractor of any column.
O.S.K

O.S.K

O.S.K

contractual obligations or
liabilities; Main Contractor bears
all risk in relation to adequacy and
correctness of the information set
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

out in the report by the sub-


contractor; Main Contractor is
liable and responsible for any
DESCRIPTION

deficiency in sub-contractor’s work


and its consequences on the
project;
JO/EWO

10-01055

10-01055

10-01055
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT
ENGINEER
Y.G. PARK
DEC.01 '2014
DATE:
CERTIFIED
J.S. NA

DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
16
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Comment Log
ENGG CERT

J.S.N

J.S.N

J.S.N
O.S.K

O.S.K

O.S.K

Company 3rd
On COMPANY TR Ref. :TF& TD-2-T- -14 11/27/14
Comment :
HAL 3rd Issue : On HAL TR Ref. : JZR&TPD-EPC2-TR-HAL/SA- 11/30/14
Document Number : J34-A-DOC-VE-678054
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

Current Revision : 0C IFA


Document Title : METHOS STATEMENT OF STONE COLUMN
DESCRIPTION

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0C Comments Response
No. No. ( in Rev.0B)
Comments) ( in Rev.0C)
1 As per the approved Geotechnical
Report “The estimated settlements It is noted.
for Tanks shall be verified against
the data on permissible uniform
JO/EWO

10-01055

10-01055

10-01055

settlements, differential settlements


from center to edge, within the arc
OCT 23,2014

as well as out of plane settlements


DEC.01.2014
DATE

NOV.17.2014

etc. as per applicable project


specifications”;
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER Therefore, apart for the reported It is noted.
O.S KWON
center to edge settlement (e.g. Tank Acceptance
DATE:
DEC.01 ‘2014
0.008R), Ground Improvement criteria will be a two
PROJECT
ENGINEER Requirements/Specifications in (2) inch of edge and
Y.G. PARK relation to tank construction shall differential settlement
DEC.01 '2014
DATE: be further elaborated by taking into (0.008R) will be
CERTIFIED
consideration the following, and, achieved, as agreed.
J.S. NA

DEC.01 '2014
relevant adjustments to Section 2.1
DATE:
CONSTRUCTION
shall be undertaken:
AGENCY 1) HAL will discuss
1) According to API STD 650 the criteria with
DATE: paragraph 7.3.6.6, any differential CB&I(Tank
OPERATIONS
settlement greater than 13 mm per Manufacturer) and
10 m (1/2 in. per 32 ft) of Piping engineer
DATE: circumference or a uniform internally to set the
CONTROL NUMBER

settlement over 50 mm (2 in.) shall criteria. Based on


VERIFICATION

be reported to the Purchaser for agreed criteria, the


EDSD

evaluation; according to the same design of stone


column can be
DATE:

paragraph of 32-SAMSS-005,
BY:

measurements exceeding the limit revised, if necessary.


shall be reviewed by Saudi Aramco → See section 2.1(a)
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Engineer; in blue text.


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
17
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0C Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0B)
Comments) ( in Rev.0C)
2) If, for any reason, the Contactor 2) It is noted.
O.S.K

O.S.K

O.S.K

cannot meet these limits, API-653


Annex B, paragraph B.3.2 can be
utilized as an evaluation technique
that can be applied for both new
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

and existing tanks;


3) Planar till settlements as well as 3) It is noted.
DESCRIPTION

out of plane settlements to be


calculated during the hydro-testing
procedure
2 Trial Testing results which from a We believe we can
summary of parameters to be consider the wider
utilized shall be provided; more distance for optimum
specifically, two different Trial design at our risk and
areas have been identified it will be verified in
composed of: the calculation note by
JO/EWO

10-01055

10-01055

10-01055

DC vibro, numerical
1) Area 1: 4 No of SC, grid analysis software.
spacing-1.5m, diameter-1m, depth → See section 2.1(b)
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

treatment:7.7m;
in blue text.
NO.
REV

2) Area 2: 4 No of SC, grid


0A

0C
0B

DISCIPLINE spacing-2m, diameter-0.9m, depth


ENGINEER
O.S KWON treatment:7.7m;
DEC.01 ‘2014
DATE:
PROJECT
ENGINEER
3) however, as per the soil
Y.G. PARK improvement shop drawings, other
DEC.01 '2014
DATE:
grid spacing are also proposed e.g.
CERTIFIED 2.5m, 3m which have not been,
J.S. NA
previously, tested; clarification
DEC.01 '2014
DATE: shall be provided;
CONSTRUCTION
AGENCY 3 Trial/calibration test report has not, Trial Test Report will
yet, approved; later report has be re-submitted
DATE: already been reviewed by CSD and incorporating
OPERATIONS
comments implementation is still Company's comments
awaited (under CRM No# later.
DATE: 4040439708);
CONTROL NUMBER
VERIFICATION

4 Cone Penetration tests shall be 1) It is noted.


included within the Post quality
EDSD

control testing, in addition to plate


DATE:

load tests; settlement calculations


BY:

shall be, thereafter, undertaken by


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

utilizing correlations which are


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

direct applicable to CPTs e.g.


(DCC) NO. _____________________

Schmertmann method;

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
18
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0C Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0B)
Comments) ( in Rev.0C)
O.S.K

O.S.K

O.S.K

1) Post CPTUs tests have already


undertaken within Trial Calibration
areas, therefore, same to be
followed within the main works;
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

2) Plate load tests, unless a 2) It is noted.


prototype concrete footing is
DESCRIPTION

utilized by undertaking a full scale


load test, are, mostly, applicable for
verifying the compactness/strength
of the top soils up to depth of about
2-3m; therefore, no information are
obtained in relation to deeper
improved soil layers;
3) On completion of soil treatment 3) HAL will conduct
schemes, Post-compaction CPTs CPT passing enough
JO/EWO

10-01055

10-01055

10-01055

are, usually, carried out; Cone time after installation


Penetration Tests are, normally, of stone column for
performed at specified frequencies ensuring the
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

for quickly identifying the degree dissipation of excess


of compaction achieved within the pore water pressure in
NO.
REV

granular formations; each set shall case of cohesive soil.


0A

0C
0B

DISCIPLINE be consisted of one CPT at the In addition, the


ENGINEER
O.S KWON centroid of a grid and one at 1/3rd diameter of stone
DATE:
DEC.01 ‘2014 of two adjacent points; therefore, column will be
PROJECT
ENGINEER
the weakest point within the checked.
Y.G. PARK triangle of Stone Columns shall be → See section 8.4 (1)
DEC.01 '2014 tested; for places where fine
DATE: in blue text.
CERTIFIED grained soils (cohesive) exist, CPTs
J.S. NA
are not recommended, since
DEC.01 '2014
DATE: compatibility of such soils is not
CONSTRUCTION
AGENCY
significantly improved within
compaction incorporated at Stone
DATE: Column execution; at those cases,
OPERATIONS achievement of the required
diameter of the aggregate vertical
DATE:
column is the vital objective since
dissipation of pore water pressure
CONTROL NUMBER
VERIFICATION

(included within the low


EDSD

permeability soils) will be


accelerated through the drainage
DATE:
BY:

provided (in case of less diameter


the drainage path is reduced, and,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

then, consolidation is taking place


slower); therefore, excavation trials
(DCC) NO. _____________________

are recommended for identifying

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
19
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0C Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0B)
Comments) ( in Rev.0C)
that specified column diameter has
O.S.K

O.S.K

O.S.K

been achieved within accepted


tolerances;
4) HAL will evaluate
bearing capacity and
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

4) acceptance criteria in relation to settlement at specific


lower/upper bound limits of Post actual condition of
DESCRIPTION

CPTs shall be provided; minimum foundation. In case


values of cone resistance at various that the analysis
depths (at spacing of 1m) which are cannot be met with
satisfying the required criteria, the remedial
settlements/bearing capacities plan such as additional
specifications shall be clearly compaction or
given; those values are to be used additional installation
as references and compared to the of stone column will
actual Post CPTs values at same be selected and
depths; in case that less cone verified by numerical
JO/EWO

10-01055

10-01055

10-01055

resistance values are acquired, then, simulation.


remedial measures shall be taken;
→ See section 8.4 (3)
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

in blue text.
(5) Although it is indicated that
NO.
REV

0A

0C
0B

Post CPTs have been implemented,


DISCIPLINE
ENGINEER no clear texting has been provided
O.S KWON
addressing all above mentioned
DEC.01 ‘2014
DATE: issues, and, in addition, including
PROJECT
ENGINEER test frequency;
Y.G. PARK
DEC.01 '2014 5 Signed letter by the Main We issued the letter of
DATE:
CERTIFIED
Contractor (Hyundai Arabia "Confirmation of
J.S. NA Company LLC) indicating that Responsibility as
DATE:
DEC.01 '2014 report has been adequately peer LSTK Contractor on
CONSTRUCTION reviewed/endorsed/approved shall Stone Column Work",
AGENCY
be provided to CSD; exercise of JZR&TP-EPC2-L-
DATE:
Saudi Aramco CSD’s right to HAL-SA-0593, dated
OPERATIONS review and accept reports shall not Nov.18.2014.
relieve the Main Contractor of any
contractual obligations or
DATE:
liabilities; Main Contractor bears
CONTROL NUMBER
VERIFICATION

all risk in relation to adequacy and


EDSD

correctness of the information set


out in the report by the sub-
DATE:
BY:

contractor; Main Contractor is


liable and responsible for any
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

deficiency in sub-contractor’s work


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and its consequences on the


(DCC) NO. _____________________

project;

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
20
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

Contractor Response Company Contractor


Sheet Section Company Comments
No. (for Rev. 0C Comments Response
ENGG CERT

J.S.N

J.S.N

J.S.N
No. No. ( in Rev.0B)
Comments) ( in Rev.0C)
6 The frequency and
O.S.K

O.S.K

O.S.K

preliminary location
of post CPT is
described in the
method statement and
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

attached the requested


drawings again.
→ See section 8.4 (1)
DESCRIPTION

in red text.

The soil improvement


Attachments in relation to i) layout shows the
borehole data, ii) foundation location of Full Load
location plan, iii) soil improvement Test and CPT for Post
layout (shop drawings) are missing Quality Control
form revision 0B; Testing. Excavation
JO/EWO

10-01055

10-01055

10-01055

Test will be done to


check the design
diameter after
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

installation of stone
column and shall be
NO.

conducted at single
REV

0A

0C
0B

DISCIPLINE stone column near the


ENGINEER
O.S KWON post CPT location.
DATE:
DEC.01 ‘2014 Therefore, the total
PROJECT number of excavation
ENGINEER
Y.G. PARK
test will be same as
DEC.01 '2014 that of post CPT.
DATE:
CERTIFIED
J.S. NA

DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
21
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
ENGG CERT

J.S.N

J.S.N

J.S.N
Table of Contents
O.S.K

O.S.K

O.S.K

1. GENERAL .......................................................................................................................23
2. SCOPE OF WORK .......................................................................................................... 23
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

3. TERMS AND DEFINITIONS............................................................................................ 24


4. REFERENCE .................................................................................................................. 24
DESCRIPTION

5. LIST OF EQUIPMENTS AND REQUIRED PERSONNEL .............................................. 26


6. RESPONSIBILITY AND AUTHORITY............................................................................. 27
7. EXECUTION OF STONE COLUMN WORKS ................................................................. 29
8. QUALITY CONTROL PLAN ............................................................................................ 36
9. SITE ORGANIZATION CHART .................................................................................................41
JO/EWO

10-01055

10-01055

10-01055

10. QA/AC PLAN ................................................................................................................... 41


11. HSE PLAN ....................................................................................................................................42
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

ATTACHMENT.
NO.
REV

0A

0C
0B

NO.1 INSPECTION PLAN


DISCIPLINE
ENGINEER
O.S KWON
NO.2 JOB SAFETY ANALYSIS
DATE:
DEC.01 ‘2014 NO.3 PART OF GEO TECHNICAL INVESTIGATION REPORT - DIFFERENTIAL
PROJECT
ENGINEER
SETTLEMENT OF TANK
Y.G. PARK
DEC.01 '2014
NO.4 J95-A-DOC-VE-558297 - DESIGN NOTE - JAZAN REFINERY SITE COORDINATES
DATE:
CERTIFIED NO.5 BOREHOLE DATA
J.S. NA
NO.6 FOUNDATION LOCATION PLAN
DEC.01 '2014
DATE: NO.7 SOIL IMPROVEMENT PLAN ;
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
22
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
ENGG CERT

J.S.N

J.S.N

J.S.N
1. GENERAL
O.S.K

O.S.K

O.S.K

This work method statement describes the procedure for the installation of stone columns by
using Vibro-Replacement method. The quality test program of stone columns construction is also
given in this document.
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN


DESCRIPTION

2. SCOPE of work

The stratum in this project is revealed soil layer intermixed with coarse-grained & fine-
grained soils. And almost our target improved depth is 8m. Dynamic Compaction
method is suitable only sand layer, and Dynamic Replacement method could improve up
to below 6m. Therefore, it is suitable for Stone Column method in this project.
JO/EWO

10-01055

10-01055

10-01055

This procedure covers the requirements at the construction for soil improvement works
and all the other work as required for soil improvement by Stone Column Method.
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

Final Report (included post bearing capacity & settlement calculation) shall be submitted
for review and approval by COMPANY.
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
O.S KWON
Stone Column Works process to COMPANY for review and approval.
DEC.01 ‘2014
DATE:
PROJECT All engineering calculations and the factual final geotechnical investigation report must
ENGINEER
Y.G. PARK be peer-reviewed internally by the Contractor prior to submittal to COMPANY for review.
DEC.01 '2014
DATE:
CERTIFIED
Both the primary engineer and the peer-reviewed must be practicing geotechnical
J.S. NA
engineers.
DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY 2.1. Design Criteria
a) Allowable Settlement
DATE:
OPERATIONS
- Tank Foundation :

DATE: The settlement of tank foundation will be discussed with Tank Manufacturer and
CONTROL NUMBER
VERIFICATION

piping engineer internally, considering API 650 paragraph 7.3.6.6. Based on


EDSD

the agreed criteria, the design of stone column may be changed, if necessary.
DATE:

Tank Acceptance criteria will be a two (2) inch of edge and differential
BY:

settlement (0.008R) will be achieved.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
23
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
- Other Foundation : Foundation width less than 6.0m : 25mm
ENGG CERT

J.S.N

J.S.N

J.S.N
Foundation width greater than 6.0m : 50mm
O.S.K

O.S.K

O.S.K

b) Design Parameters

The design parameters of stone column such as distance of stone column, and
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

length of stone column can be adjusted based on the numerical simulation by


DESCRIPTION

DC vibro. The different grid from trial test may be utilized considering actual
load and geotechnical condition. For instance, if the applied load is low or soil
strength is high, the grid of stone column can be wider than that of trial test. It
is Contractor’s responsibility of stone column work due to the different grid from
trial test.

3. TERMS AND DEFINITIONS


JO/EWO

10-01055

10-01055

10-01055

COMPANY SAUDI ARAMCO OIL COMPANY


OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

Contractor HYNDAE ARABIA COMPANY LLC.


Sub-contractor Surjin Tech Co., Ltd.(SJTC)
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER SABP Saudi Aramco Best Practices
O.S KWON
DEC.01 ‘2014 SAEP Saudi Aramco Engineering Procedures
DATE:
PROJECT
ENGINEER SAES Saudi Aramco Engineering Standards
Y.G. PARK
DEC.01 '2014
SAMSS Saudi Aramco Material System Specifications
DATE:
CERTIFIED SATIP SAUDI ARAMCO Typical Inspection and Test Plan
J.S. NA

DEC.01 '2014 SAIC SAUDI ARAMCO Inspection Checklists


DATE:
CONSTRUCTION
AGENCY ASTM American Society for Testing Materials
SAPMT SAUDI ARAMCO Project Management Team
DATE:
OPERATIONS SAPID SAUDI ARAMCO Project Inspection Department

DATE: 4. REFERENCE
CONTROL NUMBER
VERIFICATION
EDSD

All design, engineering, materials and construction shall conform to the latest
DATE:

requirements of international standard / reference, local national standards, local


BY:

regulations and the follows reference documents. Latest edition at the time of contract
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

award shall be applicable.


(DCC) NO. _____________________

4.1. Reference documents


METHOD STATEMENT OF STONE COLUMN
DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
24
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
c) Facility Plot Plan :
d) Geotechnical Investigation Report by OSAIME : VE-636001
ENGG CERT

J.S.N

J.S.N

J.S.N

e) Soil Improvement Layout : VA634120_001~005,


O.S.K

O.S.K

O.S.K

VA634851_001~005
VA635451_001~008
f) Foundation Location Plan : VA634122_001~003
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

VA634872_001~003
VA635482_001~006
DESCRIPTION

4.2. Execution documents


a) This Method Statement
b) Shop Drawing for Stone Column Works

4.3. Codes and standards


JO/EWO

10-01055

10-01055

10-01055

This project shall be designed and implemented in accordance with the latest editions of
OCT 23,2014

DEC.01.2014
DATE

the applicable Saudi Aramco, industry and / or other Standards


NOV.17.2014

The following Saudi Aramco standards and specifications, as a minimum, are applicable
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
to this document. CONTRACTOR shall verify and finalize the full list of applicable
O.S KWON
DEC.01 ‘2014
standards and specifications during detailed engineering
DATE:
PROJECT
ENGINEER
Y.G. PARK
DEC.01 '2014
DATE:
SCHEDULE “Q” : Quality Assurance and Control, ITP
CERTIFIED
J.S. NA SCHEDULE “B” : Job Specifications
DEC.01 '2014
DATE: SCHEDULE “H” : Special Requirements
CONSTRUCTION
AGENCY Saudi Aramco Safety Handbook
DATE: Saudi Aramco General Instructions
OPERATIONS
SAES-A-100 : Survey Coordinates, Datum and Data Formats

DATE:
SAES-A-113 : Geotechnical Engineering Requirements
CONTROL NUMBER

SAES-A-114 : Excavation and Backfilling


VERIFICATION
EDSD

SAES-Q-001 : Criteria for Design and Construction of Concrete Structures


DATE:

SAES-O-100 : General Requirements Safety and Security


BY:

ASTM C-127 : Test Method for Density and Absorption of Coarse Aggregates
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

ASTM C-136 : Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
25
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
ASTM C-535 : Test Method for Resistance to Degradation of Large Size Coarse
Aggregates by Abrasion and Impact in the Los Angeles Machine
ENGG CERT

J.S.N

J.S.N

J.S.N

ASTM D-1194 : Spread Footing Load Test.


O.S.K

O.S.K

O.S.K

ASTM D-1241 : Aggregate Quality.


ASTM D-422 : Gradation of Soils.
ASTM C131-06 : Standard Test Method for Resistance to Degradation of Small-Size
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine


ASTM C29/C29M-09 : Standard Test Method for Bulk Density ( Unit Weight ) and Voids in
DESCRIPTION

Aggregate
HE-678015 : Health, Environment (HSE) Management Plan
HAL-QMD-002 : Project Quality Plan

Associated Forms:
SATIP-A-000-01 : Soil Improvement (Vibro Replacement & Vibro Compaction).
SAIC-A-1003 : Soil Protection and Control, Drainage and De-watering.
JO/EWO

10-01055

10-01055

10-01055

SAIC-A-1011 : Soil Improvement Vibro Replacement(Stone Column) Materials Approval,


OCT 23,2014

DEC.01.2014
DATE

Specialized Personnel Approval, Testing & Review of Test Reports


NOV.17.2014

Inspection.
NO.
REV

0A

0C
0B

DISCIPLINE
SAIC-A-1012 : Soil Improvement Vibro Replacement(Stone Column) Materials Receiving
ENGINEER
O.S KWON Inspection.
DEC.01 ‘2014
DATE:
PROJECT
SAIC-A-1013 : Soil Improvement Vibro Replacement(Stone Column) Pre-
ENGINEER
Y.G. PARK Installation(Survey) and Installation Inspection.
DEC.01 '2014
DATE:
CERTIFIED
J.S. NA 4.4. Execution documents
DEC.01 '2014
DATE: a) This Method Statement
CONSTRUCTION
AGENCY b) Shop Drawing for Stone Column Works
DATE:
OPERATIONS
4.5. Local legislative requirements
DATE: Works are subject to the laws of the Kingdom of Saudi Arabia
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:

5. LIST OF EQUIPMENTS and REQUIRED PERSONNEL


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

• Tools and Equipment


(DCC) NO. _____________________

a) Crane + Vibro
METHOD STATEMENT OF STONE COLUMN
DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
26
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
b) Dump Truck
c) Wheel Loader
ENGG CERT

J.S.N

J.S.N

J.S.N

d) Water Truck
O.S.K

O.S.K

O.S.K

e) Survey Equipment (Total Station)


f) High Water Pressure Pump
g) Extension Tube
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN


DESCRIPTION

• Personnel
a) Site Manager
b) Construction Engineer
c) QC Manager
d) QC Inspector
e) Safety Representative
JO/EWO

10-01055

10-01055

10-01055

f) Surveyor
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

g) Work Permit Receiver


h) Construction Foreman
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT
ENGINEER
6. RESPONSIBILITY AND AUTHORITY
Y.G. PARK
DEC.01 '2014
DATE: 1) Site Manager
CERTIFIED
J.S. NA
The Site Manager shall be responsible for the Project from the inception to the
DEC.01 '2014
DATE:
CONSTRUCTION
completion in coordination with the Contractor Manager. The Site Manager ensures
AGENCY
adherence to the statutory requirements and timely follow ups of such related matters to
DATE:
OPERATIONS
maintain the Time Schedule.

DATE: 2) Construction Engineer


CONTROL NUMBER
VERIFICATION

The Construction Engineer shall be responsible for the Design and Specifications
EDSD

Respect for the project. He ensures that a proper Design is established and adapted to
DATE:
BY:

each particular of the Project.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

In coordination with the QC Inspector he shall make sure that the working procedure
(DCC) NO. _____________________

meets with the technical specifications.

