Professional Documents
Culture Documents
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
T.T
C O N S T R U C T IO N S P E C IF IC A T IO N
DESCRIPTION
FOR REVIEW
FO R
S T E E L S T R U C T U R E S –S H O P F A B R IC A T IO N
JO/EWO
10-01055
FOR REVIEW
MAR -22-13
NO. DATE
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA
MAR-22-13
DATE:
PROJECT
ENGINEER
K.YAMAZAKI
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
MAR-22-13
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
PCWBS 0000
DATE:
BY:
REVISIONCERTIFICATION
JG C C O R P O R A T IO N
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT TA B LE O F C O N TE N TS
H.S
T.T Section Title Page
1 G E N E R A L .....................................................................................................3
2 M A T E R IA L S ..................................................................................................9
3 S U B M IT T A L S .............................................................................................12
DESCRIPTION
FOR REVIEW
4 D E T A IL E D R E Q U IR E M E N T S F O R D R A W IN G S .......................................17
5 P R O D U C T H A N D L IN G ...............................................................................35
6 F A B R IC A T IO N ............................................................................................37
7 W E L D IN G ....................................................................................................40
JO/EWO
10-01055
8 S U R F A C E T R E A T M E N T ............................................................................43
MAR -22-13
DATE
9 P R O D U C T ID E N T IF IC A T IO N .....................................................................46
NO.
00A
REV
10 T E S T IN G A N D IN S P E C T IO N .....................................................................48
DISCIPLINE
ENGINEER
T.TSURUYAMA
MAR-22-13
DATE:
PROJECT
ENGINEER
K.YAMAZAKI APPENDIX-1 FABRICATION TOLERANCE ··················································· 53
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
APPENDIX-2 SCOPE OF INSPECTION ························································· 56
MAR-22-13
DATE:
CONSTRUCTION APPENDIX-3 SYMBOLS OF MEMBERS ························································ 57
AGENCY
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
1 G EN ERA L
T.T
1.1 S co p e
This specification covers technical requirements for materials, shop detailing, shop
fabrication and inspection of steel structures supporting equipment and/or piping,
DESCRIPTION
stanchions, platforms, accessories and the like, for Jazan Refinery and Terminal
FOR REVIEW
Project.
00A
REV
the Work and to whom VENDOR subcontracts any part of the Contract, whether
DISCIPLINE
ENGINEER directly or indirectly, and by an agreement, a contract, a purchase order or
T.TSURUYAMA
whatever
MAR-22-13
DATE:
PROJECT
ENGINEER
Erector – The party that is responsible for the erection of the structural and
K.YAMAZAKI
MAR-22-13 miscellaneous steel.
DATE:
CERTIFIED
H.SUZUKI
Design Drawings – Any drawings which are prepared by PURCHASER
MAR-22-13
DATE:
CONSTRUCTION
AGENCY 1.3 Q u ality A ssu ran ce
DATE:
OPERATIONS
(1) The VENDOR shall establish, implement and maintain a Quality System in
accordance with ISO 9001:2000 or equivalent. The VENDOR shall require
his Sub-VENDOR to establish and maintain a quality system in accordance
DATE:
with ISO 9001:2000 or equivalent as applicable.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
1.4 R eferen ce D o cu m en ts
H.S
The selection of material and equipment, and the design, construction,
T.T
FOR REVIEW
00A
REV
DISCIPLINE Coatings
ENGINEER
T.TSURUYAMA (e) SAES-H-102 Safety Requirements for Coating Applications
DATE:
MAR-22-13 (f) SAES-M-001 Structural Design Criteria for Non-building
PROJECT
ENGINEER
Structures
K.YAMAZAKI (g) 12-SAMSS-005 Marking of Metal Products
MAR-22-13
DATE: (h) 12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel
CERTIFIED
H.SUZUKI
(i) 12-SAMSS-008 Erection of Structural and Miscellaneous Steel
MAR-22-13 (j) Saudi Aramco Inspection & Testing Requirements
DATE:
CONSTRUCTION Form 175-120100 Steel Structures
AGENCY
Form 175-091900 Coating
DATE: (k) Saudi Aramco Forms and Data Sheets
OPERATIONS NMR-7927 Non-Material Requirements for Fabricated
Structural Steel
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Documentation
(d) S-000-1520-001 Quality Control Requirements to Vendor
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(e) S-000-1520-002 Material Certification and Traceability
H.S
Requirements
(f) S-000-1520-003 Procedure for KIZUKI System (Procedure for
T.T
FOR REVIEW
Book
Specifications.
