You are on page 1of 5

Doc. Name: METHOD STATEMENT FOR LIQUID APPLIED BITUMINOUS WATERPROOFING Rev. No.

: 00
Doc. No.: STC CPBP-SITE-MS-0007 Date Issued: 20 MARCH, 2019

`
                 
   
   
   
   
   
   
   
  STC CAR PARK BUILDING PROJECT  
   
Riyadh, K.S.A.
   
   
   
   
   
 
 
METHOD STATEMENT FOR  
 
 
 
LIQUID APPLIED BITUMINOUS  
 
 
 
WATERPROOFING  
 
   
   
   
   
   
                 

20 MARCH,
00 2019

01 METHOD
STATEMENT
02 FOR LIQUID
 
APPLIED
03 BITUMINOUS
  WATERPROOF      
ING
04

RE DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY


V. QA/QC PROJECT PROJECT
LIQUID APPLIED ENGINEER MANAGER MANAGER
20 MARCH, BITUMINOUS RNZ
Page | 1
Doc. Name: METHOD STATEMENT FOR LIQUID APPLIED BITUMINOUS WATERPROOFING Rev. No.: 00
Doc. No.: STC CPBP-SITE-MS-0007 Date Issued: 20 MARCH, 2019

TAYYAB ABDUL SYED ATHER


2019 WATERPROOFING KHALID
00 GHAFOOR ULLAH HUSSAINI
MKHTALI

Table of Content

Section No. Title Page

1.0 Table of Content 2

2.0 Purpose & Scope 3

3.0 References & Materials 3

4.0 Equipment & Tools 3

5.0 Work Procedure 3

6.0 Health & Safety 5

2. Purpose and scope


Page | 2
Doc. Name: METHOD STATEMENT FOR LIQUID APPLIED BITUMINOUS WATERPROOFING Rev. No.: 00
Doc. No.: STC CPBP-SITE-MS-0007 Date Issued: 20 MARCH, 2019

This method statement shows how is the proper way of application of liquid
applied bituminous waterproofing to blinding or PCC as specified in the
specification and approved drawing.

3. References & Materials


1. Approved Bituminous Waterproofing Material
2. Approved Shop Drawing

4. Equipment & Tools


1. Roller
2. Slow Speed Drill Machine
3. Container
4. Brush
5. PPE: Gloves, Respirator, Safety warning device, Safety shoes etc.

5. Work Procedure

5.1 Delivery and Storage


 Material shall be delivered to site by truck or any proprietary vehicle that
material shall reached on site undamaged.

 Make sure that material is sealed with labels indicating the manufacturer name,
trade mark, date of manufacture and expiry.

 Material shall be stored in a safe material storage with shade and or at the area
out of direct sunlight.

2. Surface Preparation
 Preparation and cleaning shall be made on the area by removing loose material
and using soft broom stick or the like.

 Oil, grease and paints shall be removed by using rug cloth and paint scraper
respectively.

 Cracks shall be repaired with approved repairing material.

Page | 3
Doc. Name: METHOD STATEMENT FOR LIQUID APPLIED BITUMINOUS WATERPROOFING Rev. No.: 00
Doc. No.: STC CPBP-SITE-MS-0007 Date Issued: 20 MARCH, 2019

3. Application
 Application of liquid applied bituminous waterproofing shall be carried out by
approved subcontractor or main contractor.

 Liquid applied bituminous waterproofing system shall be applied on sound,


smooth, dry clean concrete surface.

 The substrate shall be free from cracks, if any repair of crack shall then be made.

 Firstly, earth pits and pipes shall be completed before application of bituminous
waterproofing.

 Liquid applied bituminous waterproofing shall be laid with roller but extra care
would be taken to avoid splash and wastage of material.

 Liquid applied bituminous waterproofing shall be applied with 2 coats but


number of coatings shall be as per manufacturer’s recommendation.

Page | 4
Doc. Name: METHOD STATEMENT FOR LIQUID APPLIED BITUMINOUS WATERPROOFING Rev. No.: 00
Doc. No.: STC CPBP-SITE-MS-0007 Date Issued: 20 MARCH, 2019

6. Health Safety, Environment & Security

6.1 Health & Safety


 All works shall comply with the safety procedure or instruction as set out in
project safety plan and STC Safety rules and regulations.

 Basic PPE shall be worn by all staff or laborers.

 All operatives shall be inducted before entering the site.

 Tool box talk shall be conducted before the activity.

 Approved respirator shall be worn during application.