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
27
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
3) QC Manager
ENGG CERT

Verification and Checking for quality documents in accordance with requirement of


J.S.N

J.S.N

J.S.N

Company.
O.S.K

O.S.K

O.S.K

The QC Manager shall be solely responsible for the quality control of overall Quality
Issues.
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

4) QC Inspector
DESCRIPTION

QC Inspector directly report to QC Manager about overall issues and shall be


responsible verifies and check quality documents. He prepares Quality documents as per
Saudi Aramco Typical Inspection Plan (SATIP) & Saudi Aramco Inspection Checklist
(SAIC) for the activities.

QA/QC implements:
JO/EWO

10-01055

10-01055

10-01055

a) QA/QC of Civil Works including the Quality Plan.


OCT 23,2014

DEC.01.2014
DATE

b) Monitoring the Site Daily QC activities.


NOV.17.2014

c) In coordination with the Site Manager, well in advance, they prepare the daily
NO.
REV

0A

0C
0B

DISCIPLINE
inspection and execution program to be submitted to the Engineer.
ENGINEER
O.S KWON d) Records daily inspections, procedures and checklists.
DEC.01 ‘2014
DATE:
PROJECT
e) Coordinates and inspects testing matters.
ENGINEER
Y.G. PARK f) Attends the processing of material submittals and obtaining approvals.
DEC.01 '2014
DATE: g) Issues deficiency or non-conformity reports.
CERTIFIED
J.S. NA
h) Carries out site inspection in accordance with the relevant checklists and
DEC.01 '2014
DATE:
CONSTRUCTION
drawings.
AGENCY

DATE: 5) Site Safety Representative (safety officer)


OPERATIONS
The safety officer assists the contractor’s HSE manager and is responsible for monitoring
DATE: the Contractor’s performance and assist with the implementation of the safety program
CONTROL NUMBER
VERIFICATION

where required. For day to day safety matters the safety officer deals directly with the
EDSD

Subcontractors to resolve problems. To ensure that Contractors adopt, implement and


DATE:

maintain
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

A safety process in accordance with the Project Safety Plan and Procedures as outlined
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

in the Safety Manual.


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
28
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

A full time Safety Representative shall be appointed.


ENGG CERT

J.S.N

J.S.N

J.S.N

a) To administer the Health, Safety and Environment Plan of the project throughout
O.S.K

O.S.K

O.S.K

the duration of the contract.


b) Promote public and Project Safety through general safety orientations and Toolbox
Talks/Meetings. Attendance of which shall be kept for documentation.
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

c) Monitor job site working conditions and safety practices; maintain the responsibility
DESCRIPTION

of First
Aid Facilities and Health Programs.
d) Ensure that all Personal Protective Equipment is utilized as appropriate.
e) Conduct weekly site safety inspection in conjunction with the Site Manager. This
must be documented.
f) Investigate all accident/incident and make recommendation to prevent recurrence
of the same.
JO/EWO

10-01055

10-01055

10-01055

6) Surveyor
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

a) Setting out of control points and taking settlement reading


NO.
REV

0A

0C
0B

b) Layout for SC points


DISCIPLINE
ENGINEER
O.S KWON
c) Establish ground levels before and after soil improvement
DATE:
DEC.01 ‘2014
d) Measuring of any backfilling during the soil improvement process
PROJECT
ENGINEER
e) Marking of locations for QA/QC tests after Stone Column
Y.G. PARK
DEC.01 '2014
DATE:
CERTIFIED
J.S. NA

DEC.01 '2014 7. EXECUTION OF STONE COLUMN WORKS


DATE:
CONSTRUCTION
AGENCY
7.1. Application of Stone Column Works
DATE:
OPERATIONS
Stone Column works shall conform to the latest drawings of SC Layout

7.2. Execution of Stone Column Works


DATE:
CONTROL NUMBER
VERIFICATION

7.2.1. Summary of Stone Column


EDSD

DATE:
BY:

Stone Columns are, as name indicates, built with stones to stabilize the subsoil before
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

constructing foundations .These are widely used because of its economic character and
(DCC) NO. _____________________

easy installation. Vibro replacement is the accepted method for construction used with

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
29
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
special depth vibrators for subsoil improvement. The vibro-replacement method is a wet
method which is used to compact the stone .The process of compacting cycle is
ENGG CERT

J.S.N

J.S.N

J.S.N

repeated step by step to the surface resulting in a dense column of granular material
O.S.K

O.S.K

O.S.K

interlocking with the surrounding ground, hence, the output is increased bearing capacity,
decrease of settlement, increase of dewatering, reinforcement of slope etc... by using
Stone Column. Nowadays Stone columns are becoming more popular, because
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

engineers and technologists realize the fact that, increased characteristics of subsoil
condition will definitely decrease the cost of foundation, size of foundation etc, thereby
DESCRIPTION

also getting time saving too.


JO/EWO

10-01055

10-01055

10-01055

Aggregates(Stone
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014
NO.
REV

DEFORM
0A

0C
0B

DISCIPLINE
ENGINEER
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT
ENGINEER
Y.G. PARK CONTACT SURFACE
DEC.01 '2014
Vibro-tip(flush water
DATE:
CERTIFIED
J.S. NA Equipment(Crane+Vibro
DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY 7.2.2. Priciple of Stone Column

DATE: Vibro stone columns are installed to reinforce cohesive soils and to densify granular soils
OPERATIONS
in order to increase bearing capacity, decrease total and differential settlement, provide
DATE: vertical drainage pathways to increase the time-rate of consolidation settlement, and to
CONTROL NUMBER
VERIFICATION

reduce the potential of liquefaction. In contrast with vibro compaction which is


EDSD

undertaken solely to compact granular soils, stone columns may be installed in granular
DATE:

or cohesive soils. Vibro stone columns are relatively stiff with respect to the surrounding
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

ground. Nonetheless, stone columns should not be viewed as rigid structural elements or
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

pilings. Traditional deep foundation elements effectively bypass the shallow, weak strata
(DCC) NO. _____________________

and transfer loads from the structure to the underlying bearing stratum. Both the stone
METHOD STATEMENT OF STONE COLUMN
DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
30
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
columns and the stiffened/reinforced weak strata are loaded, with the proportion of the
load carried dependent upon the relative stiffness of the stone columns and the
ENGG CERT

J.S.N

J.S.N

J.S.N

surrounding soils. Stone columns therefore reduce the stress differential induced to the
O.S.K

O.S.K

O.S.K

overlying foundation. Idealized stress distribution patterns for deep foundation systems
and for stone column systems are depicted in below figures.
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN


DESCRIPTION
JO/EWO

10-01055

10-01055

10-01055
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT 『Idealized stress distribution 『Idealized stress distribution
ENGINEER
Y.G. PARK
Pattern for Piles system』 Pattern for Stone Column』
DEC.01 '2014
DATE:
CERTIFIED
J.S. NA
7.2.3. Working Sequence of Stone Column
DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________


METHOD STATEMENT OF STONE COLUMN
DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
31
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

『Wet top feed method process schematic』


ENGG CERT

J.S.N

J.S.N

J.S.N

O.S.K

O.S.K

O.S.K

• Setting out of Stone Column location


METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

Sub-contractor shall deploy professional surveyors to setting out the stone column
DESCRIPTION

center positions in accordance with SC layout Plan Drawing

Pegs of above working level shall be used to mark a stone column location and shall a
tag identifying the stone column number.

However, in order to carry out the survey work, to photographic drawing showing at
least two bench marks, their coordinates and elevation shall be provided by client.
JO/EWO

10-01055

10-01055

10-01055

• Equipment
The essential equipment for the vibro technique is a vibrator – a long heavy tube
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

enclosing eccentric weights – driven by electric power pack and high water pressure
NO.
REV

0A

0C

pump. Extension tubes are added as necessary for reaching the final depth and the
0B

DISCIPLINE
ENGINEER whole assembly is suspended from a crane.
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT
ENGINEER • Effluent Water
Y.G. PARK
DEC.01 '2014
The effluent water shall be conveniently contained within the working area by
DATE:
CERTIFIED providing sand heap. The stone columns, which also act as free drains, allow the
J.S. NA

DEC.01 '2014 water to seep back into the ground in few hours after the vibro unit water jets are
DATE:
CONSTRUCTION
AGENCY turned off.

DATE:
OPERATIONS • Disposal of mud/clay
During the progress of stone column installation work in an area, the level of the area
DATE:
shall be raised due to the fine grain clay coming out during stone column installation.
CONTROL NUMBER
VERIFICATION
EDSD

During the execution of stone column, Sub-contractor shall remove this spoil material
and dispose it in the dumping site, from time to time as when required for proper
DATE:
BY:

advancement of its work


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SC Work Sequence
a) Penetration of a vibro probe until design depth with air & water jetting
METHOD STATEMENT OF STONE COLUMN
DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
32
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
Vibroprobe penetrates to depth due to own weight, vibration, and the jetting
action of water/air.
ENGG CERT

J.S.N

J.S.N

J.S.N

Penetration eased by water and / or air flushing from the lower nozzles of the
O.S.K

O.S.K

O.S.K

vibrator to fluidize or liquefy the soil surrounding the probe.


Annular space is formed around the probe.
Water jets, optionally complemented with limited amounts of compressed air are
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

adjusted to keep the annular space open.


Even if the vibroprobe encounters the early refusal, which the maximum load of
DESCRIPTION

vibro motor is 175amp, stone column is installed with pre-augering by DH-508


equipment.
b) Exceptively, if water in a hole contains much mud, a vibro probe is uplifted up to
GL-1.0m with air & water jetting to remove mud (holding time: 2~5 min), and
then re-penetrated until design depth.
c) Filling & Compacting of stone material after uplifting of a vibro probe at
JO/EWO

10-01055

10-01055

10-01055

intervals of 1.0~2.0m.
After aggregate is introduced into the hole and fills the annular space, vibro
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

probe is re-penetrated. Horizontal forces laterally compact and press the filled
NO.
REV

0A

material against the in situ soil. The holding times don’t be required in the top
0C
0B

DISCIPLINE
ENGINEER feed method.
O.S KWON

DATE:
DEC.01 ‘2014 Compaction factor to be used is 5 ~ 7% in Stone Column works
PROJECT
ENGINEER The final working procedure is able to change as per equipment and site
Y.G. PARK
DEC.01 '2014
DATE:
condition for uplift interval, penetration velocity and compaction factor
CERTIFIED
J.S. NA

DEC.01 '2014 The Production Parameters


DATE:
CONSTRUCTION Description Remarks
AGENCY
Boundary of
175amp
Vibro Motor
DATE:
SC
OPERATIONS Penetration Average 0.5m/min
Boundary of D=1000mm
Penetration Velocity SC
Average 0.6m/min
DATE: D=900mm
Compacting
CONTROL NUMBER
VERIFICATION

Uplift One time per 1.0~2.0m


of stone Material
EDSD

DATE:

7.2.4. Effect of Stone Column installation


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

• Compaction of compatible layers


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
33
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
Layers of clean sand and gravel and slightly silty sand (up to 20% fines content)
are compacted during the process of stone column installation.
ENGG CERT

J.S.N

J.S.N

J.S.N
O.S.K

O.S.K

O.S.K

• Reinforcement of the soil


Column and soil form a reinforced matrix with instantly increased shear resistance
and stiffness modulus. The high friction angle of the column material gives an
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

immediate overall increase in shear strength to the composite of soil and column.
DESCRIPTION

• Drainage
The columns accelerate drainage (consolidation) of the cohesive soil, i.e. the
columns work as vertical drains and thereby accelerate reduction of harmful
excess pore pressures.

7.2.5. Advantages of Stone Colum


JO/EWO

10-01055

10-01055

10-01055
OCT 23,2014

DEC.01.2014
DATE

Reinforcement of the soil with stone columns provides:


NOV.17.2014

1) Improvement of the bearing capacity of the soil to deeper depths by flushing out
NO.
REV

0A

0C
0B

DISCIPLINE bad soil and


ENGINEER
O.S KWON
DEC.01 ‘2014
putting in good quality compacted stone aggregate.
DATE:
PROJECT
ENGINEER
2) Reduction of foundation settlements.
Y.G. PARK
3) Acceleration of the consolidation process.
DEC.01 '2014
DATE:
CERTIFIED 4) Reduction of the risk of liquefaction due to seismic activity.
J.S. NA

DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
34
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H

7.2.6. Water Supply


ENGG CERT

J.S.N

J.S.N

J.S.N

Water shall be obtained at the sea water of project site, during the course of stone
O.S.K

O.S.K

O.S.K

column with Document Reference # JZR&TPD-L-0089/2013 and date of approval last


May 26, 2013 due to lacking source of water on Jazan Site.
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

7.2.7. Stone Material for Stone Column Works


DESCRIPTION

For installation of stone columns crushed stone aggregates ranging in size of 1" to 4"
shall be used having the following specifications.

No. Test Description Standard Reference Acceptable Limits


Size of stone shall 1"to 4"
1 Sieve Analysis ASTM C-136
down.
Los Angles Abrasion loss@1000
2 ASTM C-535 50% Max.
cycles.
JO/EWO

10-01055

10-01055

10-01055

Soundness test,Loss Magnesium


3 ASTMC 88 18% Max.
Sulphate
4 Specific Gravity ASTM C-127 Sp. Gravity = 2.40 min
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

5 Absorption ASTM C-127 3% Max.


NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT 7.2.8. Stone Column Works Photographs
ENGINEER
Y.G. PARK
DEC.01 '2014
DATE:
CERTIFIED
J.S. NA

DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:

『 Up and down movement of Vibro tip for the SC Installation』


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
35
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
ENGG CERT

J.S.N

J.S.N

J.S.N
O.S.K

O.S.K

O.S.K
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN


DESCRIPTION

『 Supply of aggregates to an excavated hole by Pay Loader』

8. QUALITY CONTROL PLAN


JO/EWO

10-01055

10-01055

10-01055

8.1. Daily Records


OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

• INSPECTION REPORT FO
STONE COLUMNS
NO.
REV

0A

0C
0B

(VIBRO REPLACEMENT

DISCIPLINE

Project Title: JAZAN REFINERY&TERMINAL PROJECT (EPC #2)

ENGINEER Once Stone Column RFI No:RFI-CV-SJ-0151


Location/Area:
Ref. Draw

O.S KWON
installation. Operator: ALI

DEC.01 ‘2014 Stone Column No. 149 Stone Column N


DATE:
STONE
PROJECT

SL. DEPTH TIME CONSUMPTION SL. DEPTH
ENGINEER Checked following below NO (M) (00:00) IN BUCKETS NO (M)
Y.G. PARK ( m3 )
item. 1 0 0:00 1
DEC.01 '2014 2 12 0:24 2
DATE:
3 10 0:25 2 3
CERTIFIED
J.S. NA • 4
5
10.5
9
0:27
0:28
4
5
6 6
DEC.01 '2014 7 7
DATE:
CONSTRUCTION • 1) Level Position of Vibro 8
9
8
9
AGENCY
Probe tip 10 10
11 11
12 12

DATE: 13 13

OPERATIONS • 2) Volume of Inserted 18 18


19 19
filler 20 20
21 21
Remarks : Remarks :


DATE:
3) Installation Time
CONTROL NUMBER
VERIFICATION

FINAL ACCEPTANCE NAME/SIGNATURE


EDSD

SUBCONTRACTOR AZAD BILAL

CONST Su Kwon
SECL
QA/QC Franz Campaner
DATE:

• E/E Joselito A. Elican


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
36
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
8.2. Full Scale Short-Term Plate Load Test
Post quality control test is performed for identifying the successful completion of the
ENGG CERT

J.S.N

J.S.N

J.S.N

ground improvement scheme.


O.S.K

O.S.K

O.S.K

• Load Test Procedure


METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

In order to confirm the achievement of required bearing capacity, full-scale plate


load tests shall be performed in specified areas on locations selected by the client
DESCRIPTION

The test setup and procedure described in this chapter shall be conformed in
principal the recommendation given in ASTM D 1194

Following installation of stone columns, the stone column area to be tested shall
be excavated to remove any loose deposits and the disturbed surface shall be
compacted by roller.
JO/EWO

10-01055

10-01055

10-01055

A reinforced concrete test footing of specialized size shall be placed over the
centre of the four stone columns. The test plate shall be placed on the surface of
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014

excavated ground.
NO.
REV

0A

0C
0B

The test load shall be loaded in 25% increments of design load for each loading
DISCIPLINE
ENGINEER step to 150% of design load after improvement.
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT
A 200 ton hydraulic jack shall be used to apply the load. The hydraulic jack shall
ENGINEER
Y.G. PARK react against steel platform loaded with reinforced concrete blocks of dimensions
DEC.01 '2014
DATE: 1X1X2m weighing – 50 kN each. The supporting block for the loaded steel
CERTIFIED
J.S. NA
platform shall be at a distance not less than 2.4 m from the centre of loaded area.
DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY
Acceptance Criteria:
DATE:
OPERATIONS a) Maximum settlement of test footing (2.0m x 2.0m) at design load is less than or
equal to 25 mm(foundation width less than 6.0m), 50mm(foundation width
DATE:
greater than 6.0m)
CONTROL NUMBER
VERIFICATION

b) Shear failure is not observed at any stage of loading up to maximum applied


EDSD

load.
DATE:
BY:

c) The applied load is measured by a pressure gauge. Each load is hold for the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

time until the rate of settlement is equal to or less than 0.25mm/hour (0.025mm/
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________________

6 minutes).

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
37
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
ENGG CERT

J.S.N

J.S.N

J.S.N
• Measurement of Settlement
Dial gauge with the least count, 0.01mm shall be used to measure the settlement
O.S.K

O.S.K

O.S.K

at each load step and at intervals of 0, 1, 2, 3, 6, 10, 15 and 20 minutes. For


longer duration of holding time after completion of 15 minutes additional readings
are taken at 15 minutes interval up to one (1) hour and thereafter at 30 minutes
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

interval. The settlement is measured with respect to reference beams placed on


DESCRIPTION

other side of the test plate and supported at distance not closer than 2.4m from
the centre of the loaded area.

Before moving the next load increment, the settlement shall be checked by
dividing by the time interval between them. The rate of settlement should be less
than or equal to 0.25mm/hour (0.025mm/6min) which is considered as near zero
settlement.
JO/EWO

10-01055

10-01055

10-01055
OCT 23,2014

DEC.01.2014
DATE


NOV.17.2014

Test Equipment
The equipments for plate load test shall be as follows.
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
Hydraulic Jack (Lukas 200-100/200)
O.S KWON
DEC.01 ‘2014 Jack capacity : 200tons
DATE:
PROJECT
ENGINEER Jack required : 1 no.
Y.G. PARK
DEC.01 '2014
Jack piston area : 452.4cm2
DATE:
CERTIFIED
J.S. NA

DEC.01 '2014 Dial Indicators


DATE:
CONSTRUCTION
AGENCY
Least Count : 0.01mm
Maximum travel : 50mm
DATE:
OPERATIONS Dial Indicators : 4 Nos.

DATE:
Pressure Gauge
CONTROL NUMBER
VERIFICATION

Least Count : 5 bar or 5kg/cm2


EDSD

Maximum Reading : 600 bar or 600kg/cm2


DATE:
BY:

Gauges to be used : 1 No.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Valid Calibration certificates shall be provided for all the above gauges.

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
38
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
A test report shall be submitted at the end of test. It shall comprise of the
following information:
ENGG CERT

J.S.N

J.S.N

J.S.N

a) Summary of test results and conclusion


O.S.K

O.S.K

O.S.K

b) Graphical presentation of test readings, load/time, time/settlement and


load/settlement curves.
c) Test Readings
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

d) Location plan of test


DESCRIPTION

e) Calibration certificates of the gauges etc.


JO/EWO

10-01055

10-01055

10-01055
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014
NO.
REV

0A

0C
0B


DISCIPLINE
ENGINEER
O.S KWON


DEC.01 ‘2014
DATE:
PROJECT
ENGINEER
Y.G. PARK
8.3. Inspection Plan
DEC.01 '2014
DATE: ▣ Reference Code:
CERTIFIED
J.S. NA
▶SATIP-A-000-01: Soil Improvement (Vibro Replacement & Vibro Compaction)
DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY
8.4. Post Quality Control Testing
DATE:
OPERATIONS
1) QC Testing after SC Works

• The three(3) tests of Full Scale Load Test and fifteen (15) CPTs including excavation
DATE:
CONTROL NUMBER

test for the checking of design diameter of stone column will be conducted. The
VERIFICATION

precise location of full load test and CPTs are shown as Attachement #07.
EDSD

DATE:
BY:

• The post CPT shall be conducted passing enough time after installation of stone
APPROVAL/CERTIFICATION REQUIREMENTS,

column considering the dissicipation of excess pore water pressure in case of


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

cohesion soil.
(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
39
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
ENGG CERT

J.S.N

J.S.N

J.S.N
2) Excavation Test


O.S.K

O.S.K

O.S.K

Excavation Test will be done to check the design diameter after installation of stone
column and shall be conducted at single stone column near the post CPT location.
Therefore, the total number of excavation test will be same as that of post CPT, i.e.
fifteen (15).
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

3) QC Testing Plan of Stone Column Material


DESCRIPTION

SC Material : 20,000 m3/test

4) Analysis of Result of Post CPT

• It will evaluate bearing capacity and settlement at specific actual condition of


foundation. In case that the analysis cannot be met with criteria, the remedial plan
such as additional compaction or additional installation of stone column will be
selected and verified by numerical simulation.
JO/EWO

10-01055

10-01055

10-01055
OCT 23,2014

DEC.01.2014
DATE

<Intentionally Blank>
NOV.17.2014
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT
ENGINEER
Y.G. PARK
DEC.01 '2014
DATE:
CERTIFIED
J.S. NA

DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
40
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
EDSD REV
REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0A OCT 23,2014 10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N A.S.H
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, NOV.17.2014 A.S.H

J.S. NA
0B 10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N

AGENCY
O.S KWON
BY:

PROJECT

Y.G. PARK
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
0C

DEC.01 '2014
DEC.01.2014 A.S.H

OPERATIONS
CONSTRUCTION
10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N

DEC.01 '2014
DEC.01 ‘2014
(DCC) NO. _____________________ DATE:

JAZAN
Saudi Aramco 2616-ENG (03/99)

Site Manager

Y.ISONG

QC Manager Project Manager


9. Site Organization Chart

Anjum J.D SUNG

QC Inspector Safety Officer

METHOD STATEMENT OF STONE COLUMN


Raja Karim

JAZAN REFINERY & TERMINAL PROJECT-EPC#2


Mechanic Site Eng.. Admin Manager

C.J An T.H Lee W.K Park

SAUDI ARABIA
Surveyor Foreman Documentation

DOC
Naeem Kalid Sherif

J34
Helper Operator(Prove)
SAUDI ARABIAN OIL COMPANY

Skilled Labor 2 Men

A
DWG.TYPE PLANT NO. INDEX
Rigger Helper

JO# 10-01055-0002
2 Men Unskilled Labor

DRAWING
Equip Operator(Shvel)

VE - 678054
2 Men

45
41
OF
SHT. NO.: REV.