DATE
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA Unless otherwise specified or shown the following codes and standards of
DATE:
MAR-22-13 the latest issue shall apply:
PROJECT
ENGINEER
K.YAMAZAKI ISO 9001:2000 Quality Systems
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
ISO 8501 Part 1 Preparation of Steel Substrates before
MAR-22-13 Application of Paints and Related Products
DATE:
CONSTRUCTION
AGENCY
- Visual Assessment of Surface Cleanliness-
DATE:
OPERATIONS AISC Detailing for Steel Construction 3rd Edition
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
and Bridges
(DCC) NO. _____________________
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
ASTM A6/A6M Standard Specification for General
Requirements for Rolled Structural Steel Bars,
T.T
FOR REVIEW
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA ASTM A307 Standard Specification for Carbon Steel Bolts
DATE:
MAR-22-13 and Studs, 60000 PSI Tensile Strength
PROJECT
ENGINEER
K.YAMAZAKI ASTM A325M Standard Specification for Structural Bolts, Steel,
MAR-22-13
DATE: Heat Treated, 830 Mpa Minimum Tensile
CERTIFIED
H.SUZUKI
Strength [Metric]
MAR-22-13
DATE:
CONSTRUCTION ASTM A384/A384M Standard Practice for Safeguarding Against
AGENCY
Warpage and Distortion During Hot-Dip
DATE: Galvanizing of Steel Assemblies
OPERATIONS
Coatings (Hot-Dip)
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
Alloy Steel Bolts, Screws, Washers, Nuts, and
H.S
T.T
Special Threaded Fasteners
FOR REVIEW
High Strength
NO.
00A
REV
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
T.T
AWS D1.1/D1.1M Structural Welding Code - Steel
FOR REVIEW
rolled Sections
DATE
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA BS EN 10210-1 Hot finished structural hollow sections of non-
DATE:
MAR-22-13 alloy and fine grain steels-Technical delivery
PROJECT
ENGINEER
requirements
K.YAMAZAKI
MAR-22-13
DATE: BS EN 10210-2 Hot finished structural hollow sections of non-
CERTIFIED
H.SUZUKI
alloy and fine grain steels-Tolerances,
MAR-22-13 dimensions and sectional properties
DATE:
CONSTRUCTION
AGENCY
NAAMM MBG 531 Metal Bar Grating Manual
DATE:
OPERATIONS NAAMM MBG 532 Heavy Duty Metal Bar Grating Manual
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
STF 05520 Details for Pipe Railing for Walkway
H.S
and Walking Surfaces
STF 05530 Grating Fabrication Details
T.T
FOR REVIEW
2 M A T E R IA L S
2.1 G en eral
New materials shall be used. Any materials having any loss of the effective
JO/EWO
10-01055
SURFACE TREATMENT.
NO.
00A
REV
DISCIPLINE The minimum thickness of any part of a structural shape shall be 5 mm.
ENGINEER
T.TSURUYAMA
DATE:
MAR-22-13 2.2 S tru ctu ral S teels
PROJECT
ENGINEER
K.YAMAZAKI (1) Structural steel shapes, plates, strips and bars shall comply with;
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
- BS EN 10025 Grade S355JR for Universal Columns, Universal Beams,
MAR-22-13 Structural Tees and Plates.
DATE:
CONSTRUCTION BS EN 10025 Grade S275JR for Bars, Channels and Angles.
AGENCY
If VENDOR is planning to use equivalent materials to BS EN10025 S355JR,
DATE: VENDOR shall include this with detailed reasons into their proposal, FORM-
OPERATIONS C in PURCHASER’s Requisition, Ref. “REQUISITION OF SHOP
FABRICATED STRUCTURAL STEEL”, as an alternative.
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(12-SAMSS-007 Section 4.4)
H.S
BS EN 10210-1 Grade S275J0H
Hot finished structural hollow sections of non-alloy and fine grain steels
T.T
FOR REVIEW
(5) Ordered length of the structural steel shall be decided by VENDOR with due
JO/EWO
10-01055
00A
REV
DATE:
MAR-22-13 AWS A5.1 E70 series with low hydrogen classification.
PROJECT
ENGINEER
K.YAMAZAKI AWS A5.1 E60 series may be used for tack welding only.
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI 2.4 H ig h S tren g th B o lts (including their associated nuts and washers, hereafter)
MAR-22-13
DATE:
CONSTRUCTION (1) High strength bolts shall comply with;
AGENCY
(2) One hardened washers per each assembly shall be provided, unless noted
EDSD
otherwise.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
TREATMENT.
(DCC) NO. _____________________
(4) All bolts nuts and washer shall be properly identified and marked with the
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
material grade and manufacturer’s logo. (12-SAMSS-007 Section 6.2.5.5)
H.S
Material grade is allowed to mark “M” instead of “F436M”.
T.T
(5) A minimum two (2) threads of bolts shall project outside the nut external
surface.
2.5 M ild S teel B o lts (including their associated nuts and washers, hereafter)
DESCRIPTION
FOR REVIEW
(1) Mild steel bolts shall comply with; (12-SAMSS-007 Section 4.7)
(2) One flat washer shall be provided for the standard bolt hole, unless Design
Drawings show otherwise. Two (2) flat washers per each assembly shall be
NO.
00A
REV
DATE: (4) Surface treatment shall be in accordance with Section 8 below SURFACE
CONTROL NUMBER
TREATMENT.
VERIFICATION
EDSD
(5) All bolts nuts and washer shall be properly identified and marked with the
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(6) A Minimum two (2) threads of bolts shall project outside the nut external
surface.
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
(7) All washers shall have minimum thickness of washers in accordance with
the appropriate bolt diameter values per table 2 of ASTM F436
T.T
(1) Flooring shall be grating and/or steel floor plate whichever the Design
Drawings show. Surface treatment shall be in accordance with Section 8
below SURFACE TREATMENT.
DESCRIPTION
FOR REVIEW
Welded Steel Bar Grating and Grating stair treads shall be per ASTM
A1011/A1011M, galvanized per ASTM A123 and NAAMM MBG 531 & MBG
532. Top surface of bearing bars shall be plain, unless serrated is specified.
Grating stair treads shall have abrasive or checkered plate nosing.
JO/EWO
10-01055
For details of the grating including supporting bar size and pattern, refer to
PURCHASER’s Structural Standard Drawings. All clips used to attach
MAR -22-13
Grating shall be flush with the top to eliminate tripping hazards. All clips
DATE
00A
REV
3 S U B M IT T A L S
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
VENDOR shall submit his corporate Quality Manual and Quality Plan for review to
H.S
PURCHASER. The following requirements shall be included in the VENDOR’s
manual.
T.T
FOR REVIEW
PURCHASER and COMPANY reserve the right to audit VENDOR anytime against
JO/EWO
10-01055
00A
REV
DISCIPLINE 004 “Nonconformity Control Procedure for Purchased Equipment and Materials”.
ENGINEER
T.TSURUYAMA
DATE:
MAR-22-13 3.2 P ro ced u res fo r F ab ricatio n , T estin g an d In sp ectio n
PROJECT
ENGINEER
K.YAMAZAKI The following procedure shall be submitted to PURCHASER for approval.
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
(1) Inspection and Test Plan (ITP)
MAR-22-13
DATE:
CONSTRUCTION VENDOR shall plan the inspection and testing to cover all phases of the
AGENCY
shop fabrication process including surface treatment, complying with the
DATE: requirements as set forth in S-000-1520-001 “Quality Control Requirements
OPERATIONS to Vendor”.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
submitted. Refer to Section 10.4 below.
H.S
3.3 C atalo g s
T.T
FOR REVIEW
The following shall be submitted. All tests and test records for qualification shall
DATE
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA (1) Welding Procedure Specifications
MAR-22-13
DATE:
PROJECT
ENGINEER
Welding procedure shall be qualified in accordance with AWS D1.1. All
K.YAMAZAKI welding procedure specifications for each consumable, preparation, and
MAR-22-13
DATE: changes in essential variables shall be submitted to PURCHASER for
CERTIFIED
H.SUZUKI
approval.