0C

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
ENGG CERT

J.S.N

J.S.N

J.S.N
10. QA/QC PLAN
O.S.K

O.S.K

O.S.K

10.1 Quality Assurance


Our Management Policy is to meet the requirements of ISO 9001. Our links are our
Potential Customers / Clients who favor us seeking our Services. Our services are
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

solely dedicated to their requirements specified in the Contract, adhering to quality


workmanship and delivery strictly according to given schedule. We provide herewith
DESCRIPTION

our Field Quality Control Plan.


JO/EWO

10-01055

10-01055

10-01055
OCT 23,2014

DEC.01.2014
DATE

NOV.17.2014
NO.
REV

0A

0C
0B

DISCIPLINE
ENGINEER
O.S KWON
DEC.01 ‘2014
DATE:
PROJECT
ENGINEER
Y.G. PARK
DEC.01 '2014
DATE:
CERTIFIED
J.S. NA

DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
42
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A.S.H

A.S.H
A.S.H
11. HSE PLAN
ENGG CERT

J.S.N

J.S.N

J.S.N
11.1 HSE Strategy
Sub-contractor takes care of the health, safety and environment program in the
O.S.K

O.S.K

O.S.K

project to help prevent any human distress, financial loss and to execute the project
safely.
This safety program is intended to promote a safe working environment by educating
METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

METHOD STATEMENT OF STONE COLUMN

and training the workforce to regard safety as important as production.


DESCRIPTION

This various safety aspects described in the following chapters shall be strictly
observed and any violation shall be viewed seriously.
The Sub-contractor requires that, the employees at all levels shall support this HSE
program. The Project Manager shall ensure the effective implementation of this
project specific Health, Safety and Environment program to achieve the target of
Zero Accident in this project.
Sub-contractor supports this HSE Plan under the guidelines and prevailing Rules and
JO/EWO

10-01055

10-01055

10-01055

Regulations of SAUDI ARAMCO. This HSE Plan for site preparation serves as an
OCT 23,2014

DEC.01.2014
DATE

interim HSE Plan to the main HSE Plan.


NOV.17.2014

The main language of the project will be English. All documentation will be in English
NO.
REV

0A

0C
0B

DISCIPLINE
and training will primarily be conducted in English. All level of management,
ENGINEER
O.S KWON supervision, craft foreman and safety personnel must be fluent in English to be
DEC.01 ‘2014
DATE:
PROJECT
accepted to work on the project. Translators will be employed to translate into all
ENGINEER
Y.G. PARK other languages the workers employed speak to assist in communication, instruction,
DEC.01 '2014
DATE: training, and toolbox talks.
CERTIFIED
J.S. NA

DEC.01 '2014
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

METHOD STATEMENT OF STONE COLUMN


DWG.TYPE PLANT NO. INDEX DRAWING SHT. NO.: REV.
DOC
43
JAZAN REFINERY & TERMINAL PROJECT-EPC#2
J34 A VE - 678054 OF 0C
JAZAN SAUDI ARABIA JO# 10-01055-0002 45
EDSD/2616-0399.doc
EDSD REV
REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0A OCT 23,2014 10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N A.S.H
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, NOV.17.2014 A.S.H

J.S. NA
0B 10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N

AGENCY
O.S KWON
BY:

PROJECT

Y.G. PARK
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
0C

DEC.01 '2014
DEC.01.2014 A.S.H

OPERATIONS
CONSTRUCTION
10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N

DEC.01 '2014
DEC.01 ‘2014
(DCC) NO. _____________________ DATE:

JAZAN
Saudi Aramco 2616-ENG (03/99)

11.2 HSE PLAN

METHOD STATEMENT OF STONE COLUMN


11.3 HSE Activities (Equipment)

JAZAN REFINERY & TERMINAL PROJECT-EPC#2


SAUDI ARABIA
DOC
J34
SAUDI ARABIAN OIL COMPANY

A
DWG.TYPE PLANT NO. INDEX

JO# 10-01055-0002
DRAWING

VE - 678054
45
44
OF
SHT. NO.: REV.

0C

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0A OCT 23,2014 10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N A.S.H
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, NOV.17.2014 A.S.H

J.S. NA
0B 10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N

AGENCY
O.S KWON
BY:

PROJECT

Y.G. PARK
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
0C

DEC.01 '2014
DEC.01.2014 A.S.H

OPERATIONS
CONSTRUCTION
10-01055 METHOD STATEMENT OF STONE COLUMN O.S.K J.S.N

DEC.01 '2014
DEC.01 ‘2014
(DCC) NO. _____________________ DATE:

JAZAN
Saudi Aramco 2616-ENG (03/99)

11.4 HSE Activities

METHOD STATEMENT OF STONE COLUMN

JAZAN REFINERY & TERMINAL PROJECT-EPC#2


SAUDI ARABIA
DOC
J34
SAUDI ARABIAN OIL COMPANY

A
DWG.TYPE PLANT NO. INDEX

JO# 10-01055-0002
DRAWING

VE - 678054
45
45
OF
SHT. NO.: REV.

0C

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ATTACHMENT# 1 : inspection plan
SAUDI ARAMCO ID/PID - 20-AUGUST-11 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
SATIP No. APPROVED DATE DISCIPLINE:
Saudi Aramco TYPICAL INSPECTION PLAN
SOIL IMPROVEMENT (VIBRO REPLACEMENT & VIBRO COMPACTION) SATIP-A -000-01 30-Apr-13 CIVIL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

6600030002/BI-10-
JAZAN REFINERY AND TERMINAL PROJECT EPC # 2 Huyndai Arabia Company LLC/Surjin Tech. Co. Ltd.
01055

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD
Subcon Contractor SA

1.0 DOCUMENT REVIEW

Soil Improvement (Vibro Replacement) Method Method


1.1 RH RH R
Method Statement Statement Statement

Soil Improvement Vibro Replacement


1.2 (Stone Columns) Material Source SAIC-A-1011 SAIC-A-1011 RH RH R
Approval & Review of Test Reports
RECEIVING
2.0
INSPECTION
Soil Improvement Vibro Replacement
2.1 (Stone Columns) Materials Receiving, SAIC-A-1012 SAIC-A-1012 H W W
Sampling and Testing Inspection

3.0 INSTALLATION

Soil Improvement - Pre-installation


3.1 SAIC-A-1013 SAIC-A-1013 H H W
(Survey) Inspection

Soil Improvement Vibro Replacement


3.2 SAIC-A-1014 SAIC-A-1014 H H W
(Stone Columns) Installation Inspection

3.3 Verification of Soil Improvement SAIC-A-1015 SAIC-A-1015 H H W

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period Saudi Aramco Inspection may adjust the levels of
1 Saudi Aramco participation based upon the Contractor's performance
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not
3 present

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Page 1 of 1
SAUDI ARAMCO ID/PID - 20-AUGUST-11 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Soil Improvement Vibro Replacement (Stone Columns)
SAIC-A-1011 30-Apr-13 CIVIL-
Material Source Approval & Review of Test Reports
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER ORK PERMIT REQUIRE

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

A Vibro Replacement (Stone Columns) Materials

Note: To verify that the area/material being inspected was tested by a


SA approved third party testing agency, the test results attached with this
RFI shall be verified by the relevant PID inspection Unit if copy of the
test results had been received directly from the 3rd party lab. If not
available in the PID inspection Unit, the inspector shall contact the third
party lab rep and request for an explanation. If explanation is not
reasonable, NCR shall be issued to the 3rd party lab through the Batch
Plants & Civil Testing Group.

Gradation - - 1” to 4”. (No specific gradation is required as per ASTM C- ASTM C 33 Sec.
A1
136) 12

Los Angeles Abrasion Loss @ 1000 revolutions - - 50 % max. (ASTM C- ASTM C 33 Sec.
A2
535) 12

ASTM C 33 Sec.
A3 Soundness Test, Loss by Magnesium Sulfate - - 18% max. (ASTM C-88)
12

ASTM C 33 Sec.
A4 Specific Gravity - - 2.40 min. (ASTM C-127)
12

ASTM C 33 Sec.
A5 Absorption - - 3% max. (As per ASTM C-127)
12

B Testing and Equipment

All equipment shall be calibrated and certified within the 6-month period Schedule "Q"
B1
before use by one of Saudi Aramco-approved calibration agencies. Section 7.1

Page 1 of 1
SAUDI ARAMCO ID/PID - 20-AUGUST-11 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Soil Improvement Vibro Replacement (Stone Columns)
SAIC-A-1012 30-Apr-13 CIVIL-
Materials Receiving Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Vibro Replacement (Stone Columns) Materials

Gradation - - 1” to 4”. (No specific gradation is required as per ASTM C- ASTM C 33 Sec.
A1
136) 12

Los Angeles Abrasion Loss @ 1000 revolutions - - 50 % max. (ASTM ASTM C 33 Sec.
A2
C-535) 12

Soundness Test, Loss by Magnesium Sulfate - - 18% max. (ASTM C- ASTM C 33 Sec.
A3
88) 12

ASTM C 33 Sec.
A4 Specific Gravity - - 2.40 min. (ASTM C-127)
12

ASTM C 33 Sec.
A5 Absorption - - 3% max. (As per ASTM C-127)
12

REMARKS:

REFERENCE DOCUMENTS:
1- Approved Method Statement for Soil Improvement
2- SAES-A-114 -- Excavation and Backfill, 23 February 2010
3- ASTM C136 -- Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
4- ASTM C535 -- Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate
by Abrasion and Impact in the Los Angeles Machine
5- ASTM C127 -- Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1
SAUDI ARAMCO ID/PID - 20-AUGUST-11 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Soil Improvement - Pre-Installation (Survey) Inspection SAIC-A-1013 30-Apr-13 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER ORK PERMIT REQUIRE

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

A Pre- Installation (Survey) Inspection

Coordinates will be based on the Universal Transverse Mercator (UTM)


SAES-A-100
A1 coordinate system and referenced to the International 1924 Ellipsoid,
Sec. 4.1
Ain (Ayn) Al Abd 1970 Datum¹.

Major Plant facilities will be referenced to a local plant grid which in turn SAES-A-100
A2
is tied into the UTM coordinate system. Sec. 4.3

Offshore depth soundings are referenced to Lowest Astronomical Tide SAES-A-100


A3
(LAT). Sec. 5.1

Land elevations are referenced to Mean Sea Level (MSL) vertical datum SAES-A-100
A4
for all. Sec. 5.2

Method
Location shall be as per approved drawings, Scope of Work and Method Statement /
A5
Statement. Approved
Drawings

Tolerance for deviation of location shall be as per Project Specification Method


A6
and Method Statement. Statement

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-100 - Survey Coordinates, Datum's and Data Formats, 30 April 2007
2- Approved Method Statement for Soil Improvement
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1
SAUDI ARAMCO ID/PID - 20-AUGUST-11 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Soil Improvement Vibro Replacement (Stone Columns)
SAIC-A-1014 30-Apr-13 CIVIL-
Installation Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER RK PERMIT REQUIR

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

A Stone Column Installation Inspection

Tolerances for the depth of Stone Columns shall be as per IFC drawing Method
A1
or approved method statement. Statement

Ampere readings for S-Vibrator for Compaction of Stone Columns


Method
A2 (printout review) shall range between 160 to 180 amps or as specified in
Statement
approved Method Statement.

Depth Installation of Stone Column Depth and Compaction shall be as


SAES-A-100/ IFC
A3 per issued IFC drawings and referenced to survey markings as
Drawings
conducted officially based on SAIC-A-1013.

Setting out of Stone Column Positions shall be as per issued IFC


SAES-A-100/ IFC
A4 drawings and referenced to survey markings as conducted officially
Drawings
based on SAIC-A-1013.

Working Levels (W.L.) have been established before any Soil SAES-A-100/ IFC
A5
Improvement Works are commenced. Drawings

Daily Vibro Records have been accomplished and officially submitted to Method
A6
Saudi Aramco representatives. Statement

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-100 - Survey Coordinates, Datum's and Data Formats, 30 April 2007
2- Approved Method Statement for Soil Improvement
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: Work
T&I Witnessed QC Record Reviewed
Name, Initials and Date: Name, Initials and Date: Verified

QC Inspector PID Representative


Work
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed
Name, Initials and Date: Name, Initials and Date: Verified

QC Supervisor Proponent and Others


Quality Record Approved: Work
Name, Organization, T&I Witnessed QC Record Reviewed
Name, Sign and Date: Verified
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1
SAUDI ARAMCO ID/PID - 20-AUGUST-11 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Verification of Soil Improvement SAIC-A-1015 30-Apr-13 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

A General

The Geotechnical Contractor shall provide an Engineer or Geologist in


the field full-time during exploration activities. The Engineer/Geologist SAES-A-113
A1
shall supervise and observe all subsurface exploration operations, Sec. 5.3
classify samples and prepare log of borings, soundings, pits etc.

For the field tests, the Geotechnical Contractor shall utilize Inspection
SAES-A-113
A2 Department's list of Saudi Aramco approved Third Party laboratories with
Sec. 5.2.1.2
specific approval in geotechnical category.

he Geotechnical Contractor shall furnish all labor, equipment, tools,


supervision, supplies and transportation required to perform the
SAES A-113
A3 geotechnical investigation, exploration, testing, analyses and reporting in
Sec. 6.1.1
accordance with ASTM D420 and SAES A113 including requirements in
Appendix A.

UTM coordinates and Mean Sea Level (MSL) elevations must be


provided for all field tests. MSL elevations and UTM coordinates must be
SAES-A-113
A4 shown on the field test log. If local coordinates and elevations are
Sec. 6.3.2
available, a table shall be included in the report showing both local and
UTM/MSL data for each boring location.

The Geotechnical Contractor shall comply with all aspects of the Saudi
SAES-A-113
A5 Aramco Construction Safety Manual and all safety programs and policies
Sec. 6.1.2
of Saudi Aramco.
Attachment IV to
A6 All equipments/gauges shall have valid Calibration Certificates. Schedule Q
Section 7.3

B Electronic Piezocone Penetration Testing

The location and depth of cone penetration soundings shall be as SAES-A-113


B1
specified in the geotechnical investigation Scope of Work. Sec. 6.4.2.1

Cone penetration testing shall include pore pressure measurements (i.e


SAES-A-113
B2 piezocone). Where stiff/dense soils are encountered, the piezocone shall
Sec. 6.4.2.3
be replaced with a higher capacity electronic cone.

For all cone penetration calibration, testing and data reporting, ASTM SAES-A-113
B3
D5778 shall be followed. Sec. 6.4.2.3

C Pressuremeter Testing

The location and depth of pressure meter drilling/driving shall be as Method


C1
specified in the geotechnical investigation Scope of Work. Statement

Method
Pressuremeter Tests shall be performed as per approved project
C2 Statement /
specifications, Method Statement and ASTM-D-4719.
ASTM-D-4719
Method
For all pressure meter, testing and data reporting, ASTM-D-4719 shall
C3 Statement /
be followed.
ASTM-D-4719

Page 1 of 1
ATTACHMENT# 2 : JOB SAFETY ANALYSIS
Attachment #3 Part of GEO Technical Investigation Report - Differential Settlement of Tank
GEOTECHNICAL INVESTIGATION
FOR
JAZAN RFEFINERY AND TERMINAL
PROJECT ( EPC – 2 )
KINGDOM OF SAUDI ARABIA
-----------------------------------------------------------------------
( GEOTECHNICAL FILE NO : 2013/22 )
--------------------------------------------------------------------------

PREPARED FOR:

M/S HYUNDAI ARABIA CO. LTD.


AL KHOBAR - 31952
SAUDI ARABIA

PREPARED BY:

AYED EID AL OSAIMI ENGINEERING CONSULTING OFFICE


P.O. BOX 1736
AL-KHOBAR 31952
SAUDI ARABIA

april MAY 2014


Attachment #4 J95-A-DOC-VE-558297 - DESIGN NOTE - JAZAN REFINERY SITE COORDINATES

SAUDI ARABIAN OIL COMPANY

OPRNS

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
CERT
ENG’G

JM

DESIGN NOTE
Project Proposal
DESCRIPTION
JO/EWO

JAZAN REFINERY SITE COORDINATES


DATE

7 Jun
REV NO.

D1

DISCIPLINE
ENGINEER
_______________

DATE _________

PROJECT
ENGINEER
_______________

DATE _________

CERTIFIED

_______________

DATE _________

CONSTRUCTION
AGENCY
_______________ JAZAN REFINERY AND MARINE TERMINAL
DATE _________
SAUDI ARABIA
OPERATIONS

_______________

DATE _________
EDSD VERIFICATION

------------------------------
CONTROL NUMBER

DATE: __________
BY: ____________
THIS INDICATES THAT REV. NO. ______

FOR ALL APPROVAL / CERTIFICATION


OF THIS DOCUMENT IS COVERED,
REVISION CERTIFICATION

REQUIREMENTS, BY DOCUMENT
COMPLETION CERTIFICATE
(DCC) NO. ___________

DESIGN NOTE DWG. TYPE PLANT INDEX DOC. SHT. REV.

Pump motors to be good for Zone 1 DOC


J95 A VE-558297 1
Refinery and Marine Terminal of D1
3
JAZAN SAUDI ARABIA
SAUDI ARABIAN OIL COMPANY

OPRNS

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
1. INTRODUCTION
This Design Note specifies the changes in the design that the
CERT

CONTRACTOR shall incorporate in his proposal; based on the changes


to the Site Coordinates, referenced in the PROJECT DESIGN DATA
ENG’G

(PDD) J95-A-DOC-VE-514855.
JM

2. CURRENT DESIGN
Project Proposal
DESCRIPTION

The global coordinates system used for the Jazan Refinery and Marine
Terminal Project has been AIN AL-ABD 1970 / UTM / Zone 38N; per the
JEC Masterplan, PAB/JEC/LP04(R19), and identified on attachment 1 as
the DBSP (Design Basis Scoping Paper) co-ordinates.
JO/EWO

As a result the following modification needs to be made to the PDD and all
coordinate references in site plans, plot plans etc.
DATE

7 Jun

CONTRACTOR shall review and incorporate change within detailed


design.
REV NO.

D1

3. CHANGES
DISCIPLINE
ENGINEER The latest revision of PDD was issued in February 2012, and since then a
_______________
change of the Site Coordinates system to JEC Amanah WGS 84 / UTM /
DATE _________
Zone 38N has been agreed; per the JEC Masterplan,
PROJECT PAB/JEC/LP04(R21), and identified on attachment 1 as SSD JEC
ENGINEER
_______________ Amanah WGS-84 co-ordinates..
DATE _________
Further site surveys have since been completed to confirm reference
CERTIFIED points for the Jazan Refinery Boundary Corners.
_______________
CONTRACTOR shall review and incorporate revised coordinates
DATE _________
indicated in attachment 1 during detailed design.
CONSTRUCTION
AGENCY
_______________

DATE _________

OPERATIONS

_______________

DATE _________
EDSD VERIFICATION

------------------------------
CONTROL NUMBER

DATE: __________
BY: ____________
THIS INDICATES THAT REV. NO. ______

FOR ALL APPROVAL / CERTIFICATION


OF THIS DOCUMENT IS COVERED,
REVISION CERTIFICATION

REQUIREMENTS, BY DOCUMENT
COMPLETION CERTIFICATE
(DCC) NO. ___________

DESIGN NOTE DWG. TYPE PLANT INDEX DOC. SHT. REV.

Pump motors to be good for Zone 1 DOC


J95 A VE-558297 2
Refinery and Marine Terminal of D1
3
JAZAN SAUDI ARABIA
REVISION CERTIFICATION EDSD VERIFICATION REV NO. DATE JO/EWO DESCRIPTION ENG’G CERT PMT OPRNS
THIS INDICATES THAT REV. NO. ______
OF THIS DOCUMENT IS COVERED, D1 7 Jun Project Proposal JM
------------------------------
FOR ALL APPROVAL / CERTIFICATION
CONTROL NUMBER
REQUIREMENTS, BY DOCUMENT

AGENCY
PROJECT
BY: ____________

ENGINEER
ENGINEER

CERTIFIED
DISCIPLINE
COMPLETION CERTIFICATE

OPERATIONS

DATE _________
DATE _________
DATE _________
DATE _________
DATE _________

CONSTRUCTION

_______________
_______________
_______________
_______________
_______________
(DCC) NO. ___________
DATE: __________

JAZAN
DESIGN NOTE

Refinery and Marine Terminal


Pump motors to be good for Zone 1
1. ATTACHMENTS

DOC

SAUDI ARABIA
DWG. TYPE

J95
PLANT

A
INDEX
SAUDI ARABIAN OIL COMPANY

DOC.
1) Revised Jazan Refinery Boundary Coordinates

VE-558297
3
3
of
SHT.