MAR-22-13
DATE:
CONSTRUCTION (2) Welding Procedure Qualification Test Records
AGENCY
(Only for non-pre-qualified joint welding procedure as per AWS D1.1)
DATE:
OPERATIONS Where welding procedures do not meet the requirements of “Pre-qualified
Joint Welding Procedure” (AWS D1.1) then procedure qualification records
DATE: in accordance with “Welding Procedure Qualification Test Record” (AWS
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
T.T
3.5 M aterial C ertificates
(1) Certificates verifying that materials or items used in the fabrication comply
with PURCHASER’s requirements. Certificates for each category of
material shall be submitted as follows,
00A
REV
A and Type B.
DISCIPLINE
ENGINEER
T.TSURUYAMA
Type-A: This certificate is to give typical data only and shall not be
MAR-22-13
DATE: used other than for information and guidance. It will be used where
PROJECT
ENGINEER the manufacturer or processing works states that the supplied
K.YAMAZAKI
MAR-22-13
product or item corresponds to the purchase order requirements,
DATE:
CERTIFIED based on test results taken from recent in-production testing of
H.SUZUKI products of the same materials and the same manufacturing methods.
MAR-22-13
DATE:
CONSTRUCTION
AGENCY Type-B: This certificate is an authorized manufacturers certificate. It
is a document in which the manufacturers inspector confirms that the
DATE:
product supplied corresponds to the purchase order requirements,
OPERATIONS
based on test results carried out on the actual products or items
delivered or on test specimens related to the delivery.
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
indicate the number of the purchase order, the specified material, and
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
the product or item covered by the certificate;
H.S
be complete, unambiguous and clearly legible, and signed and dated
T.T
FOR REVIEW
Where the base material is not produced by the fabricator, the data on the
base materials shall be provided on a separate certificate.
JO/EWO
10-01055
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA (1) Dimensional inspection records of the shop fabricated products including
DATE:
MAR-22-13 grating flooring
PROJECT
ENGINEER
K.YAMAZAKI (2) Visual inspection of welds (records)
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
(3) Non-destructive test records
MAR-22-13
DATE:
CONSTRUCTION (4) Visual inspection of surface preparation (records)
AGENCY
DATE:
BY:
3.8 D raw in g s an d D o cu m en ts
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(1) Erection Drawings
H.S
(2) Shop Drawings
(3) Handrail Drawings
T.T
3.9 O th er S u b m ittals
DESCRIPTION
FOR REVIEW
In connection with the work of this Section submit all other documents of
information and data as deemed necessary by PURCHASER.
4 D E T A IL E D R E Q U IR E M E N T S F O R D R A W IN G S
VENDOR shall give the following minimum requirements for Erection Drawings,
JO/EWO
10-01055
Shop Drawings, Handrail Drawings, Ladder Drawings, Floor Drawings and any
documents deemed necessary by PURCHASER.
MAR -22-13
DATE
4.1 G en eral
NO.
00A
REV
DISCIPLINE (1) All Erection Drawings, Shop Drawings, Ladder Drawings, Floor Drawings,
ENGINEER
T.TSURUYAMA Handrail Drawings and other documents shall strictly follow the Design
DATE:
MAR-22-13 Drawings and requirements of this specification.
PROJECT
ENGINEER
K.YAMAZAKI Additional splices shall not be provided at discretion of VENDOR
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
Any deviation thereof shall require the written approval of PURCHASER.
MAR-22-13
DATE:
CONSTRUCTION (2) Member identification marks shall be in accordance with Item 9.2 below.
AGENCY
DATE: All drawings produced by VENDOR shall be drawn to a scale such that all
OPERATIONS information and lettering is clearly legible especially at a reduced size of A3.
DATE: The minimum scale for Erection Drawings should be 1:50, however a scale
CONTROL NUMBER
DATE:
(3) To ensure easy reading the minimum height of letters and figures shall be
BY:
2.5 mm.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The space between lines of lettering should not be less than half the
character height (in titles closer spacing may sometimes by unavoidable
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
due to size of letters and restricted room).
H.S
(4) Fine detail shall be shown separately and suitably enlarged.
T.T
FOR REVIEW
J: 297 mm x 420 mm
K: 210 mm x 297 mm
MAR -22-13
DATE
00A
REV
DISCIPLINE Each of VENDOR’s document sets, which are the sets of Erection
ENGINEER
T.TSURUYAMA Drawings, Shop Drawings, Accessory Drawings, Floor Panel Layouts, Floor
DATE:
MAR-22-13 Panel Details, Member Summaries, Bolt Summaries, and Bolt Lists, shall
PROJECT
ENGINEER
show the PURCHASER’s document numbers in accordance with Project
K.YAMAZAKI Specification “General Specification for VENDOR’s Documentation”.