D1
REV.
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
J95-A-DOC-VE-558297
Attachment 1: Revised Jazan Refinery Coordinates
Attachment #04 Borehole Data

GEOTECHNICAL INVESTIGATION PLAN


BOREHOLES and BOREHOLE TESTS
BOREHOLES LOCATION PLAN COORDINATES BOREHOLE CROSS HOLE PRESSURE METER PERMEABILITY
NO LOCATION
N E DEPTH(m) TEST TEST TEST
EXISTING BH-20 1913450.696 220910.950 50m N/A N/A N/A
EXISTING BH-21 1913279.591 220906.790 20m N/A N/A N/A
EXISTING BH-58 1913297.827 220797.154 20m N/A N/A N/A
EXISTING BH-59 1913531.150 220588.337 20m N/A N/A N/A

16.600 16.600 EXISTING BH-105 1913456.501 220764.869 20m N/A N/A N/A

11.050
43.500 43.500 EXISTING ER-07 1913410.694 220557.240 20m N/A N/A N/A
EXISTING TP-2 1913490.652 220707.477 20m N/A N/A N/A
EXISTING PCT-10 1913251.602 220963.327 20m N/A N/A N/A
33.050
6.200 1 NBH-1 1913271.028 220578.377 20m
2 NBH-2 1913271.935 220621.377 20m
3 NBH-3 1913271.935 220635.377 20m

4 NBH-4 1913271.935 220649.375 20m

5 NBH-5 1913332.235 220591.577 40m

6 NBH-6 1913345.910 220639.377 20m

7 NBH-7 1913399.835 220611.377 40m


8 NBH-8 1913394.835 220647.377 40m O O
5.600
9 NBH-9 1913432.935 220602.377 40m
34.700 10 NBH-10 1913473.535 220580.377 20m

11 NBH-11 1913497.035 220628.377 40m

12 NBH-12 1913324.035 220739.877 20m

13 NBH-13 1913271.028 220811.797 40m


18.500

14 NBH-14 1913323.035 220829.827 20m

15 NBH-15 1913407.962 220724.181 20m

6.200 16 NBH-16 1913364.535 220811.377 40m


15.720
17 NBH-17 1913424.035 220808.603 20m

18 NBH-18 1913526.043 220728.624 60m


23.400
19 NBH-19 1913493.787 220747.241 60m
60m

9.650
20 NBH-20 1913493.787 220710.006
16.700
6.600 21 NBH-21 1913504.556 220728.677 90m O
60m

6.600
22 NBH-22
62.300

1913526.011 220808.677
23 NBH-23 1913493.755 220827.294 60m

24 NBH-24 1913493.755 220790.060 60m

25 NBH-25 1913504.515 220808.677 90m O


10.000 10.000 10.000
26 NBH-26 1913289.435 220944.502 40m

27 NBH-27 1913316.535 220903.377 40m

28 NBH-28 1913340.535 220943.927 40m O


29 NBH-29 1913394.535 220903.377 40m

30 NBH-30 1913427.535 220920.846 20m

31 NBH-31 1913524.085 220898.227 40m O O


32 NBH-32 1913524.085 220943.527 40m

THERMAL & ELECTRICAL RESISTIVITY


COORDINATES
NO LOCATION
NOTE N E
1 SRT-1 1913329.785 220699.427
2 SRT-2
1. IN ALL BOREHOLES, STANDARD PENETRATION TESTS ARE TO BE PERFORMED IN ACCORDANCE WITH ASTM D 1586. 3 SRT-3
1913391.050 220695.790
1913271.935 220635.377

IF THE SOIL IS COHESIVE, UNDISTURBED THIN WALL SAMPLES SHALL BE OBTAINED IN ACCORDANCE WITH ASTM D 1587. 4 SRT-4 1913504.556 220728.677
5 SRT-5 1913524.085 220943.527
2. IN ALL BOREHOLES, GROUNDWATER MEASUREMENTS SHALL BE MADE AFTER STABILIZATION OF THE WATER TABLE.
3. ALL BOREHOLES SHALL BE SEALED WITH SAND-CEMENT MORTAR AT THE END OF THE GROUNDWATER MEASUREMENTS.
4. ALL COORDINATES SHOWN ON THIS DRAWING ARE SSD JEC AMANAH WGS84 COORDINATES.
LEGEND
SURVEYOR SHALL FULLY UNDERSTAND COMPANY'S REQUIREMENT BY DESIGN NOTE.
EXISTING BORING HOLE (BH) : 5EA, TEST : 3EA
DESIGN NOTE FOR COORDINATE SYSTEM IS ISSUED TO SUBCONTRACTOR BY OTHER TRANSMITTAL. BORING HOLE (NBH) - Depth 20m

BORING HOLE (NBH) - Depth 40m


SITE, BOREHOLES & OTHER TESTS LOCATION PLAN BORING HOLE (NBH) - Depth 60m

BORING HOLE (NBH) - Depth 90m

Geotechnical Investigation for JAZAN REFINERY & TERMINAL PROJECT (EPC # 2) Figure No. 2 SOIL THERMAL & ELECTRICAL RESISTIVITY TEST (SRT)
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,265.36 meter TYPE OF BORING: ROTARY WASH
EAST: 220,646.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 01
GROUND ELEVATION: 11.92 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-12-13
DEPTH OF GROUNDWATER TABLE: 9.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 3-12-13
MEASURED AT: 0800 HOURS ON: 5-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 25 Medium dense, brown, silty sand. 0.3


2 0.6
3 Ditto. 0.9
SPT - 2 21 14.1 43
4 SM 1.2
5 1.5
6 SPT - 3 24 Ditto. 1.8
7 2.1
8 Stiff, brown, sandy silt. 2.4
SPT - 4 14 17.7 58
9 ML 2.7
10 3.0
11 SPT - 5 17 Ditto but very stiff. 3.4
12 3.7
13
SPT - 6 13 Medium dense, brown, clayey sand. 4.0
14 4.3
15 4.6
SPT - 7 16 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 19 12.5 20 Medium dense, yellowish brown, silty sand.
21 6.4
22 6.7
SM
23 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto but very dense, brown.
26 7.9
27 8.2
28 8.5
29 8.8
30 Ditto but dense with occasional gravel. 9.1
SPT - 10 44
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-1
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,265.36 meter TYPE OF BORING: ROTARY WASH
EAST: 220,646.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 01
GROUND ELEVATION: 11.92 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-12-13
DEPTH OF GROUNDWATER TABLE: 9.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 3-12-13
MEASURED AT: 0800 HOURS ON: 5-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 31 Dense, brown, silty clayey sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 23 19.5 48 Ditto but medium dense. 12.2
41 12.5
42 SC-SM 12.8
43 13.1
44 13.4
45
SPT - 13 28 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 45 Dense, brown, poorly graded sand with silt. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 28 16.0 09 Ditto but medium dense. 16.8
56 17.1
57 SP-SM 17.4
58 17.7
59 18.0
60 SPT - 16 28 Very stiff, brown, fine sandy silt. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 49 Dense, brown, silty sand. 19.8
66 20.1
SPT - 18 >50 Ditto but very dense.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-1
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,266.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,689.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 02
GROUND ELEVATION: 10.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-12-13
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 6-12-13
MEASURED AT: 0700 HOURS ON: 9-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 33 Dense, brown, silty sand. 0.3


2 0.6
3 Ditto but medium dense. 0.9
SPT - 2 11 14.3 32
4 SM 1.2
5 1.5
6 SPT - 3 14 Medium dense, brown, silty sand with traces of clay. 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 11
9 2.7
10 3.0
11 SPT - 5 13 13.2 36 Ditto. 3.4
SM
12 3.7
13
SPT - 6 21 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 14 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 19 14.2 13 Ditto but absence of clay.
21 6.4
22 6.7
SM
23 7.0
24 7.3
25 7.6
U-1 Brown, lean clay with sand.
26 7.9
27 8.2
28 8.5
29 8.8
30 Ditto but hard. 9.1
SPT - 9 50
31 9.4
32 U-2 10.6 84 Ditto. 9.8
33 CL 10.1
34 10.4
35 CL-ML 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-2
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,266.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,689.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 02
GROUND ELEVATION: 10.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-12-13
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 6-12-13
MEASURED AT: 0700 HOURS ON: 9-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 31 22.0 50 Very stiff, brown, sandy silty clay.
36 11.0
37 11.3
CL-ML
38 11.6
39 11.9
40
SPT - 11 20 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 12 30 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 13 32 Dense, brown., poorly grade sand with silt. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 14 32 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 15 38 17.8 12 Ditto. 18.3
61 18.6
62 SP-SM 18.9
63 19.2
64 19.5
65 SPT - 16 >50 Ditto but very dense. 19.8
66 20.1
SPT - 17 >50 Very dense, brown, clayey sand with frequent cementation.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-2
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,266.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,703.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 03
GROUND ELEVATION: 11.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 7-12-13
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 7-12-13
MEASURED AT: 0715 HOURS ON: 9-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 13 Medium dense, brown, silty sand. 0.3


2 0.6
3 Ditto. 0.9
SPT - 2 13 4.8 31
4 SM 1.2
5 1.5
6 SPT - 3 16 Ditto. 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 17
9 2.7
10 3.0
11 SPT - 5 16 Medium dense, brown, silty sand with traces of clay. 3.4
12 3.7
13
SPT - 6 15 15.3 31 Ditto. 4.0
14 SM 4.3
15 4.6
SPT - 7 13 Ditto but absence of clay.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 21 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 41 Ditto but dense.
26 7.9
27 8.2
28 8.5
29 8.8
30 Ditto but with traces of clay. 9.1
SPT - 10 41
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-3
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,266.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,703.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 03
GROUND ELEVATION: 11.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 7-12-13
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 7-12-13
MEASURED AT: 0715 HOURS ON: 9-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 39 Dense, brown, silty sand with traces of clay.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 20 19.9 66 Very stiff, brown, sandy lean clay with gravel. 12.2
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
SPT - 13 31 Dense, brown, silty sand. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 31 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 35 20.8 14 Ditto. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 45 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
SPT - 18 >50 Ditto but greyish brown & gravelly.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-3
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,266.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,717.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 04
GROUND ELEVATION: 11.08 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-12-13
DEPTH OF GROUNDWATER TABLE: 8.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 8-12-13
MEASURED AT: 0700 HOURS ON: 10-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 11 4.3 33 Medium dense, brown, silty sand. 0.3


SM
2 0.6
3 Ditto but loose. 0.9
SPT - 2 08
4 1.2
5 1.5
6 SPT - 3 08 14.0 37 Ditto. 1.8
SM
7 2.1
8 Ditto but medium dense. 2.4
SPT - 4 19
9 2.7
10 3.0
11 SPT - 5 19 Ditto. 3.4
12 3.7
13
SPT - 6 11 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 12 12.5 14 Ditto.
16 4.9
17 5.2
SM
18 5.5
19 5.8
20 6.1
SPT - 8 42 Ditto but dense, grey.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto but very dense, brown.
26 7.9
27 8.2
28 8.5
29 8.8
30 Medium dense, brown, clayey sand with frequent 9.1
SPT - 10 23
31 indurations. 9.4
32 9.8
33 10.1
34 10.4
35 CL 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,266.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,717.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 04
GROUND ELEVATION: 11.08 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-12-13
DEPTH OF GROUNDWATER TABLE: 8.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 8-12-13
MEASURED AT: 0700 HOURS ON: 10-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 23 27.5 73 Very stiff, brown, lean clay with sand.
36 11.0
37 11.3
CL
38 11.6
39 11.9
40
SPT - 12 22 Medium dense, brown, silty sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 36 Ditto but dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 29 23.8 19 Ditto but medium dense. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 >50 Ditto but very dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 39 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 39 Ditto but with occasional gravel. 19.8
66 20.1
SPT - 18 46 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,326.57 meter TYPE OF BORING: ROTARY WASH
EAST: 220,659.76 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 05
GROUND ELEVATION: 11.80 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-12-13
MEASURED AT: 0600 HOURS ON: 7-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 12 Medium dense, dark brown, silty sand. 0.3


2 0.6
3 Medium dense, dark grey, silty clayey sand. 0.9
SPT - 2 12
4 1.2
5 1.5
6 SPT - 3 13 22.8 37 Ditto btu brown. 1.8
SC-SM
7 2.1
8 Ditto. 2.4
SPT - 4 13
9 2.7
10 3.0
11 SPT - 5 13 18.0 44 Medium dense, brown, silty sand. 3.4
SM
12 3.7
13
SPT - 6 20 Ditto but dark brown. 4.0
14 4.3
15 4.6
SPT - 7 22 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 16 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto but very dense, brown.
26 7.9
27 8.2
28 8.5
29 8.8
30 Very dense, dark grey to black, gravel size rock fragments. 9.1
SPT - 10 >50
31 9.4
32 9.8
33 10.1
34 10.4
35 SC-SM 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,326.57 meter TYPE OF BORING: ROTARY WASH
EAST: 220,659.76 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 05
GROUND ELEVATION: 11.80 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-12-13
MEASURED AT: 0600 HOURS ON: 7-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 39 19.5 44 Dense, dark grey, silty clayey sand.
36 11.0
37 11.3
SC-SM
38 11.6
39 11.9
40
SPT - 12 24 Ditto but medium dense. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 27 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 25 Medium dense, brown, silty sand. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 38 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 31 15.8 19 Ditto. 18.3
61 18.6
62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 47 Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,326.57 meter TYPE OF BORING: ROTARY WASH
EAST: 220,659.76 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 05
GROUND ELEVATION: 11.80 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-12-13
MEASURED AT: 0600 HOURS ON: 7-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, brown, silty sand with traces of clay. 21.6


72 21.9
73 22.3
74 22.6
SPT - 19 >50 Ditto but dark brown.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 36 22.6 54 Hard, dark grey, sandy lean clay with occasional gravel.
80 24.4
81 24.7
CL
82 25.0
83 25.3
84 25.6
SPT - 21 43 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Very dense, dark brown, silty sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50
100 30.5
101 30.8
102 31.1
103 31.4
104 SPT - 25 >50 15.7 21 Ditto. 31.7
SM
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,326.57 meter TYPE OF BORING: ROTARY WASH
EAST: 220,659.76 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 05
GROUND ELEVATION: 11.80 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-12-13
MEASURED AT: 0600 HOURS ON: 7-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, dark brown, silty sand with occasional gravel. 32.3
107 SM 32.6
108 32.9
109
SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 20.9 43 Very dense, grey, clayey sand with occasional gravel. 34.7
115 35.1
116 SC 35.4
117 35.7
118 36.0
119 SPT - 28 38 Ditto but dense. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 Ditto but very dense. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 21.1 29 Very dense, dark brown, silty sand. 39.3
130 SM 39.6
131 39.9
132
SPT - 31 >50 Ditto but with clay. 40.2
133 40.5
END OF BORING @ 40.45 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,340.24 meter TYPE OF BORING: ROTARY WASH
EAST: 220,707.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 06
GROUND ELEVATION: 10.82 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 9-12-13
MEASURED AT: 0600 HOURS ON: 11-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 09 Stiff, brown, sandy silt. 0.3


2 0.6
3 Ditto. 0.9
SPT - 2 15
4 1.2
5 1.5
6 SPT - 3 07 15.7 50 Ditto but medium stiff. 1.8
ML
7 2.1
8 Ditto but very stiff. 2.4
SPT - 4 24
9 2.7
10 3.0
11 SPT - 5 20 Ditto. 3.4
12 3.7
13
SPT - 6 16 Ditto but stiff. 4.0
14 4.3
15 4.6
SPT - 7 15 9.5 16 Medium dense, brown, silty sand.
16 4.9
17 5.2
SM
18 5.5
19 5.8
20 6.1
SPT - 8 34 Ditto but dense.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 38 Dense, yellowish brown, silty clayey sand.
26 7.9
27 8.2
28 8.5
29 8.8
30 Ditto. 9.1
SPT - 10 36
31 9.4
32 9.8
33 10.1
34 10.4
35 SC-SM 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-6
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,340.24 meter TYPE OF BORING: ROTARY WASH
EAST: 220,707.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 06
GROUND ELEVATION: 10.82 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 9-12-13
MEASURED AT: 0600 HOURS ON: 11-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 15 23.3 48 SC-SM Medium dense, brown, silty clayey sand with occasional
36 11.0
gravel.
37 U-1 11.2 64 11.3
Brown, sandy lean clay with occasional gravel.
38 CL 11.6
39 11.9
40
SPT - 12 22 Medium dense, brown, poorly graded sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 35 Ditto but dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 30 Ditto but medium dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 29 20.8 44 Medium dense, brown, silty clayey sand. 16.8
56 17.1
57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 50 Dense, brown, silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 50 Dense, brown, poorly graded sand. 19.8
66 20.1
SPT - 18 46 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-6
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,394.17 meter TYPE OF BORING: ROTARY WASH
EAST: 220,679.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 07
GROUND ELEVATION: 10.86 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0600 HOURS ON: 24-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 23 Very stiff, brown, sandy clayey silt. 0.3


2 0.6
3 Dense, brown, silty sand. 0.9
SPT - 2 44
4 1.2
5 1.5
6 SPT - 3 16 13.4 47 Ditto but medium dense. 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 21
9 2.7
10 3.0
11 SPT - 5 24 Ditto. 3.4
12 3.7
13
SPT - 6 16 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 18 14.9 24 Ditto.
16 4.9
17 5.2
SM
18 5.5
19 5.8
20 6.1
SPT - 8 >50 Ditto but very dense, greyish brown.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 16.0 13 Ditto but brown.
26 7.9
27 8.2
SM
28 8.5
29 8.8
30 Ditto but dense. 9.1
SPT - 10 40
31 9.4
32 9.8
33 10.1
34 10.4
35 CL 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,394.17 meter TYPE OF BORING: ROTARY WASH
EAST: 220,679.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 07
GROUND ELEVATION: 10.86 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0600 HOURS ON: 24-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 24 25.2 79 CL Very stiff, brown, lean clay with sand.
36 11.0
37 U-1 14.2 54 Brown, sandy silty clay. 11.3
38 CL-ML 11.6
39 11.9
40
SPT - 12 10 25.2 60 Stiff, brown, sandy lean clay with occasional gravel. 12.2
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
SPT - 13 32 Ditto but very stiff. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 34 Dense, brown, silty sand. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 17 Ditto but medium dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 20 17.2 13 Ditto. 18.3
61 18.6
62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,394.17 meter TYPE OF BORING: ROTARY WASH
EAST: 220,679.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 07
GROUND ELEVATION: 10.86 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0600 HOURS ON: 24-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty sand. 21.6


72 21.9
73 22.3
74 22.6
SPT - 19 >50 20.8 49 Very dense, brown, silty clayey sand with gravel.
75 22.9
76 23.2
SC-SM
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 >50 Very dense, brown, silty sand.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 SPT - 24 >50 16.6 27 Ditto but with traces of clay. 30.2
100 30.5
101 SM 30.8
102 31.1
103 31.4
104 SPT - 25 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,394.17 meter TYPE OF BORING: ROTARY WASH
EAST: 220,679.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 07
GROUND ELEVATION: 10.86 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0600 HOURS ON: 24-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, brown, silty sand with traces of clay. 32.3
107 32.6
108 32.9
109 SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 20.6 25 Ditto. 34.7
115 35.1
116 SM 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Hard, brown, lean clay with sand. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 30.2 77 Ditto. 37.8
125 38.1
126 CL 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto but with occasional cementation. 39.3
130 39.6
131 39.9
132 SPT - 31 >50 Very dense, brown, silty sand. 40.2
133 40.5
END OF BORING @ 40.42 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,389.17 meter TYPE OF BORING: ROTARY WASH
EAST: 220,715.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 08
GROUND ELEVATION: 10.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0700 HOURS ON: 24-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 15 Medium dense, brown, silty sand. 0.3


2 0.6
3 Ditto but grey. 0.9
SPT - 2 21
4 1.2
5 1.5
6 SPT - 3 11 15.5 49 Medium dense, dark grey, silty clayey sand. 1.8
SC-SM
7 2.1
8 Ditto. 2.4
SPT - 4 15
9 2.7
10 3.0
11 SPT - 5 12 Ditto. 3.4
12 3.7
13
SPT - 6 17 10.0 28 Medium dense, dark grey, silty sand. 4.0
14 SM 4.3
15 4.6
SPT - 7 23 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 >50 Very dense, grey, well graded sand with silt.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 14.5 10 Ditto.
26 7.9
27 8.2
SW-SM
28 8.5
29 8.8
30 Ditto but medium dense, dark grey. 9.1
SPT - 10 26
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-8
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,389.17 meter TYPE OF BORING: ROTARY WASH
EAST: 220,715.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 08
GROUND ELEVATION: 10.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0700 HOURS ON: 24-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 29 Meidum dense, dark grey, well graded sand with silt.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 22 25.0 82 Very stiff, dark grey, lean clay with sand. 12.2
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
SPT - 13 28 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 35 Dense, grey, poorly graded sand with silt. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 48 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 12.8 11 Ditto but very dense with occasional gravel. 18.3
61 18.6
62 SP-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Very dense, grey, silty sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-8
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,389.17 meter TYPE OF BORING: ROTARY WASH
EAST: 220,715.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 08
GROUND ELEVATION: 10.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0700 HOURS ON: 24-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, grey, silty sand. 21.6


72 21.9
73 22.3
74 22.6
SPT - 19 46 Ditto but dense.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto but very dense.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 >50 18.0 14 Ditto but brown.
85 25.9
86 26.2
SM
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto but grey. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto but with occasional gravel. 30.2
SPT - 24 >50 16.8 24
100 30.5
101 SM 30.8
102 31.1
103 31.4
104 SPT - 25 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-8
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,389.17 meter TYPE OF BORING: ROTARY WASH
EAST: 220,715.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 08
GROUND ELEVATION: 10.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0700 HOURS ON: 24-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, grey, silty sand with occasional gravel. 32.3
107 32.6
108 32.9
109
SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 Ditto. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Ditto. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 Ditto but dark brown. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 17.1 20 Ditto. 39.3
130 SM 39.6
131 39.9
132
SPT - 31 >50 Ditto. 40.2
133 40.5
END OF BORING @ 40.45 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-8
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,427.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,670.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 09
GROUND ELEVATION: 12.41 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 9.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 19-12-13
MEASURED AT: 0710 HOURS ON: 21-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 15 Medium dense, brown, silty clayey sand. 0.3


2 0.6
3 Ditto. 0.9
SPT - 2 21
4 1.2
5 1.5
6 SPT - 3 15 13.2 46 Ditto. 1.8
SC-SM
7 2.1
8 Medium dense, brown, silty sand. 2.4
SPT - 4 19
9 2.7
10 3.0
11 SPT - 5 16 Ditto. 3.4
12 3.7
13
SPT - 6 13 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 14 15.1 15 Ditto.
16 4.9
17 5.2
SM
18 5.5
19 5.8
20 6.1
SPT - 8 15 Medium dense, brown, clayey sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 30 Medium dense, brown, silty sand.
26 7.9
27 8.2
28 8.5
29 8.8
30 Ditto but dense. 9.1
SPT - 10 34
31 9.4
32 9.8
33 10.1
34 10.4
35 SM 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-9
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,427.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,670.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 09
GROUND ELEVATION: 12.41 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 9.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 19-12-13
MEASURED AT: 0710 HOURS ON: 21-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 34 18.5 24 SM Dense, brown, silty sand.
36 11.0
37 U-1 16.9 78 Brown, lean clay with sand. 11.3
38 CL 11.6
39 11.9
40
SPT - 12 26 Medium dense, brown, silty sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 35 18.6 23 Ditto but dense. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 30 16.9 36 Ditto but medium dense with traces of clay. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 36 Hard, brown, clayey silt. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 38 Dense, brown, poorly graded sand with silt. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 44 17.3 12 Ditto. 19.8
66 20.1
67 SP-SM 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto but very dense. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-9
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,427.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,670.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 09
GROUND ELEVATION: 12.41 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 9.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 19-12-13
MEASURED AT: 0710 HOURS ON: 21-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, poorly graded sand with silt. 21.6


72 21.9
73 22.3
74 22.6
SPT - 19 >50 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Hard, brown, clayey silt.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 45 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Very dense, brown, silty sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto but with clay. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto but absence of clay. 30.2
SPT - 24 >50 19.6 13
100 30.5
101 SM 30.8
102 31.1
103 31.4
104
SPT - 25 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-9
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,427.27 meter TYPE OF BORING: ROTARY WASH
EAST: 220,670.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 09
GROUND ELEVATION: 12.41 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 9.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 19-12-13
MEASURED AT: 0710 HOURS ON: 21-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, brown, silty sand with clay. 32.3


107 32.6
108 32.9
109
SPT - 26 >50 Very dense, brown, poorly graded gravel. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 1.2 03 Ditto but grey. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Hard, brown, lean clay with sand. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 36.2 72 Ditto. 37.8
125 38.1
126 CL 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto. 39.3
130 39.6
131 39.9
132 SPT - 31 >50 Very dense, brown, silty sand. 40.2
133 END OF BORING @ 40.29 m. 40.5
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-9
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,467.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,648.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 10
GROUND ELEVATION: 12.59 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 9.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 18-12-13
MEASURED AT: 0700 HOURS ON: 20-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 12 Medium dense, brown, silty clayey sand. 0.3


2 0.6
3 Ditto but dark grey. 0.9
SPT - 2 22 14.1 45
4 SC-SM 1.2
5 1.5
6 SPT - 3 19 Ditto. 1.8
7 2.1
8 Stiff, dark grey, sandy silt. 2.4
SPT - 4 10 13.8 56
9 ML 2.7
10 3.0
11 SPT - 5 16 Ditto. 3.4
12 3.7
13
SPT - 6 17 Medium dense, brown, poorly graded sand with silt. 4.0
14 4.3
15 4.6
SPT - 7 23 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 20 Ditto but light brown.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 36 14.1 12 Ditto but dense.
26 7.9
27 8.2
SP-SM
28 8.5
29 8.8
30 Ditto but brown. 9.1
SPT - 10 33
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-10
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,467.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,648.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 10
GROUND ELEVATION: 12.59 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 9.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 18-12-13
MEASURED AT: 0700 HOURS ON: 20-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 33 Dense, brown, silty sand with traces of clay.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 39 Ditto but absence of clay. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 37 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 31 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 42 19.0 25 Ditto but dark brown. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 34 Ditto but brown. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 47 Ditto but grey. 19.8
66 20.1
SPT - 18 47 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-10
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,491.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,696.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 11
GROUND ELEVATION: 11.42 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0800 HOURS ON: 23-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 11 Medium dense, light brown, silty sand. 0.3


2 0.6
3 Ditto. 0.9
SPT - 2 15
4 1.2
5 1.5
6 SPT - 3 10 19.8 79 Stiff, dark brown, silty clay with sand. 1.8
CL-ML
7 2.1
8 Medium dense, light grey, silty sand. 2.4
SPT - 4 12
9 2.7
10 3.0
11 SPT - 5 12 Ditto. 3.4
12 3.7
13
SPT - 6 13 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 10 16.3 55 Stiff, light grey, sandy silt.
16 4.9
17 5.2
ML
18 5.5
19 5.8
20 6.1
SPT - 8 29 Ditto but very stiff.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 29 13.7 16 Medium dense, light brown, silty sand.
26 7.9
27 8.2
SM
28 8.5
29 8.8
30 Ditto. 9.1
SPT - 10 21
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-11
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,491.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,696.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 11
GROUND ELEVATION: 11.42 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0800 HOURS ON: 23-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 15 Medium dense, grey, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 24 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 19 Medium dense, brown, silty clayey sand. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 24 20.5 25 Ditto. 15.2
51 15.5
52 SC-SM 15.8
53 16.2
54 16.5
55 SPT - 15 32 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 46 Dense, grey, silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 44 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 41 Ditto but brown. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-11
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,491.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,696.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 11
GROUND ELEVATION: 11.42 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0800 HOURS ON: 23-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, brown, silty sand. 21.6


72 21.9
73 22.3
74 22.6
SPT - 19 37 24.7 55 Hard, dark grey, sandy lean clay with gravel.
75 22.9
76 23.2
CL
77 23.5
78 23.8
79 24.1
SPT - 20 39 22.2 42 Dense, dark brown, silty clayey sand.
80 24.4
81 24.7
SC-SM
82 25.0
83 25.3
84 25.6
SPT - 21 43 Dense, brown, silty sand.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 44 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto but very dense, dark brown. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50 20.0 31
100 30.5
101 SM 30.8
102 31.1
103 31.4
104
SPT - 25 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-11
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,491.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,696.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 11
GROUND ELEVATION: 11.42 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-12-13
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 22-12-13
MEASURED AT: 0800 HOURS ON: 23-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, dark brown, silty sand. 32.3


107 32.6
108 32.9
109
SPT - 26 45 27.1 58 Hard, dark grey, sandy lean clay with occasional gravel. 33.2
110 33.5
111 CL 33.8
112 34.1
113 34.4
114 SPT - 27 >50 Ditto but grey. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Ditto. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 29.3 67 Hard, grey, sandy lean clay. 37.8
125 38.1
126 CL 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto. 39.3
130 39.6
131 39.9
132
SPT - 31 >50 Ditto. 40.2
133 40.5
END OF BORING @ 40.44 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-11
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,318.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,808.06 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 12
GROUND ELEVATION: 10.80 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-12-13
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 9-12-13
MEASURED AT: 0815 HOURS ON: 11-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 18 Very stiff, brown, fine sandy silt. 0.3


2 0.6
3 Medium dense, brown, silty clayey sand. 0.9
SPT - 2 20
4 1.2
5 1.5
6 SPT - 3 20 19.1 45 Ditto. 1.8
SC-SM
7 2.1
8 Ditto. 2.4
SPT - 4 25
9 2.7
10 3.0
11 SPT - 5 18 Medium dense, brown, poorly graded sand with silt. 3.4
12 3.7
13
SPT - 6 17 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 43 9.9 09 Ditto but dense.
16 4.9
17 5.2
SP-SM
18 5.5
19 5.8
20 6.1
SPT - 8 32 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 28 Ditto but medium dense.
26 7.9
27 8.2
28 8.5
29 8.8
30 Medium dense, brown, clayey sand. 9.1
SPT - 10 20
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-12
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,318.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,808.06 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 12
GROUND ELEVATION: 10.80 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-12-13
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 9-12-13
MEASURED AT: 0815 HOURS ON: 11-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 24 Medium dense, brown, clayey sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 21 26.3 72 Very stiff, brown, lean clay with sand. 12.2
CL
41 12.5
42 U-1 14.0 36 Brown, silty clayey sand. 12.8
43 SC-SM 13.1
44 13.4
45
SPT - 13 31 Ditto but dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 30 Medium dense, brown, silty sand. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 34 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 27 17.5 23 Ditto but medium dense. 18.3
61 18.6
62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 49 Ditto but dense with clay. 19.8
66 20.1
SPT - 18 >50 Hard, brown, sandy clayey silt with occasional indurations.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-12
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,265.36 meter TYPE OF BORING: ROTARY WASH
EAST: 220,879.98 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 13
GROUND ELEVATION: 11.81 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 8.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 15-12-13
MEASURED AT: 0810 HOURS ON: 16-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 13 Medium dense, light brown, silty sand with traces of clay. 0.3
2 0.6
3 Ditto but dark brown. 0.9
SPT - 2 16 15.2 41
4 SM 1.2
5 1.5
6 SPT - 3 37 Ditto but dense. 1.8
7 2.1
8 Ditto but dark brown. 2.4
SPT - 4 36
9 2.7
10 3.0
11 SPT - 5 19 Ditto but medium dense. 3.4
12 3.7
13
SPT - 6 21 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 13 13.7 43 Medium dense, dark brown, silty sand.
16 4.9
17 5.2
SM
18 5.5
19 5.8
20 6.1
SPT - 8 15 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 48 17.3 41 Dense, greyish brown, silty clayey sand.
26 7.9
SC-SM
27 8.2
28 8.5
29 U-1 10.6 78 Greyish brown, lean clay with sand. 8.8
CL
30 Dense, grey, silty clayey sand. 9.1
SPT - 10 44
31 9.4
32 9.8
33 10.1
34 10.4
35 CL-ML 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,265.36 meter TYPE OF BORING: ROTARY WASH
EAST: 220,879.98 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 13
GROUND ELEVATION: 11.81 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 8.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 15-12-13
MEASURED AT: 0810 HOURS ON: 16-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
U-2 22.4 54 Grey, sandy silty clay.
36 11.0
37 11.3
CL-ML
38 11.6
39 11.9
40
SPT - 11 10 Ditto but stiff. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 12 25 Ditto but very stiff, dark brown. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 13 29 24.3 56 Ditto. 15.2
51 15.5
52 CL-ML 15.8
53 16.2
54 16.5
55 SPT - 14 21 32.8 76 Very stiff, dark grey, lean clay with sand. 16.8
56 17.1
57 CL 17.4
58 17.7
59 18.0
60 SPT - 15 35 Dense, brown, silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 16 48 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 17 46 Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,265.36 meter TYPE OF BORING: ROTARY WASH
EAST: 220,879.98 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 13
GROUND ELEVATION: 11.81 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 8.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 15-12-13
MEASURED AT: 0810 HOURS ON: 16-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, brown, silty sand. 21.6


72 21.9
73 22.3
74 22.6
SPT - 18 >50 15.3 23 Ditto but very dense with gravel.
75 22.9
76 23.2
SM
77 23.5
78 23.8
79 24.1
SPT - 19 43 26.0 68 Hard, dark grey, sandy lean clay.
80 24.4
81 24.7
CL
82 25.0
83 25.3
84 25.6
SPT - 20 49 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 21 50 Dense, grey, silty sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto but very dense, light brown. 28.7
SPT - 22 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto but brown with traces of clay. 30.2
SPT - 23 >50 17.5 31
100 30.5
101 SM 30.8
102 31.1
103 31.4
104
SPT - 24 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,265.36 meter TYPE OF BORING: ROTARY WASH
EAST: 220,879.98 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 13
GROUND ELEVATION: 11.81 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 8.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 15-12-13
MEASURED AT: 0810 HOURS ON: 16-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, brown, silty sand with traces of clay. 32.3
107 32.6
108 32.9
109
SPT - 25 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 26 >50 17.1 36 Ditto. 34.7
115 35.1
116 SM 35.4
117 35.7
118 36.0
119 SPT - 27 40 Dense, brown, clayey sand. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 28 >50 Hard, brown, clayey sandy silt. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 39 >50 21.0 43 Very dense, brown, silty sand with occasional gravel & 39.3
traces of clay.
130 SM 39.6
131 39.9
132 SPT - 30 >50 Hard, brown, sandy clay with occasional cementation. 40.2
133 40.5
END OF BORING @ 40.42 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,317.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,898.01 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 14
GROUND ELEVATION: 11.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 12-12-13
MEASURED AT: 0815 HOURS ON: 14-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 07 Loose, dark brown, silty sand. 0.3


2 0.6
3 Very stiff, brown, sandy silty clay. 0.9
SPT - 2 25
4 1.2
5 1.5
6 SPT - 3 31 Ditto. 1.8
7 2.1
8 Ditto but medium stiff. 2.4
SPT - 4 08 17.2 69
9 CL-ML 2.7
10 3.0
11 SPT - 5 07 Ditto. 3.4
12 3.7
13
SPT - 6 14 Ditto but stiff. 4.0
14 4.3
15 4.6
SPT - 7 19 Ditto but very stiff.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 19 Medium dense, brown, silty clayey sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 39 17.1 29 Ditto but dense, dark grey.
26 7.9
27 8.2
SC-SM
28 8.5
29 8.8
30 Ditto. 9.1
SPT - 10 32
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-14
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,317.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,898.01 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 14
GROUND ELEVATION: 11.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 12-12-13
MEASURED AT: 0815 HOURS ON: 14-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 39 Dense, dark grey, silty clayey sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 23 Ditto but medium dense, brown. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 32 47.9 59 Very stiff, dark grey, sandy lean clay with occasional gravel. 13.7
46 14.0
47 CL 14.3
48 14.6
49 14.9
50 SPT - 14 21 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 24 Ditto but grey. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 29 Medium dense, brown, poorly graded sand with silt. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 47 18.5 12 Ditto but dense. 19.8
SP-SM
66 20.1
SPT - 18 47 Ditto but dark grey.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-14
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,402.29 meter TYPE OF BORING: ROTARY WASH
EAST: 220,792.36 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 15
GROUND ELEVATION: 10.94 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 10-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 10-12-13
MEASURED AT: 0813 HOURS ON: 12-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 10 Loose, light brown, silty sand with traces of clay. 0.3
2 0.6
3 Ditto. 0.9
SPT - 2 10 13.3 33
4 SM 1.2
5 1.5
6 SPT - 3 09 Ditto. 1.8
7 2.1
8 Ditto but dark brown. 2.4
SPT - 4 08
9 2.7
10 3.0
11 SPT - 5 11 16.6 54 Stiff, dark grey, sandy silty clay. 3.4
CL-ML
12 3.7
13
SPT - 6 15 Medium dense, dark grey, silty sand with traces of clay. 4.0
14 4.3
15 4.6
SPT - 7 13 Ditto but light brown.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 42 Ditto but dense, brown.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 44 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 Medium dense, dark grey, clayey sand. 9.1
SPT - 10 29 18.6 32
31 9.4
32 9.8
SC
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-15
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,402.29 meter TYPE OF BORING: ROTARY WASH
EAST: 220,792.36 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 15
GROUND ELEVATION: 10.94 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 10-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 10-12-13
MEASURED AT: 0813 HOURS ON: 12-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 28 Medium dense, brown, clayey sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 18 Ditto but dark grey. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 27 Medium dense, brown, silty sand with traces of clay. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 31 Ditto but light grey. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 33 Hard, dark grey, clayey silt. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 U-1 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
SPT - 16 >50 Ditto.
65 19.8
66 20.1
SPT - 17 >50 Very dense, brown, silty sand.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-15
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,358.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,879.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 16
GROUND ELEVATION: 12.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 9.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-12-13
MEASURED AT: 0820 HOURS ON: 15-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 12 Medium dense, dark brown, silty sand. 0.3


2 0.6
3 Hard, dark brown, sany silt. 0.9
SPT - 2 38
4 1.2
5 1.5
6 SPT - 3 22 18.5 61 Ditto but very stiff. 1.8
ML
7 2.1
8 Ditto. 2.4
SPT - 4 17
9 2.7
10 3.0
11 SPT - 5 22 Very stiff, dark grey, lean clay with sand. 3.4
12 3.7
13
SPT - 6 26 15.1 87 Ditto. 4.0
14 CL 4.3
15 4.6
SPT - 7 33 Dense, dark brown, silty sand.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 36 Ditto but light brown.
21 6.4
22 6.7
23 7.0
24 7.3
25 >50 18.1 15 7.6
SPT - 9 Ditto but very dense, dark brown.
26 7.9
27 8.2
SM
28 8.5
29 8.8
30 Ditto but dense. 9.1
SPT - 10 42
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,358.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,879.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 16
GROUND ELEVATION: 12.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 9.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-12-13
MEASURED AT: 0820 HOURS ON: 15-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 38 Hard, grey, lean clay with sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 47 Ditto. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 20 26.2 71 Ditto but very stiff, grey with occasional gravel. 13.7
46 14.0
47 CL 14.3
48 14.6
49 14.9
50 SPT - 14 26 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 31 19.7 36 Medium dense, brown, silty clayey sand. 16.8
56 17.1
57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 40 Ditto but dense, dark brown. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 46 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 16.2 07 SP-SM Very dense, brown, poorly graded sand with silt. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,358.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,879.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 16
GROUND ELEVATION: 12.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 9.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-12-13
MEASURED AT: 0820 HOURS ON: 15-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, poorly graded sand with silt. 21.6


72 SP-SM 21.9
73 22.3
74 22.6
SPT - 19 >50 Ditto but grey.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 31 Very stiff, dark grey, sandy silt.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 >50 23.2 52 Ditto but hard.
85 25.9
86 26.2
ML
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Very dense, brown, silty clayey sand with occasional gravel. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50 16.1 33
100 30.5
101 SC-SM 30.8
102 31.1
103 31.4
104
SPT - 25 >50 Very dense, brown, silty sand. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,358.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,879.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 16
GROUND ELEVATION: 12.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 9.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-12-13
MEASURED AT: 0820 HOURS ON: 15-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, brown, silty sand. 32.3


107 32.6
108 32.9
109
SPT - 26 >50 15.2 15 Ditto but grey. 33.2
110 33.5
111 SM 33.8
112 34.1
113 34.4
114 SPT - 27 >50 Ditto. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Ditto but brown. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 14.2 20 Ditto. 37.8
125 38.1
126 SM 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Hard, grey, silty clay with sand. 39.3
130 39.6
131 39.9
132 SPT - 31 >50 Ditto. 40.2
133 END OF BORING @ 40.25 m. 40.5
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,418.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.78 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 17
GROUND ELEVATION: 10.85 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 10-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 11-12-13
MEASURED AT: 0700 HOURS ON: 15-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 16 1.9 30 Medium dense, light brown, silty sand. 0.3