MAR-22-13
DATE: Additionally, each document set shall show the VENDOR’s own document
CERTIFIED
H.SUZUKI
numbering system. Sheet numbers shall appear on every drawing, where
MAR-22-13 an identical number is given. Every drawing set shall include a facing sheet.
DATE:
CONSTRUCTION
AGENCY
(8) Drawing numbers in the “Title Block”
DATE:
OPERATIONS In addition to those numbers specified in (7) above, the VENDOR shall
insert a further set of numbers in the ‘title block’ of each drawing as follows:
DATE:
CONTROL NUMBER
(X)-(Y)-(Z)
VERIFICATION
EDSD
Where;
DATE:
BY:
(X) = Identification code of the structure (the code should be shown on the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
P - Erection Drawings
T.T
SD - Shop Drawings
HR - Handrail Drawings
LD - Ladder Drawings
FD - Floor Drawings
MS - Member Summary
BS - Bolt Summary
DESCRIPTION
FOR REVIEW
VENDOR may print his own drawing number on drawings but this should
appear outside of the title block. PURCHASER prefer that (X), (Y) and (Z)
above are adopted as VENDOR’s own drawing number.
JO/EWO
10-01055
00A
REV
DISCIPLINE (b) Erection drawings shall reference the corresponding design drawings.
ENGINEER
T.TSURUYAMA Every steel piece on the shop drawings shall reference the appropriate
DATE:
MAR-22-13 erection drawing.
PROJECT
ENGINEER
K.YAMAZAKI (c) Erection and shop drawings shall be grouped in sets and identified
MAR-22-13
DATE: separately for each Structure.
CERTIFIED
H.SUZUKI
MAR-22-13 (d) The PURCHASER's purchase order number shall be shown on all VENDOR
DATE:
CONSTRUCTION documents include erection and shop drawings
AGENCY
4.2.1 G en eral
DATE:
CONTROL NUMBER
(1) Design Drawings provide information that is required for the detailing of the
VERIFICATION
times follow what is the essence of the Design Drawings together with
BY:
requirements herein.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(2) All appropriate details shall be shown on the Shop Drawings, Handrail
Drawings, Ladder Drawings, Floor Drawings, Erection Drawings and other
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
PURCHASER approved drawings to ensure accurate and timely execution
H.S
T.T
of the work.
(4) VENDOR shall not obtain dimensions from the Design Drawings by using a
DESCRIPTION
FOR REVIEW
(5) VENDOR shall ensure that he is familiar with all relative information
including Project Structural Standard Drawings etc. If there is doubt
regarding any aspect of the Design Drawings, VENDOR shall inform
PURCHASER, in writing, without delay, prior to preparation of VENDOR’s
Drawings, and the discrepancy shall be resolved before proceeding.
JO/EWO
10-01055
4.2.2 C o n n ectio n s
MAR -22-13
DATE
00A
REV
DISCIPLINE (1) Detail connections and joints shall follow the Design Drawings, Project
ENGINEER
T.TSURUYAMA Structural Standard Connection Details, and this specification.
MAR-22-13
DATE:
PROJECT
ENGINEER
(2) The Design Drawings normally indicate the type of “Standard Connection”
K.YAMAZAKI to be used for the size of structural member shown, however specific
MAR-22-13
DATE: connection details may be given in some cases.
CERTIFIED
H.SUZUKI
MAR-22-13 (3) Bolted Connections
DATE:
CONSTRUCTION
AGENCY
(a) Detailing, and fabrication of bolted connections shall
DATE: be in accordance with either the AISC A llo w a b le S tre ss
OPERATIONS D e sig n (ASD) or L o a d a n d R e sista n ce F a cto r D e sig n
(LRFD) method, as noted in the contract documents.
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(c) All bolts, nuts, and washers shall be properly identified and
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
marked with the material grade and manufacturer's logo if
H.S
required by respective ASTM standard. All fasteners not so
marked shall be rejected. Should any unmarked fasteners be
T.T
FOR REVIEW
(f) All bolt holes shall be standard holes with a diameter 1/16 inch
(2 mm) larger than the nominal bolt diameter, unless otherwise specified
on the design drawings or noted in the following subsections
JO/EWO
10-01055
00A
REV
DATE:
MAR-22-13 (i) A washer shall be furnished with each anchor bolt. Plate
PROJECT
ENGINEER
washer thicknesses shall be as shown on the design drawings.