SM
2 0.6
3 Stiff, dark brown, silt with sand. 0.9
SPT - 2 13
4 1.2
5 1.5
6 SPT - 3 26 12.4 72 Ditto but very stiff, brown. 1.8
ML
7 2.1
8 Medium dense, dark brown, poorly graded sand with silt. 2.4
SPT - 4 17
9 2.7
10 3.0
11 SPT - 5 15 Ditto. 3.4
12 3.7
13
SPT - 6 12 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 13 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 40 11.5 10 Ditto but dense, dark grey with occaional gravel.
21 6.4
22 6.7
SP-SM
23 7.0
24 7.3
25 7.6
SPT - 9 46 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 Very stiff, grey, sandy silt with occasional indurations. 9.1
SPT - 10 22
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-17
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,418.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.78 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 17
GROUND ELEVATION: 10.85 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 10-12-13
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 11-12-13
MEASURED AT: 0700 HOURS ON: 15-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 25 Very stiff, light brown, sandy silty clay.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 23 Ditto. 12.2
41 12.5
42 U-1 17.4 54 Ditto. 12.8
43 CL-ML 13.1
44 13.4
45
SPT - 13 35 Dense, dark grey, silty sand. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 27 Ditto but medium dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 27 17.6 40 Medium dense, dark grey, clayey sand with gravel. 16.8
56 17.1
57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 47 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Very dense, grey, silty sand. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-17
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 18
GROUND ELEVATION: 11.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-12-13
DEPTH OF GROUNDWATER TABLE: 8.50 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 4-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 SPT - 1 18 Very stiff, brown, sandy silty clay. 0.3
2 0.6
3 Ditto. 0.9
SPT - 2 18
4 1.2
5 1.5
6 SPT - 3 14 13.5 52 Ditto. 1.8
CL-ML
7 2.1
8 Medium dense, grey, poorly graded sand with silt. 2.4
SPT - 4 18
9 2.7
10 3.0
11 SPT - 5 22 Ditto. 3.4
12 3.7
13
SPT - 6 26 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 28 13.6 12 Ditto.
16 4.9
17 5.2
SP-SM
18 5.5
19 5.8
20 6.1
SPT - 8 31 Ditto but dense.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto but very dense.
26 7.9
27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 49 Ditto but dense.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 6
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 18
GROUND ELEVATION: 11.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-12-13
DEPTH OF GROUNDWATER TABLE: 8.50 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 4-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 42 Dense, grey, poorly graded sand with silt.
36 11.0
37 11.3
38 11.6
39 11.9
40 Hard, brown, sandy silty clay. 12.2
SPT - 12 45 20.4 51
41 12.5
42 CL-ML 12.8
43 13.1
44 13.4
45
SPT - 13 32 Ditto but very stiff. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 38 Ditto but hard. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 12.4 19 Very dense, brown, silty sand with occasional gravel. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 50 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 6
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 18
GROUND ELEVATION: 11.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-12-13
DEPTH OF GROUNDWATER TABLE: 8.50 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 4-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, silty sand with occasional gravel. 21.6
72 21.9
73 22.3
74 22.6
75 SPT - 19 >50 26.3 64 Hard, brown, sandy lean clay with occasional gravel. 22.9
76 23.2
CL
77 23.5
78 23.8
79 24.1
SPT - 20 46 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 >50 Very dense, brown, poorly graded sand.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Ditto.
90 27.4
91 27.7
92 28.0
93 28.3
94 Very dense, dark brown, silty clayey sand. 28.7
SPT - 23 >50 16.2 29
95 29.0
96 29.3
SC-SM
97 29.6
98 29.9
99 SPT - 24 >50 Ditto. 30.2
100 30.5
101 30.8
102 31.1
103 31.4
104 SPT - 25 >50 Ditto. 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 6
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 18
GROUND ELEVATION: 11.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-12-13
DEPTH OF GROUNDWATER TABLE: 8.50 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 4-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
106 Very dense, dark brown, silty clayey sand. 32.3
107 32.6
108 32.9
109
SPT - 26 >50 Hard, brown, lean clay with sand. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 25.4 73 Ditto. 34.7
115 35.1
116 CL 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Very dense, brown, silty sand. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 Hard, brown, sandy lean clay. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 26.1 65 Ditto. 39.3
130 39.6
131 CL 39.9
132 40.2
133 40.5
SPT - 31 >50 Ditto.
134 40.8
135 41.1
136 41.5
137 41.8
138 >50 16.0 25 42.1
SPT - 32 Very dense, brown, silty sand with occasional gravel.
139 SM 42.4
140 42.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 6
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 18
GROUND ELEVATION: 11.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-12-13
DEPTH OF GROUNDWATER TABLE: 8.50 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 4-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
141 Very dense, brown, silty sand with occasional gravel. 43.0
142 SM 43.3
143 43.6
SPT - 33 >50 Hard, brown, clayey silt.
144 43.9
145 44.2
146 44.5
147 44.8
148 45.1
SPT - 34 >50 Very dense, brown, silty clayey sand.
149 45.4
150 45.7
151 46.0
152 46.3
153 SPT - 35 >50 46.6
Ditto.
154 46.9
155 47.2
156 47.5
157 47.9
158 SPT - 36 >50 18.8 28 Ditto. 48.2
159 48.5
160 SC-SM 48.8
161 49.1
162 49.4
163 SPT - 37 >50 Ditto. 49.7
164 50.0
165 50.3
166 50.6
167 50.9
168 SPT - 38 >50 Ditto but with gravel. 51.2
169 51.5
170 51.8
171 52.1
172 52.4
173 SPT - 39 >50 Very dense, brown, silty sand. 52.7
174 53.0
175 53.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 5 OF 6
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.37 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 18
GROUND ELEVATION: 11.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-12-13
DEPTH OF GROUNDWATER TABLE: 8.50 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 4-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
176 53.6
177 53.9
178 SPT - 40 >50 16.2 23 Very dense, brown, silty sand. 54.3
179 54.6
180 SM 54.9
181 55.2
182 55.5
183 SPT - 41 >50 Ditto. 55.8
184 56.1
185 56.4
186 56.7
187 57.0
SPT - 42 >50 29.6 61 Hard, brown, sandy lean clay.
188 57.3
189 57.6
190 CL 57.9
191 58.2
192 58.5
SPT - 43 >50 Ditto.
193 58.8
194 59.1
195 59.4
196 59.7
197 60.0
198
SPT - 44 >50 Ditto. 60.4
END OF BORING @ 60.28 m.
199 60.7
200 61.0
201 61.3
202 61.6
203 61.9
204 62.2
205 62.5
206 62.8
207 63.1
208 63.4
209 63.7
210 64.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 6 OF 6
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,815.42 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 19
GROUND ELEVATION: 11.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 26-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 SPT - 1 10 Loose, brown, silty sand. 0.3
2 0.6
3 Very stiff, brown, sandy silty clay. 0.9
SPT - 2 26
4 1.2
5 1.5
6 SPT - 3 17 15.2 70 Ditto. 1.8
CL-ML
7 2.1
8 Very stiff, brown, sandy silt. 2.4
SPT - 4 22
9 2.7
10 3.0
11 SPT - 5 13 Ditto but stiff. 3.4
12 3.7
13
SPT - 6 12 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 17 21.8 65 Ditto but very stiff.
16 4.9
17 5.2
ML
18 5.5
19 5.8
20 6.1
SPT - 8 38 Dense, brown, silty sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 33 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 38 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 6
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,815.42 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 19
GROUND ELEVATION: 11.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 26-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 33 Dense, brown, silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40 Ditto. 12.2
SPT - 12 38
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 48 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 33 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 39 Ditto but grey. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 8.9 11 Very dense, brown, poorly graded sand with silt & gravel. 18.3
61
(Gravelly) 18.6
62 SP-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Very dense, brown, clayey sand. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 6
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,815.42 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 19
GROUND ELEVATION: 11.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 26-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, clayey sand. 21.6
72 21.9
73 22.3
74 22.6
75 SPT - 19 33 Ditto but dense. 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 47 26.3 49 Ditto.
80 24.4
81 24.7
SC
82 25.0
83 25.3
84 25.6
SPT - 21 >50 Ditto but very dense.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Very dense, brown, clayey gravel with sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50 18.9 42
95 29.0
96 29.3
GC
97 29.6
98 29.9
99 Very dense, brown, silty sand. 30.2
SPT - 24 >50
100 30.5
101 30.8
102 31.1
103 31.4
104 Ditto. 31.7
SPT - 25 >50
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 6
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,815.42 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 19
GROUND ELEVATION: 11.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 26-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
106 Very dense, brown, silty sand. 32.3
107 32.6
108 32.9
109
SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 Hard, brown, clayey silt with occasional gravel. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Very dense, brown, silty sand with occasional gravel. 36.3
120 36.6
121 SC 36.9
122 37.2
123 37.5
124 SPT - 29 >50 28.6 52 Hard, brown, sandy lean clay. 37.8
125 38.1
126 CL 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto. 39.3
130 39.6
131 39.9
132 40.2
133 40.5
134 SPT - 31 >50 Very dense, brown, clayey sand. 40.8
135 41.1
136 41.5
137 41.8
138 42.1
SPT - 32 >50 26.5 46 Ditto.
139 SC 42.4
140 42.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 6
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,815.42 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 19
GROUND ELEVATION: 11.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 26-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
141 Very dense, brown, clayey sand. 43.0
142 SC 43.3
143 43.6
SPT - 33 >50 Ditto.
144 43.9
145 44.2
146 44.5
147 44.8
148 45.1
SPT - 34 >50 Ditto.
149 45.4
150 45.7
151 46.0
152 46.3
153 46.6
SPT - 35 >50 19.6 35 Ditto but with cementation.
154 46.9
155 47.2
SC
156 47.5
157 47.9
158 Hard, brown, sandy lean clay with gravel. 48.2
SPT - 36 >50
159 48.5
160 48.8
161 49.1
162 49.4
163 Ditto. 49.7
SPT - 37 >50
164 50.0
165 50.3
166 50.6
167 50.9
168
SPT - 38 >50 19.2 61 Ditto. 51.2
169 51.5
170 CL 51.8
171 52.1
172 52.4
173
SPT - 39 >50 Ditto. 52.7
174 53.0
175 53.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 5 OF 6
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,815.42 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 19
GROUND ELEVATION: 11.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 26-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
176 53.6
177 53.9
178 SPT - 40 >50 Very dense, brown, silty clayey sand with gravel. 54.3
179 54.6
180 54.9
181 55.2
182 55.5
183 SPT - 41 >50 Ditto. 55.8
184 56.1
185 56.4
186 56.7
187 57.0
SPT - 42 >50 9.6 32 Ditto.
188 57.3
189 57.6
190 SC-SM 57.9
191 58.2
192 58.5
193 SPT - 43 >50 Very dense, brown, silty sand with traces of clay. 58.8
194 59.1
195 59.4
196 59.7
197 60.0
198 SPT - 44 >50 Ditto. 60.4
199 END OF BORING @ 60.45 m. 60.7
200 61.0
201 61.3
202 61.6
203 61.9
204 62.2
205 62.5
206 62.8
207 63.1
208 63.4
209 63.7
210 64.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 6 OF 6
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,778.19 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 20
GROUND ELEVATION: 10.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 29-12-13
DEPTH OF GROUNDWATER TABLE: 7.80 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 1-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 SPT - 1 10 Stiff, brown, sandy silt. 0.3
2 0.6
3 Ditto. 0.9
SPT - 2 14
4 1.2
5 1.5
6 SPT - 3 16 Ditto. 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 14
9 2.7
10 3.0
11 SPT - 5 09 15.5 58 Ditto. 3.4
ML
12 3.7
13
SPT - 6 16 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 25 20.2 82 Very stiff, brown, lean clay with sand.
16 4.9
17 5.2
CL
18 5.5
19 5.8
20 6.1
SPT - 8 43 Dense, brown, silty sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 27 Ditto but medium dense.
26 7.9
27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 24 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 SC 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 6
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,778.19 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 20
GROUND ELEVATION: 10.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 29-12-13
DEPTH OF GROUNDWATER TABLE: 7.80 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 1-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 14 23.1 47 Medium dense, brown, clayey sand with occasional gravel.
36 11.0
37 11.3
SC
38 11.6
39 11.9
40 Medium dense, brown, silty clayey sand. 12.2
SPT - 12 19
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 28 23.9 49 Ditto. 13.7
46 14.0
47 SC-SM 14.3
48 14.6
49 14.9
50 SPT - 14 35 Dense, brown, poorly graded sand with silt. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 48 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 17.2 12 Ditto but very dense. 19.8
66 20.1
67 SP-SM 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Hard, brown, sandy silt. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 6
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,778.19 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 20
GROUND ELEVATION: 10.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 29-12-13
DEPTH OF GROUNDWATER TABLE: 7.80 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 1-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Hard, brown, sandy silt. 21.6
72 21.9
73 22.3
74 22.6
75 U-1 Ditto. 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 19 >50 Very dense, brown, silty clayey sand.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 20 49 Ditto but dense.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 21 >50 Ditto but very dense.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 22 >50 14.1 31
95 29.0
96 29.3
SC-SM
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 23 >50
100 30.5
101 30.8
102 31.1
103 31.4
104 SPT - 24 >50 Ditto. 31.7
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 6
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,778.19 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 20
GROUND ELEVATION: 10.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 29-12-13
DEPTH OF GROUNDWATER TABLE: 7.80 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 1-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
106 Very dense, brown, silty clayey sand. 32.3
107 32.6
108 32.9
109 SPT - 25 >50 Very stiff, brown, lean clay with sand. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 26 24 Ditto but very stiff. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 27 >50 14.7 73 Ditto but hard. 36.3
120 36.6
121 CL 36.9
122 37.2
123 37.5
124 SPT - 28 >50 Ditto. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 29 >50 Ditto. 39.3
130 39.6
131 39.9
132 40.2
133 40.5
134 SPT - 30 >50 Very dense, brown, silty sand. 40.8
135 41.1
136 41.5
137 41.8
138 42.1
SPT - 31 >50 Ditto but with gravel.
139 42.4
140 42.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 6
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,778.19 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 20
GROUND ELEVATION: 10.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 29-12-13
DEPTH OF GROUNDWATER TABLE: 7.80 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 1-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
141 Very dense, brown, silty sand with gravel. 43.0
142 43.3
143 43.6
SPT - 32 >50 25.5 42 Very dense, brown, clayey sand.
144 43.9
145 44.2
SC
146 44.5
147 44.8
148 45.1
SPT - 33 >50 Ditto.
149 45.4
150 45.7
151 46.0
152 46.3
153 46.6
SPT - 34 >50 Ditto.
154 46.9
155 47.2
SC
156 47.5
157 47.9
158 Ditto. 48.2
SPT - 35 >50
159 48.5
160 48.8
161 49.1
162 49.4
163 SPT - 36 >50 20.8 40 Very dense, brown, gravelly sand. 49.7
164 50.0
165 50.3
166 50.6
167 50.9
168 SPT - 37 >50 11.9 50 Hard, brown sandy lean clay with cementation. 51.2
169 51.5
170 CL 51.8
171 52.1
172 52.4
173
SPT - 38 >50 Very dense, brown, clayey sand. 52.7
174 53.0
175 53.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 5 OF 6
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.12 meter TYPE OF BORING: ROTARY WASH
EAST: 220,778.19 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 20
GROUND ELEVATION: 10.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 29-12-13
DEPTH OF GROUNDWATER TABLE: 7.80 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 1-1-14
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
176 53.6
177 53.9
178 SPT - 39 >50 Very dense, brown, clayey sand with occasional gravel. 54.3
179 54.6
180 54.9
181 55.2
182 55.5
183 SPT - 40 >50 Ditto. 55.8
184 56.1
185 56.4
186 56.7
187 57.0
188 SPT - 41 >50 23.3 47 Ditto. 57.3
189 57.6
190 SC 57.9
191 58.2
192 58.5
193 SPT - 42 >50 Ditto. 58.8
194 59.1
195 59.4
196 59.7
197 60.0
198 SPT - 43 >50 Ditto. 60.4
199 END OF BORING @ 60.45 m. 60.7
200 61.0
201 61.3
202 61.6
203 61.9
204 62.2
205 62.5
206 62.8
207 63.1
208 63.4
209 63.7
210 64.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 6 OF 6
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 SPT - 1 06 Loose, brown, silty sand. 0.3
2 0.6
3 Ditto. 0.9
SPT - 2 08
4 1.2
5 1.5
6 SPT - 3 11 Stiff, brown, sandy silt. 1.8
7 2.1
8 Loose, brown, poorly graded sand with silt. 2.4
SPT - 4 10 9.5 10
9 SP-SM 2.7
10 3.0
11 SPT - 5 12 Ditto but medium dense. 3.4
12 3.7
13
SPT - 6 07 Medium stiff, brown, lean clay with sand. 4.0
14 4.3
15 4.6
SPT - 7 07 23.5 87 Ditto.
16 4.9
17 5.2
CL
18 5.5
19 5.8
20 6.1
SPT - 8 23 Medium dense, brown, silty sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 18 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 43 17.7 31 Ditto but dense.
31 9.4
32 9.8
SM
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 19 Medium dense, brown, silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40 Medium dense, brown, silty clayey sand. 12.2
SPT - 12 26
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 26 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 21 19.9 34 Ditto. 15.2
51 15.5
52 SC-SM 15.8
53 16.2
54 16.5
55 SPT - 15 30 Medium dense, brown, poorly graded sand with silt. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 32 Ditto but dense. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 15.3 10 Ditto but very dense. 19.8
66 20.1
67 SP-SM 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, poorly graded sand with silt. 21.6
72 21.9
73 22.3
74 22.6
75 SPT - 19 43 Dense, brown, clayey sand. 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 34 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 34 17.5 34 Ditto.
85 25.9
86 26.2
SC
87 26.5
88 26.8
89 27.1
SPT - 22 40 Dense, brown, silty clayey sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto but very dense. 30.2
SPT - 24 >50 15.8 33
100 30.5
101 SC-SM 30.8
102 31.1
103 31.4
104 Ditto. 31.7
SPT - 25 >50
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
106 Very dense, brown, silty clayey sand. 32.3
107 32.6
108 32.9
109
SPT - 26 >50 Hard, brown, sandy clay. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 44 Ditto. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 43 44.3 44 Dense, brown, silty sand with occasional gravel. 36.3
120 36.6
121 SM 36.9
122 37.2
123 37.5
124 SPT - 29 48 Ditto. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto but very dense. 39.3
130 39.6
131 39.9
132 40.2
133 40.5
134 SPT - 31 >50 Ditto. 40.8
135 41.1
136 41.5
137 41.8
138 >50 42.1
SPT - 32 Very dense, brown, silty sand with gravel. (Gravelly)
139 42.4
140 42.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
141 Very dense, brown, silty sand with gravel. (Gravelly) 43.0
142 43.3
143 >50 20.8 18 43.6
SPT - 33 Ditto.
144 43.9
145 44.2
SM
146 44.5
147 44.8
148 45.1
SPT - 34 >50 Hard, brown, clayey silt.
149 45.4
150 45.7
151 46.0
152 46.3
153 SPT - 35 >50 46.6
Very dense, brown, gravelly clayey sand.
154 46.9
155 47.2
156 47.5
157 47.9
158 Very dense, brown, silty sand. 48.2
SPT - 36 >50 17.8 22
159 48.5
160 SM 48.8
161 49.1
162 49.4
163 SPT - 37 >50 Ditto but with gravel. 49.7
164 50.0
165 50.3
166 50.6
167 50.9
168 SPT - 38 >50 19.5 17 Ditto. 51.2
169 51.5
170 SM 51.8
171 52.1
172 52.4
173 SPT - 39 >50 Hard, brown, sandy clay. 52.7
174 SC 53.0
175 53.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 5 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
176 53.6
SC
177 53.9
178 SPT - 40 >50 Very dense, brown, silty sand. 54.3
179 54.6
180 54.9
181 55.2
182 55.5
183 SPT - 41 >50 20.9 24 Ditto. 55.8
184 56.1
185 SM 56.4
186 56.7
187 57.0
188 SPT - 42 >50 Ditto. 57.3
189 57.6
190 57.9
191 58.2
192 58.5
193 SPT - 43 >50 Hard, brown, sandy lean clay. 58.8
194 59.1
195 59.4
196 59.7
197 60.0
198 SPT - 44 >50 17.9 54 Ditto. 60.4
199 60.7
200
CL 61.0
201 61.3
202 61.6
SPT - 45 >50 Ditto.
203 61.9
204 62.2
205 62.5
206 62.8
207 63.1
SPT - 46 >50 Very dense, brown, silty sand.
208 63.4
209 63.7
210 64.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 6 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
211 64.3
212 >50 64.6
SPT - 47 Very dense, brown, silty sand.
213 64.9
214 65.2
215 65.5
216 65.8
217 SPT - 48 >50 Ditto. 66.1
218 66.4
219 66.8
220 67.1
221 67.4
222 SPT - 49 >50 Ditto. 67.7
223 68.0
224 68.3
225 68.6
226 68.9
227 SPT - 50 >50 Ditto. 69.2
228 69.5
229 69.8
230 70.1
231 70.4
232 SPT - 51 >50 17.6 16 Ditto. 70.7
233 71.0
234 SM 71.3
235 71.6
236 71.9
237
SPT - 52 >50 Ditto. 72.2
238 72.5
239 72.8
240 73.2
241 73.5
242 SPT - 53 >50 Ditto. 73.8
243 74.1
244 74.4
245 74.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 7 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
246 75.0
247 SPT - 54 >50 Very dense, brown, silty sand. 75.3
248 75.6
249 75.9
250 76.2
251 76.5
252 SPT - 55 >50 Hard, brown, lean clay with sand. 76.8
253 77.1
254 77.4
255 77.7
256 78.0
257 SPT - 56 >50 34.1 82 Ditto. 78.3
258 78.6
259 CL 78.9
260 79.2
261 79.6
262 SPT - 57 >50 Very dense, brown, silty sand. 79.9
263 80.2
264 80.5
265 80.8
266 81.1
SPT - 58 >50 22.3 42 Ditto.
267 81.4
268 81.7
SM
269 82.0
270 82.3
271 82.6
SPT - 59 >50 Ditto.
272 82.9
273 83.2
274 83.5
275 83.8
276 SPT - 60 >50 84.1
Ditto but with gravel.
277 84.4
278 84.7
279 85.0
280 85.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 8 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.89 meter TYPE OF BORING: ROTARY WASH
EAST: 220,796.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 21
GROUND ELEVATION: 11.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 22-12-13
DEPTH OF GROUNDWATER TABLE: 8.70 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 31-12-13
MEASURED AT: 1330 HOURS ON: 4-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
281 Very dense, brown, silty sand with gravel. 85.6
SPT - 61 >50
282 86.0
283 86.3
284 86.6
285 86.9
286 SPT - 62 >50 14.8 15 Very dense, brown, clayey sand with gravel. (Gravelly) 87.2
287 87.5
288 SC 87.8
289 88.1
290 88.4
291 Ditto. 88.7
SPT - 63 >50
292 89.0
293 89.3
294 89.6
295 89.9
296
SPT - 64 >50 Ditto. 90.2
297 90.5
END OF BORING @ 90.45 m.
298 90.8
299 91.1
300 91.4
301 91.7
302 92.0
303 92.4
304 92.7
305 93.0
306 93.3
307 93.6
308 93.9
309 94.2
310 94.5
311 94.8
312 95.1
313 95.4
314 95.7
315 96.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 9 OF 9
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.34 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 22
GROUND ELEVATION: 11.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-1-14
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 12-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 SPT - 1 11 Medium dense, brown, silty sand. 0.3
2 0.6
3 Ditto. 0.9
SPT - 2 18
4 1.2
5 1.5
6 SPT - 3 14 7.6 17 Ditto. 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 13
9 2.7
10 3.0
11 SPT - 5 12 Medium dense, brown, clayey sand. 3.4
12 3.7
13
SPT - 6 19 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 24 10.3 15 Medium dense, brown, silty sand.
16 4.9
17 5.2
SM
18 5.5
19 5.8
20 6.1
SPT - 8 27 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 38 Dense, brown, clayey sand.
26 7.9
27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 28 Medium dense, brown, silty sand.
31 9.4
32 9.8
33 10.1
34 10.4
35 CL 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 6
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.34 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 22
GROUND ELEVATION: 11.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-1-14
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 12-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 28 24.1 55 Very stiff, brown, sandy lean clay.
36 11.0
37 11.3
CL
38 11.6
39 11.9
40 Ditto. 12.2
SPT - 12 20
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 18 16.2 28 Medium dense, brown, silty sand. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 23 Very stiff, brown, sandy clay. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 33 Dense, brown, silty sand. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 50 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 45 22.7 56 CL Hard, brown, sandy lean clay with occasional gravel. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 6
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.34 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 22
GROUND ELEVATION: 11.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-1-14
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 12-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Hard, brown, sandy lean clay with occasional gravel. 21.6
72 CL 21.9
73 22.3
74 22.6
75 SPT - 19 32 Ditto but very stiff. 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 41 Ditto but hard.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 41 20.2 31 Dense, brown, silty sand.
85 25.9
86 26.2
SM
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Ditto but very dense.
90 27.4
91 27.7
92 28.0
93 28.3
94 Very dense, brown, silty clayey sand. 28.7
SPT - 23 >50 14.0 29
95 29.0
96 29.3
SC-SM
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50
100 30.5
101 30.8
102 31.1
103 31.4
104 Ditto. 31.7
SPT - 25 >50
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 6
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.34 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 22
GROUND ELEVATION: 11.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-1-14
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 12-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
106 Very dense, brown, silty clayey sand. 32.3
107 32.6
108 32.9
109 SPT - 26 >50 15.2 37 Ditto. 33.2
110 33.5
111 SC-SM 33.8
112 34.1
113 34.4
114 SPT - 27 40 Hard, brown, sandy lean clay. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 24.8 68 Ditto. 36.3
120 36.6
121 CL 36.9
122 37.2
123 37.5
124 SPT - 29 >50 Ditto but with occasional gravel. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Very dense, brown, silty sand. 39.3
130 39.6
131 39.9
132 40.2
133 40.5
134 SPT - 31 >50 15.1 18 Ditto. 40.8
135 41.1
136
SM 41.5
137 41.8
138 42.1
SPT - 32 >50 15.8 32 Very dense, brown, silty clayey sand with gravel.
139 SC-SM 42.4
140 42.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 6
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.34 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 22
GROUND ELEVATION: 11.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-1-14
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 12-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
141 Very dense, brown, silty clayey sand with gravel. 43.0
142 SC-SM 43.3
143 43.6
SPT - 33 >50 Ditto.
144 43.9
145 44.2
146 44.5
147 44.8
148 45.1
SPT - 34 >50 Ditto.
149 45.4
150 45.7
151 46.0
152 46.3
153 46.6
SPT - 35 >50 Very dense, brown, silty sand.
154 46.9
155 47.2
156 47.5
157 47.9
158 Ditto. 48.2
SPT - 36 >50 18.3 21
159 48.5
160 SM 48.8
161 49.1
162 49.4
163 SPT - 37 >50 49.7
Very dense, brown, clayey sand.
164 50.0
165 50.3
166 50.6
167 50.9
168
SPT - 38 >50 25.5 68 Hard, brown, sandy lean clay. 51.2
169 51.5
170 CL 51.8
171 52.1
172 52.4
173 SPT - 39 >50 Very dense, brown poorly graded sand with gravel. 52.7
174 53.0
175 53.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 5 OF 6
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,520.34 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 22
GROUND ELEVATION: 11.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-1-14
DEPTH OF GROUNDWATER TABLE: 7.90 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 12-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
176 53.6
177 53.9
178 SPT - 40 >50 Very dense, brown poorly graded sand with gravel. 54.3
179 54.6
180 54.9
181 55.2
182 55.5
183 SPT - 41 >50 Hard, brown, sandy silty clay with gravel. 55.8
184 56.1
185 56.4
186 56.7
187 57.0
188 SPT - 42 >50 26.0 51 Ditto. 57.3
189 57.6
190 CL-ML 57.9
191 58.2
192 58.5
193 SPT - 43 >50 Ditto. 58.8
194 59.1
195 59.4
196 59.7
197 60.0
198 SPT - 44 >50 Ditto. 60.4
199 END OF BORING @ 60.45 m. 60.7
200 61.0
201 61.3
202 61.6
203 61.9
204 62.2
205 62.5
206 62.8
207 63.1
208 63.4
209 63.7
210 64.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 6 OF 6
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,895.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 23
GROUND ELEVATION: 11.07 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-1-14
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 6-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 SPT - 1 08 Loose, brown, silty sand with traces of clay. 0.3
2 0.6
3 Ditto but medium dense. 0.9
SPT - 2 11
4 1.2
5 1.5
6 SPT - 3 15 21.4 81 Stiff, brown, lean clay with sand. 1.8
CL
7 2.1
8 Medium dense, brown, silty sand. 2.4
SPT - 4 11
9 2.7
10 3.0
11 SPT - 5 13 Stiff, brown, sandy clayey silt. 3.4
12 3.7
13
SPT - 6 19 9.3 35 Medium dense, brown, silty sand. 4.0
14 SM 4.3
15 4.6
SPT - 7 18 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 29 Medium dense, brown, occasionally indurated clayey sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 30 Medium dense, brown, silty sand.
26 7.9
27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 23 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 CL 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 6
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,895.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 23
GROUND ELEVATION: 11.07 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-1-14
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 6-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 30 22.5 56 Very stiff, brown, sandy lean clay with occasional gravel.
36 11.0
37 11.3
CL
38 11.6
39 11.9
40 Ditto. 12.2
SPT - 12 25
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 33 Ditto but hard. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 42 Dense, brown, silty sand. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 33 16.7 13 Ditto. 16.8
56 17.1
57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 38 Dense, brown, poorly graded sand with gravel. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense & gravelly. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Hard, brown, sandy lean clay. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 6
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,895.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 23
GROUND ELEVATION: 11.07 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-1-14
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 6-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Hard, brown, sandy lean clay. 21.6
72 21.9
73 22.3
74 22.6
75 SPT - 19 >50 23.3 68 Ditto. 22.9
76 23.2
CL
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 40 Dense, brown, poorly graded sand.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Very dense, brown, clayey sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50 16.0 35
95 29.0
96 29.3
SC
97 29.6
98 29.9
99 Ditto but dense. 30.2
SPT - 24 48
100 30.5
101 30.8
102 31.1
103 31.4
104 Ditto but very dense. 31.7
SPT - 25 >50
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 6
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,895.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 23
GROUND ELEVATION: 11.07 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-1-14
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 6-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
106 Very dense, brown, clayey sand. 32.3
107 32.6
108 32.9
109
SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 18.6 26 Very dense, brown, silty sand. 34.7
115 35.1
116 SM 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Very dense, brown, clayey sand. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 29.7 41 Ditto. 37.8
125 38.1
126 SC 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Very dense, brown, silty sand. 39.3
130 39.6
131 39.9
132 40.2
133 40.5
134 SPT - 31 >50 16.4 19 Ditto. 40.8
135 41.1
136
SM 41.5
137 41.8
138 42.1
SPT - 32 >50 Hard, brown, sandy clay with cementation.
139 42.4
140 42.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 6
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,895.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 23
GROUND ELEVATION: 11.07 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-1-14
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 6-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
141 Hard, brown, sandy clay with cementation. 43.0
142 43.3
143 43.6
SPT - 33 >50 Very dense, brown, silty sand.
144 43.9
145 44.2
146 44.5
147 44.8
148 45.1
SPT - 34 >50 29.9 65 Hard, brown, sandy lean clay with occasional gravel.
149 45.4
150 45.7
CL
151 46.0
152 46.3
153 46.6
SPT - 35 >50 Very dense, brown, silty sand.
154 46.9
155 47.2
156 47.5
157 47.9
158 Ditto. 48.2
SPT - 36 >50
159 48.5
160 48.8
161 49.1
162 49.4
163 Ditto. 49.7
SPT - 37 >50
164 50.0
165 50.3
166 50.6
167 50.9
168 SPT - 38 >50 Ditto. 51.2
169 51.5
170 51.8
171 52.1
172 52.4
173
SPT - 39 >50 16.7 23 Ditto but grey. 52.7
174 SM 53.0
175 53.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 5 OF 6
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,895.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 23
GROUND ELEVATION: 11.07 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-1-14
DEPTH OF GROUNDWATER TABLE: 8.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 6-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
176 53.6
SM
177 53.9
178 SPT - 40 >50 Very dense, grey, silty sand. 54.3
179 54.6
180 54.9
181 55.2
182 55.5
183 SPT - 41 >50 Ditto but brown. 55.8
184 56.1
185 56.4
186 56.7
187 57.0
188 SPT - 42 >50 29.2 69 Hard, brown, sandy lean clay with occasional gravel. 57.3
189 57.6
190 CL 57.9
191 58.2
192 58.5
193 SPT - 43 >50 Very dense, brown, silty sand. 58.8
194 59.1
195 59.4
196 59.7
197 60.0
198 SPT - 44 >50 Ditto. 60.4
199 END OF BORING @ 60.42 m. 60.7
200 61.0
201 61.3
202 61.6
203 61.9
204 62.2
205 62.5
206 62.8
207 63.1
208 63.4
209 63.7
210 64.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 6 OF 6
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,858.24 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 24
GROUND ELEVATION: 11.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-1-14
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 SPT - 1 13 Medium dense, brown, silty sand. 0.3
2 0.6
3 Ditto. 0.9
SPT - 2 12
4 1.2
5 1.5
6 SPT - 3 11 13.3 40 Ditto. 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 14
9 2.7
10 3.0
11 SPT - 5 14 Ditto. 3.4
12 3.7
13
SPT - 6 18 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 18 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 22 12.4 13 Ditto.
21 6.4
22 6.7
SM
23 7.0
24 7.3
25 7.6
SPT - 9 32 Ditto but dense.
26 7.9
27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 27 Ditto but medium dense.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 6
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,858.24 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 24
GROUND ELEVATION: 11.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-1-14
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 31 Dense, brown, silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40 Very stiff, brown, sandy lean clay with occasional gravel. 12.2
SPT - 12 27 20.3 58
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
SPT - 13 23 Medium dense, brown, silty clayey sand. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 25 23.8 23 Ditto. 15.2
51 15.5
52 SC-SM 15.8
53 16.2
54 16.5
55 SPT - 15 30 Ditto but with occasional gravel. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 44 Dense, brown, silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 13.7 18 Ditto but very dense, grey. 19.8
66 20.1
67 SM 20.4
68 20.7
69 21.0
70 SPT - 18 47 Ditto but dense. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 6
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,858.24 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 24
GROUND ELEVATION: 11.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-1-14
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Dense, brown, silty sand. 21.6
72 21.9
73 22.3
74 22.6
75 SPT - 19 34 25.1 70 Hard, brown, sandy lean clay. 22.9
76 23.2
CL
77 23.5
78 23.8
79 24.1
SPT - 20 49 Ditto.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 36 Dense, brown, silty sand.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 15.4 13 Ditto but very dense, with gravel.
90 27.4
91 27.7
SM
92 28.0
93 28.3
94 Very dense, brown, clayey sand. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50 17.2 39
100 30.5
101 SC 30.8
102 31.1
103 31.4
104 Very dense, brown, silty sand. 31.7
SPT - 25 >50
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 6
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,858.24 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 24
GROUND ELEVATION: 11.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-1-14
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
106 Very dense, brown, silty sand. 32.3
107 32.6
108 32.9
109
SPT - 26 >50 12.2 43 Ditto. 33.2
110 33.5
111 SM 33.8
112 34.1
113 34.4
114 SPT - 27 46 Hard, brown, sandy lean clay. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Ditto. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 22.7 60 Ditto. 37.8
125 38.1
126 CL 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto. 39.3
130 39.6
131 39.9
132 40.2
133 40.5
134 SPT - 31 >50 Ditto. 40.8
135 41.1
136 41.5
137 41.8
138 >50 42.1
SPT - 32 Very dense, brown, gravelly sand.
139 42.4
140 42.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 6
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,858.24 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 24
GROUND ELEVATION: 11.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-1-14
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
141 Very dense, brown, gravelly sand. 43.0
142 43.3
143 43.6
SPT - 33 >50 Hard, brown, sandy lean clay.
144 43.9
145 44.2
146 44.5
147 44.8
148 45.1
SPT - 34 >50 20.7 63 Ditto.
149 45.4
150 45.7
CL
151 46.0
152 46.3
153 46.6
SPT - 35 >50 Ditto.
154 46.9
155 47.2
156 47.5
157 47.9
158 SPT - 36 >50 Very dense, brown, silty sand. 48.2
159 48.5
160 48.8
161 49.1
162 49.4
163 Ditto. 49.7
SPT - 37 >50
164 50.0
165 50.3
166 50.6
167 50.9
168
SPT - 38 >50 15.2 23 Ditto. 51.2
169 51.5
170 SM 51.8
171 52.1
172 52.4
173
SPT - 39 >50 Ditto. 52.7
174 53.0
175 53.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 5 OF 6
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,488.09 meter TYPE OF BORING: ROTARY WASH
EAST: 220,858.24 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 24
GROUND ELEVATION: 11.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-1-14
DEPTH OF GROUNDWATER TABLE: 8.10 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 5-1-14
MEASURED AT: 1130 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
176 53.6
177 53.9
178 SPT - 40 >50 Very dense, brown, silty sand. 54.3
179 54.6
180 54.9
181 55.2
182 55.5
183 SPT - 41 >50 20.2 42 Very dense, brown, clayey sand. 55.8
184 56.1
185 SC 56.4
186 56.7
187 57.0
188 SPT - 42 >50 Very dense, brown, silty sand. 57.3
189 57.6
190 57.9
191 58.2
192 58.5
193 SPT - 43 >50 Hard, brown, clayey silt. 58.8
194 59.1
195 59.4
196 59.7
197 60.0
198 SPT - 44 >50 Ditto. 60.4
199 END OF BORING @ 60.45 m. 60.7
200 61.0
201 61.3
202 61.6
203 61.9
204 62.2
205 62.5
206 62.8
207 63.1
208 63.4
209 63.7
210 64.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 6 OF 6
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
1 SPT - 1 12 Medium dense, brown, silty sand. 0.3
2 0.6
3 Ditto. 0.9
SPT - 2 11
4 1.2
5 1.5
6 SPT - 3 14 7.5 40 Ditto. 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 11
9 2.7
10 3.0
11 SPT - 5 14 Ditto. 3.4
12 3.7
13
SPT - 6 20 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 24 10.8 25 Ditto.
16 4.9
17 5.2
SM
18 5.5
19 5.8
20 6.1
SPT - 8 42 Ditto but dense.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 47 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 25 Ditto but medium dense.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 28 Medium dense, brown, silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40 Medium dense, brown, silty clayey sand. 12.2
SPT - 12 24 20.0 43
41 12.5
42 SC-SM 12.8
43 13.1
44 13.4
45
SPT - 13 31 Ditto but dense. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 25 Ditto but medium dense. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 16 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 36 17.9 14 Medium dense, brown, silty sand. 18.3
61 18.6
62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
71 Very dense, brown, silty sand with gravel. 21.6
72 21.9
73 22.3
74 22.6
75 SPT - 19 27 24.2 59 Very stiff, brown, sandy lean clay with occasional gravel. 22.9
76 23.2
CL
77 23.5
78 23.8
79 24.1
SPT - 20 41 Ditto but hard.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 44 Dense, brown, clayey sand.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 24.2 40 Ditto but very dense.
90 27.4
91 27.7
SC
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Very dense, brown, silty sand. 30.2
SPT - 24 >50 18.4 33
100 30.5
101 SM 30.8
102 31.1
103 31.4
104 Ditto. 31.7
SPT - 25 >50
105 32.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
106 Very dense, brown, silty sand. 32.3
107 32.6
108 32.9
109
SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 15.2 20 Ditto. 34.7
115 35.1
116 SM 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Very dense, brown, silty clayey sand. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 Ditto. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 20.5 42 Ditto. 39.3
130 39.6
131 SC-SM 39.9
132 40.2
133 40.5
134 SPT - 31 >50 Very dense, brown, well graded sand with silt & gravel. 40.8
135 41.1
136 41.5
137 41.8
138 42.1
SPT - 32 >50 13.4 12 Ditto.
139 SW-SM 42.4
140 42.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
141 Very dense, brown, well graded sand with silt & gravel. 43.0
142 SW-SM 43.3
143 43.6
SPT - 33 >50 Very dense, brown, clayey sand.
144 43.9
145 44.2
146 44.5
147 44.8
148 45.1
SPT - 34 >50 22.2 47 Ditto.
149 45.4
150 45.7
SC
151 46.0
152 46.3
153 SPT - 35 >50 46.6
Ditto but with cementation.
154 46.9
155 47.2
156 47.5
157 47.9
158 Very dense, brown, silty sand. 48.2
SPT - 36 >50
159 48.5
160 48.8
161 49.1
162 49.4
163 Ditto. 49.7
SPT - 37 >50
164 50.0
165 50.3
166 50.6
167 50.9
168
SPT - 38 >50 14.8 19 Ditto. 51.2
169 51.5
170 SM 51.8
171 52.1
172 52.4
173
SPT - 39 >50 Ditto. 52.7
174 53.0
175 53.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 5 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
176 53.6
177 53.9
178 SPT - 40 >50 Very dense, brown, silty sand. 54.3
179 54.6
180 54.9
181 55.2
182 55.5
183 SPT - 41 >50 Ditto. 55.8
184 56.1
185 56.4
186 56.7
187 57.0
188 SPT - 42 >50 Ditto. 57.3
189 57.6
190 57.9
191 58.2
192 58.5
193 SPT - 43 >50 25.9 55 Hard, brown, sandy silty clay. 58.8
194 59.1
195 CL-ML 59.4
196 59.7
197 60.0
198 SPT - 44 >50 Very dense, brown, silty clayey sand with gravel. 60.4
199 60.7
200 61.0
201 61.3
202 61.6
SPT - 45 >50 12.4 27 Ditto.
203 61.9
204 62.2
SC-SM
205 62.5
206 62.8
207 >50 63.1
SPT - 46 Ditto.
208 63.4
209 63.7
210 64.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 6 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
211 64.3
212 64.6
SPT - 47 >50 Very dense, brown, silty sand.
213 64.9
214 65.2
215 65.5
216 65.8
217 Hard, brown, clayey silt. 66.1
SPT - 48 >50
218 66.4
219 66.8
220 67.1
221 67.4
222 Very dense, brown, silty sand. 67.7
SPT - 49 >50
223 68.0
224 68.3
225 68.6
226 68.9
227 Ditto. 69.2
SPT - 50 >50 18.2 27
228 69.5
229 SM 69.8
230 70.1
231 70.4
SPT - 51 >50
232 Ditto but with gravel. 70.7
233 71.0
234 71.3
235 71.6
236 71.9
237 SPT - 52 >50 Very dense, brown, silty clayey sand. 72.2
238 72.5
239 72.8
240 73.2
241 73.5
242 SPT - 53 >50 Ditto. 73.8
243 74.1
244 74.4
245 74.7
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 7 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
246 75.0
247 SPT - 54 >50 24.3 41 Very dense, brown, silty clayey sand with occasional gravel. 75.3
248 75.6
249 SC-SM 75.9
250 76.2
251 76.5
252 SPT - 55 >50 Ditto. 76.8
253 77.1
254 77.4
255 77.7
256 78.0
257 SPT - 56 >50 Ditto. 78.3
258 78.6
259 78.9
260 79.2
261 79.6
262 SPT - 57 >50 Ditto. 79.9
263 80.2
264 80.5
265 80.8
266 81.1
SPT - 58 >50 Ditto.
267 81.4
268 81.7
269 82.0
270 82.3
271 82.6
SPT - 59 >50 Very dense, brown, silty sand.
272 82.9
273 83.2
274 83.5
275 83.8
276 SPT - 60 >50 12.5 13 84.1
Very dense, brown, silty clayey gravel with sand. (Sandy)
277 84.4
278 GC-GM 84.7
279 85.0
280 85.3
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 8 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,498.85 meter TYPE OF BORING: ROTARY WASH
EAST: 220,876.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 25
GROUND ELEVATION: 11.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 6-1-14
DEPTH OF GROUNDWATER TABLE: 8.30 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-1-14
MEASURED AT: 0900 HOURS ON: 15-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
281 SPT - 61 >50 44.5 76 Hard, brown, lean clay with sand. 85.6
282 86.0
283 86.3
CL
284 86.6
285 86.9
286 SPT - 62 >50 Very dense, brown, silty sand. 87.2
287 87.5
288 87.8
289 88.1
290 88.4
291 SPT - 63 >50 Ditto. 88.7
292 89.0
293 89.3
294 89.6
295 89.9
296
SPT - 64 >50 Hard, brown, clayey silt. 90.2
297 90.5
END OF BORING @ 90.45 m.
298 90.8
299 91.1
300 91.4
301 91.7
302 92.0
303 92.4
304 92.7
305 93.0
306 93.3
307 93.6
308 93.9
309 94.2
310 94.5
311 94.8
312 95.1
313 95.4
314 95.7
315 96.0
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 9 OF 9
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,283.77 meter TYPE OF BORING: ROTARY WASH
EAST: 221,012.68 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 26
GROUND ELEVATION: 12.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-12-13
DEPTH OF GROUNDWATER TABLE: 8.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 1125 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 16 Stiff, brown, sandy silt. 0.3


2 0.6
3 Ditto. 0.9
SPT - 2 16 12.8 51
4 ML 1.2
5 1.5
6 SPT - 3 18 Ditto but very stiff. 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 31
9 2.7
10 3.0
11 SPT - 5 14 17.3 50 Ditto but stiff. 3.4
ML
12 3.7
13
SPT - 6 9 Stiff, brown, sandy silty clay. 4.0
14 4.3
15 4.6
SPT - 7 10 23.4 51 Ditto.
16 4.9
17 5.2
CL-ML
18 5.5
19 5.8
20 6.1
SPT - 8 19 Medium dense, yellowish brown, silty sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 13.1 20 Ditto but very dense.
26 7.9
27 8.2
SM
28 8.5
29 8.8
30 Medium dense, brown, silty clayey sand. 9.1
SPT - 10 23
31 9.4
32 U-1 12.6 41 Brown, clayey gravel with sand. 9.8
33 GC 10.1
34 10.4
35 SC-SM 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-26
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,283.77 meter TYPE OF BORING: ROTARY WASH
EAST: 221,012.68 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 26
GROUND ELEVATION: 12.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-12-13
DEPTH OF GROUNDWATER TABLE: 8.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 1125 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 14 24.1 45 Medium dense, brown, silty clayey sand with occasional
36 11.0
gravel.
37 11.3
SC-SM
38 11.6
39 11.9
40
SPT - 12 24 Very stiff, brown, sandy silty clay. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 23 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 29 25.5 68 Ditto. 15.2
51 15.5
52 CL-ML 15.8
53 16.2
54 16.5
55 SPT - 15 38 Ditto but hard. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 40 Dense, brown, silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 44 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 13.1 13 SM Very dense, brown, silty sand with gravel. (Gravelly) 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-26
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,283.77 meter TYPE OF BORING: ROTARY WASH
EAST: 221,012.68 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 26
GROUND ELEVATION: 12.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-12-13
DEPTH OF GROUNDWATER TABLE: 8.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 1125 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty sand with gravel. (Gravelly) 21.6


72 SM 21.9
73 22.3
74 22.6
SPT - 19 >50 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 25.5 62 Hard, brown, sandy lean clay with gravel.
80 24.4
81 24.7
CL
82 25.0
83 25.3
84 25.6
SPT - 21 50 Dense, brown, clayey sand with gravel.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Very dense, brown, silty sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50 14.7 18
95 29.0
96 29.3
SM
97 29.6
98 29.9
99 Very dense, brown, silty clayey sand. 30.2
SPT - 24 >50 15.7 27
100 30.5
101 SC-SM 30.8
102 31.1
103 31.4
104
SPT - 25 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-26
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,283.77 meter TYPE OF BORING: ROTARY WASH
EAST: 221,012.68 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 26
GROUND ELEVATION: 12.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-12-13
DEPTH OF GROUNDWATER TABLE: 8.20 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 1125 HOURS ON: 14-1-14 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, brown, silty clayey sand. 32.3


107 32.6
108 32.9
109
SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 15.4 23 Ditto but with occasional gravel. 34.7
115 35.1
116 SC-SM 35.4
117 35.7
118 36.0
119 SPT - 28 40 41.7 63 Hard, brown, sandy elastic silt with gravel. 36.3
120 36.6
121 MH 36.9
122 37.2
123 37.5
124 SPT - 29 >50 Ditto. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto. 39.3
130 39.6
131 39.9
132
SPT - 31 >50 Very dense, brown, silty sand. 40.2
133 40.5
END OF BORING @ 40.45 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-26
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,310.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,971.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 27
GROUND ELEVATION: 12.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-12-13
MEASURED AT: 1600 HOURS ON: 16-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 17 Medium dense, brown, silty sand. 0.3


2 0.6
3 Ditto. 0.9
SPT - 2 27
4 1.2
5 1.5
6 SPT - 3 33 11.6 37 Ditto but dense with traces of clay. 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 38
9 2.7
10 3.0
11 SPT - 5 11 Ditto but medium dense. 3.4
12 3.7
13
SPT - 6 10 15.0 37 Ditto but loose. 4.0
14 SM 4.3
15 4.6
SPT - 7 15 Ditto but medium dense.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 27 Medium dense brown, silty sand.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 30 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 Ditto but dense. 9.1
SPT - 10 35 13.6 40
31 9.4
32 9.8
SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-27
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,310.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,971.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 27
GROUND ELEVATION: 12.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-12-13
MEASURED AT: 1600 HOURS ON: 16-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 25 Medium dense brown, silty sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 23 Very stiff, brown, lean clay with sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 26 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 18 31.4 77 Ditto. 15.2
51 15.5
52 CL 15.8
53 16.2
54 16.5
55 SPT - 15 22 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 29 Medium dense brown, silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 41 18.6 16 Ditto but dense with occasional gravel. 19.8
66 20.1
67 SM 20.4
68 20.7
69 21.0
70 SPT - 18 45 Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-27
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,310.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,971.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 27
GROUND ELEVATION: 12.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-12-13
MEASURED AT: 1600 HOURS ON: 16-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense brown, silty sand with occasional gravel. 21.6


72 21.9
73 22.3
74 22.6
SPT - 19 46 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 47 Ditto but with traces of clay.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 43 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 14.0 13 Ditto but very dense with gravel.
90 27.4
91 27.7
SM
92 28.0
93 28.3
94 Very dense, brown, clayey sand. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50
100 30.5
101 30.8
102 31.1
103 31.4
104
SPT - 25 >50 33.3 83 Hard, brown, lean clay with sand. 31.7
CL
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-27
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,310.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,971.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 27
GROUND ELEVATION: 12.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 14-12-13
MEASURED AT: 1600 HOURS ON: 16-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Hard, brown, lean clay with sand. 32.3


107 CL 32.6
108 32.9
109 SPT - 26 >50 Very dense, brown, silty sand. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 Ditto. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 50 Hard, brown, sandy silty clay. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 Ditto. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 22.0 69 Ditto. 39.3
130 CL-ML 39.6
131 39.9
132 SPT - 31 >50 Ditto. 40.2
133 END OF BORING @ 40.25 m. 40.5
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-27
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,334.87 meter TYPE OF BORING: ROTARY WASH
EAST: 221,012.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 28
GROUND ELEVATION: 12.02 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 0800 HOURS ON: 19-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 13 Medium dense, dark brown, silty sand. 0.3


2 0.6
3 Ditto but with traces of clay. 0.9
SPT - 2 21
4 1.2
5 1.5
6 SPT - 3 25 Ditto. 1.8
7 2.1
8 Stiff, light brown, silty clay with sand. 2.4
SPT - 4 09 18.1 77
9 CL-ML 2.7
10 3.0
11 SPT - 5 11 Ditto. 3.4
12 3.7
13
SPT - 6 13 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 32 Dense, light brown, silty sand.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 34 12.4 20 Ditto but with occasioanl gravel.
21 6.4
22 6.7
SM
23 7.0
24 7.3
25 7.6
SPT - 9 38 Ditto.
26 7.9
27 8.2
28 8.5
29 8.8
30 Ditto. 9.1
SPT - 10 41
31 9.4
32 9.8
33 10.1
34 10.4
35 SC-SM 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,334.87 meter TYPE OF BORING: ROTARY WASH
EAST: 221,012.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 28
GROUND ELEVATION: 12.02 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 0800 HOURS ON: 19-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 08 21.5 47 Loose, brown, silty clayey sand.
36 11.0
37 11.3
SC-SM
38 11.6
39 11.9
40
SPT - 12 23 Very stiff, dark grey, lean clay with sand. 12.2
41 12.5
42 U-1 15.2 75 Ditto. 12.8
43 CL 13.1
44 13.4
45
SPT - 13 11 Ditto but stiff. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 31 Ditto but very stiff, grey. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 21 31.7 83 Ditto. 16.8
56 17.1
57 CL 17.4
58 17.7
59 18.0
60 SPT - 16 22 Ditto. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 37 Dense, brown, poorly graded sand with silt. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 36 19.6 10 SP-SM Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,334.87 meter TYPE OF BORING: ROTARY WASH
EAST: 221,012.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 28
GROUND ELEVATION: 12.02 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 0800 HOURS ON: 19-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, brown, poorly graded sand with silt. 21.6


72 SP-SM 21.9
73 22.3
74 22.6
SPT - 19 41 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 24.0 53 Hard, dark grey, sandy lean clay with gravel.
80 24.4
81 24.7
CL
82 25.0
83 25.3
84 25.6
SPT - 21 46 Ditto.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Very dense, brown, silty clayey sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 Ditto. 30.2
SPT - 24 >50 14.3 20
100 30.5
101 SC-SM 30.8
102 31.1
103 31.4
104
SPT - 25 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,334.87 meter TYPE OF BORING: ROTARY WASH
EAST: 221,012.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 28
GROUND ELEVATION: 12.02 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 0800 HOURS ON: 19-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, brown, silty clayey sand. 32.3


107 32.6
108 32.9
109 SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 22.6 57 Hard, brown, sandy lean clay with gravel. 34.7
115 35.1
116 CL 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Ditto. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 Very dense, dark brown, silty clayey sand. 37.8
125 38.1
126 38.4
127 38.7
128 39.0
129 SPT - 30 >50 22.2 38 Ditto. 39.3
130 SC-SM 39.6
131 39.9
132
SPT - 31 >50 Ditto. 40.2
133 40.5
END OF BORING @ 40.45 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,388.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,971.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 29
GROUND ELEVATION: 12.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 15-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 16-12-13
MEASURED AT: 0812 HOURS ON: 18-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 15 Medium dense, dark brown, silty sand. 0.3


2 0.6
3 Ditto but dense, grey. 0.9
SPT - 2 32
4 1.2
5 1.5
6 SPT - 3 27 14.9 42 Ditto but medium dense. 1.8
SM
7 2.1
8 Ditto but very dense, dark brown. 2.4
SPT - 4 >50
9 2.7
10 3.0
11 SPT - 5 14 21.2 75 Stiff, grey, lean clay with sand. 3.4
CL
12 3.7
13
SPT - 6 13 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 16 Medium dense, grey, silty sand.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 48 Ditto but dense.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 16.5 21 Ditto but very dense.
26 7.9
27 8.2
SM
28 8.5
29 8.8
30 Ditto but dense. 9.1
SPT - 10 37
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-29
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,388.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,971.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 29
GROUND ELEVATION: 12.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 15-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 16-12-13
MEASURED AT: 0812 HOURS ON: 18-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, grey, silty sand.
36 11.0
37 U-1 12.8 95 Dark grey, lean clay. 11.3
38 CL 11.6
39 11.9
40
U-2 12.5 63 Dark grey, sandy lean clay. 12.2
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
SPT - 13 30 Ditto but very stiff. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 23 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 22 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 44 Ditto but hard. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 22 29.1 54 Ditto but very stiff. 19.8
66 20.1
67 CL 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Very dense, dark grey, silty sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-29
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,388.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,971.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 29
GROUND ELEVATION: 12.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 15-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 16-12-13
MEASURED AT: 0812 HOURS ON: 18-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, dark grey, silty sand. 21.6


72 21.9
73 22.3
74 22.6
SPT - 19 >50 15.6 13 Ditto but dark brown.
75 22.9
76 23.2
SM
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Hard, dark grey, sandy silty clay.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 >50 21.2 51 Ditto.
85 25.9
86 26.2
CL-ML
87 26.5
88 26.8
89 27.1
SPT - 22 >50 18.6 17 Very dense, grey, silty sand.
90 27.4
91 27.7
SM
92 28.0
93 28.3
94 Hard, grey, sandy silt with occasional gravel. 28.7
SPT - 23 >50 30.1 58
95 29.0
96 29.3
ML
97 29.6
98 29.9
99 SPT - 24 >50 Very dense, grey, silty sand. 30.2
100 30.5
101 30.8
102 31.1
103 31.4
104
SPT - 25 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-29
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,388.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,971.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 29
GROUND ELEVATION: 12.06 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 15-12-13
DEPTH OF GROUNDWATER TABLE: 9.00 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 16-12-13
MEASURED AT: 0812 HOURS ON: 18-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Rajarathna
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, grey, silty sand. 32.3


107 32.6
108 32.9
109 SPT - 26 >50 13.7 17 Ditto. 33.2
110 33.5
111 SM 33.8
112 34.1
113 34.4
114 SPT - 27 >50 Ditto. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Hard, dark grey, sandy silt. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 31.0 62 Ditto. 37.8
125 38.1
126 ML 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Very dense, dark grey, silty sand with traces of clay. 39.3
130 39.6
131 39.9
132 SPT - 31 >50 Ditto. 40.2
133 40.5
END OF BORING @ 40.43 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-29
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,421.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,989.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 30
GROUND ELEVATION: 10.66 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-12-13
DEPTH OF GROUNDWATER TABLE: 7.40 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 1700 HOURS ON: 12-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 08 Medium stiff, brown, sandy silt clay. 0.3


2 0.6
3 Ditto but stiff. 0.9
SPT - 2 15 12.8 63
4 CL-ML 1.2
5 1.5
6 SPT - 3 23 Ditto but very stiff. 1.8
7 2.1
8 Medium dense, brown, silty sand. 2.4
SPT - 4 27
9 2.7
10 3.0
11 SPT - 5 36 Ditto but dense. 3.4
12 3.7
13
SPT - 6 29 13.9 18 Ditto but medium dense. 4.0
14 SM 4.3
15 4.6
SPT - 7 47 Ditto but dense.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 38 Ditto.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 17.4 08 Very dense, brown, poorly graded sand with silt.
26 7.9
27 8.2
SP-SM
28 8.5
29 8.8
30 Hard, brown, sandy clay. 9.1
SPT - 10 45
31 9.4
32 9.8
33 10.1
34 10.4
35 SM 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-30
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,421.87 meter TYPE OF BORING: ROTARY WASH
EAST: 220,989.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 30
GROUND ELEVATION: 10.66 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-12-13
DEPTH OF GROUNDWATER TABLE: 7.40 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 17-12-13
MEASURED AT: 1700 HOURS ON: 12-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 42 21.9 46 Dense, brown, silty sand with traces of clay.
36 11.0
37 11.3
SM
38 11.6
39 11.9
40
SPT - 12 27 Ditto but medium dense. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 32 Hard, brown, sandy clay. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 44 15.6 20 Dense, brown, silty sand. 15.2
51 15.5
52 SM 15.8
53 16.2
54 16.5
55 SPT - 15 44 Ditto. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 33 22.6 51 Hard, brown, sandy silt. 18.3
61 18.6
62 ML 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Very dense, brown, poorly graded sand with silt. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-30
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,518.42 meter TYPE OF BORING: ROTARY WASH
EAST: 220,966.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 31
GROUND ELEVATION: 10.98 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 7.95 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 19-12-13
MEASURED AT: 0815 HOURS ON: 21-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 6 Medium stiff, brown, sandy silt. 0.3


2 0.6
3 Ditto but stiff. 0.9
SPT - 2 13 16.6 54
4 ML 1.2
5 1.5
6 SPT - 3 >50 Very dense, brown, silty sand. 1.8
7 2.1
8 Ditto but dense. 2.4
SPT - 4 41
9 2.7
10 3.0
11 SPT - 5 29 12.6 17 Ditto but medium dense. 3.4
SM
12 3.7
13
SPT - 6 27 Ditto. 4.0
14 4.3
15 4.6
SPT - 7 19 Ditto.
16 4.9
17 5.2
18 5.5
19 5.8
20 6.1
SPT - 8 >50 Ditto but very dense.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 37 Ditto but dense.
26 7.9
27 8.2
28 8.5
29 8.8
30 Medium dense, brown, silty clayey sand. 9.1
SPT - 10 22
31 9.4
32 9.8
33 10.1
34 10.4
35 SC-SM 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,518.42 meter TYPE OF BORING: ROTARY WASH
EAST: 220,966.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 31
GROUND ELEVATION: 10.98 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 7.95 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 19-12-13
MEASURED AT: 0815 HOURS ON: 21-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 23 18.9 42 SC-SM Medium dense, brown, silty clayey sand.
36 11.0
37 U-1 9.3 52 Brown, sandy silty clay. 11.3
38 CL-ML 11.6
39 11.9
40
SPT - 12 26 Ditto but very stiff. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 28 Ditto. 13.7
46 14.0
47 14.3
48 14.6
49 14.9
50 SPT - 14 35 Ditto but hard. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 >50 16.5 35 Very dense, brown, silty clayey sand with cemented gravel. 16.8
56 17.1
57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Very dense, brown, silty sand. 18.3
61 18.6
62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 15.2 14 Ditto. 19.8
66 20.1
67 SM 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,518.42 meter TYPE OF BORING: ROTARY WASH
EAST: 220,966.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 31
GROUND ELEVATION: 10.98 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 7.95 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 19-12-13
MEASURED AT: 0815 HOURS ON: 21-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty sand. 21.6


72 21.9
73 22.3
74 22.6
SPT - 19 >50 Very dense, brown, silty clayey sand.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 16.6 30 Ditto.
80 24.4
81 24.7
SC-SM
82 25.0
83 25.3
84 25.6
SPT - 21 >50 Very dense, brown, silty sand.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 Very dense, brown, clayey sand.
90 27.4
91 27.7
92 28.0
93 28.3
94 Ditto. 28.7
SPT - 23 >50
95 29.0
96 29.3
97 29.6
98 29.9
99 SPT - 24 >50 Ditto. 30.2
100 30.5
101 30.8
102 31.1
103 31.4
104 SPT - 25 >50 13.5 19 Very dense, brown, silty sand with occasional gravel. 31.7
SM
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,518.42 meter TYPE OF BORING: ROTARY WASH
EAST: 220,966.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 31
GROUND ELEVATION: 10.98 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-12-13
DEPTH OF GROUNDWATER TABLE: 7.95 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 19-12-13
MEASURED AT: 0815 HOURS ON: 21-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Very dense, brown, silty sand with occasional gravel. 32.3
107 SM 32.6
108 32.9
109 SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 Hard, brown, sandy silt with sand. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 >50 Ditto. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 48 27.5 72 Ditto. 37.8
125 38.1
126 ML 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto. 39.3
130 39.6
131 39.9
132
SPT - 31 >50 Very dense, brown, clayey sand. 40.2
133 40.5
END OF BORING @ 40.45 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,518.42 meter TYPE OF BORING: ROTARY WASH
EAST: 221,011.71 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 32
GROUND ELEVATION: 11.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-12-13
DEPTH OF GROUNDWATER TABLE: 7.97 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 18-12-13
MEASURED AT: 0820 HOURS ON: 12-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 SPT - 1 04 Soft, brown, silt with sand. 0.3


2 0.6
3 Ditto but stiff. 0.9
SPT - 2 12 15.6 73
4 ML 1.2
5 1.5
6 SPT - 3 24 Ditto but very stiff. 1.8
7 2.1
8 Medium dense, brown, silty sand. 2.4
SPT - 4 30
9 2.7
10 3.0
11 SPT - 5 39 Ditto but dense. 3.4
12 3.7
13
SPT - 6 13 Ditto but medium dense. 4.0
14 4.3
15 4.6
SPT - 7 16 14.5 16 Ditto.
16 4.9
17 5.2
SM
18 5.5
19 5.8
20 6.1
SPT - 8 37 Ditto but dense.
21 6.4
22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 41 Dense, brown, silty clayey sand.
26 7.9
27 8.2
28 8.5
29 U-1 6.2 39 Ditto. 8.8
SC-SM
30 Ditto but medium dense. 9.1
SPT - 10 14 18.3 39
31 9.4
32 9.8
SC-SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 4
FIGURE A-32
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,518.42 meter TYPE OF BORING: ROTARY WASH
EAST: 221,011.71 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 32
GROUND ELEVATION: 11.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-12-13
DEPTH OF GROUNDWATER TABLE: 7.97 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 18-12-13
MEASURED AT: 0820 HOURS ON: 12-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 22 Medium dense, brown, silty clayey sand.
36 11.0
37 11.3
38 11.6
39 11.9
40
SPT - 12 24 Medium dense, brown, silty sand. 12.2
41 12.5
42 12.8
43 13.1
44 13.4
45
SPT - 13 26 17.0 37 Ditto. 13.7
46 14.0
47 SM 14.3
48 14.6
49 14.9
50 SPT - 14 29 Ditto. 15.2
51 15.5
52 15.8
53 16.2
54 16.5
55 SPT - 15 31 Ditto but dense. 16.8
56 17.1
57 17.4
58 17.7
59 18.0
60 SPT - 16 42 18.7 14 Ditto but with occasional gravel. 18.3
61 18.6
62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 44 23.7 48 SM Ditto but dense. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 4
FIGURE A-32
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,518.42 meter TYPE OF BORING: ROTARY WASH
EAST: 221,011.71 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 32
GROUND ELEVATION: 11.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-12-13
DEPTH OF GROUNDWATER TABLE: 7.97 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 18-12-13
MEASURED AT: 0820 HOURS ON: 12-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, brown, silty sand. 21.6


72 SM 21.9
73 22.3
74 22.6
SPT - 19 42 Ditto.
75 22.9
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto but very dense.
80 24.4
81 24.7
82 25.0
83 25.3
84 25.6
SPT - 21 50 Ditto but dense.
85 25.9
86 26.2
87 26.5
88 26.8
89 27.1
SPT - 22 >50 19.0 13 Ditto but very dense.
90 27.4
91 27.7
SM
92 28.0
93 28.3
94 Very dense, brown, silty clayey sand with occasional gravel. 28.7
SPT - 23 >50 15.2 25
95 29.0
96 29.3
SC-SM
97 29.6
98 29.9
99 Hard, brown, sandy silty clay. 30.2
SPT - 24 >50
100 30.5
101 30.8
102 31.1
103 31.4
104
SPT - 25 >50 Ditto. 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 4
FIGURE A-32
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotechnical Investigation for Jazan Refinery & Terminal Project (EPC # 2) FILE NO: Geotechnical File No. 2013/22
LOCATION: Jazan Refinery & Terminal Project (EPC # 2), Jazan FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 1,913,518.42 meter TYPE OF BORING: ROTARY WASH
EAST: 221,011.71 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: NBH - 32
GROUND ELEVATION: 11.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-12-13
DEPTH OF GROUNDWATER TABLE: 7.97 meter CASING HAMMER WT. & DROP: N. A. DATE COMPLETED: 18-12-13
MEASURED AT: 0820 HOURS ON: 12-12-13 HAMMER WT. & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Dr. H.K.V
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

106 Hard, brown, sandy silty clay. 32.3


107 32.6
108 32.9
109
SPT - 26 >50 Ditto. 33.2
110 33.5
111 33.8
112 34.1
113 34.4
114 SPT - 27 >50 Ditto. 34.7
115 35.1
116 35.4
117 35.7
118 36.0
119 SPT - 28 42 Ditto. 36.3
120 36.6
121 36.9
122 37.2
123 37.5
124 SPT - 29 >50 25.9 69 Ditto but greyish brown. 37.8
125 38.1
126 CL-ML 38.4
127 38.7
128 39.0
129 SPT - 30 >50 Ditto. 39.3
130 39.6
131 39.9
132
SPT - 31 >50 Very dense, brown, silty sand. 40.2
133 40.5
END OF BORING @ 40.45 m.
134 40.8
135 41.1
136 41.5
137 41.8
138 42.1
139 42.4
140 42.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER REC : ROCK CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER HWR : HIGHLY WEATHERED ROCK
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 4 OF 4
FIGURE A-32
Attachment #06 Foundation Location Plan as per Approved Design of Stone Column

You might also like