K.YAMAZAKI
MAR-22-13
DATE: (j) All nuts for high-strength bolts shall be wax-dipped to reduce
CERTIFIED
H.SUZUKI
torque during installation.
MAR-22-13
DATE:
CONSTRUCTION (4) Welded Connection
AGENCY
DATE: (a) Detailing and fabrication of all welded connections shall be in accordance
OPERATIONS with AISC's Allowable Stress Design (ASD).
DATE: (b) The minimum fillet weld size is 5 mm for structural welds.
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
shall be used with the approval of the PURCASER.
H.S
(e) VENDOR shall remove all run-off bars and extension tabs.
T.T
FOR REVIEW
requiring full masking or strip masking shall be noted on the shop drawings
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA 4.2.3 H an d railin g
MAR-22-13
DATE:
PROJECT
ENGINEER
(1) On the Design Drawings, dotted lines (in plan) denote perimeters of
K.YAMAZAKI handrailing. The final arrangement of handrail posts and detailing of the
MAR-22-13
DATE: handrailing shall be prepared by VENDOR in accordance with Project
CERTIFIED
H.SUZUKI
Structural Standard Drawings.
MAR-22-13
DATE:
CONSTRUCTION (2) Where handrail posts and other steels are to be attached to fireproofed
AGENCY
beams, post-to-beam connections are to be made with extended gusset
DATE: plates as per Project Structural Standard Drawings and shall be detailed on
OPERATIONS the Shop Drawings accordingly. (This is to enable posts to be installed after
completion of fireproofing. Ref. 12-SAMSS-007,Section 6.2.9.2)
DATE:
CONTROL NUMBER
(3) Handrailing indicated as “MTO” (Mid-rail and Toe-plate only) on the Design
VERIFICATION
Drawings means the top rail and posts above the mid-rail are to be omitted.
EDSD
DATE:
means the top rail, mid-rail, and posts above the height of the toe plate shall
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
be omitted.
(DCC) NO. _____________________
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
shall be detailed in accordance with Project Structural Standard Drawings.
H.S
(6) Straight portion of top-rail, mid-rail and toe-plate shall be extended by 100mm
T.T
(7) Handrails shall be shop-assembled in the largest units suitable for handling
and shipping. (12-SAMSS-007 Section 6.1.17)
FOR REVIEW
(1) Design Drawings will indicate location of stair stringers and ladders. Further
necessary detailing shall be in accordance with Project Structural Standard.
Drawings unless otherwise shown on Design Drawings
(4) Ladder rungs and side rails shall be shop welded together. All hoops for
MAR -22-13
ladder cage shall be shop bended. Ladder cages shall be shop assembled
DATE
on ladders.
(12-SAMSS-007 Section 6.1.17)
NO.
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA 4.2.5 F lo o rin g
MAR-22-13
DATE:
PROJECT
ENGINEER
(1) Unless otherwise noted on the Design Drawings, areas enclosed by
K.YAMAZAKI handrail and/or toe plates shall be of grating flooring and/or Steel floor plate
MAR-22-13
DATE: whichever the Design Drawings show.
CERTIFIED
H.SUZUKI
MAR-22-13 (2) Grating flooring
DATE:
CONSTRUCTION
AGENCY
Panel arrangement and detailing of the grating panels shall be carried out
DATE: by VENDOR in accordance with Project Structural Standard Drawing and
OPERATIONS the following requirements.
DATE:
BY:
(b) All grating panels shall have closed ends with end banding bars
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
having the same size as bearing bars. The weight of each panel
(DCC) NO. _____________________
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(c) Every floor grating panels shall be anchored to their supports by use
H.S
of clip type fasteners at a minimum of 4 fasteners per each panel,
plus 2 fasteners for a intermediate support if any.
T.T
(e) The clear distance between grating panels shall not be greater than
13 mm. The clearance between the grating panel and a toe plate of
DESCRIPTION
FOR REVIEW
over the grating shall be split into two panels along the center line
of the hole so as to facilitate installation upon completion of piping
NO.
00A
REV
DISCIPLINE work.
ENGINEER
T.TSURUYAMA
DATE:
MAR-22-13 - Opening shall be provided with banding bars as in (b) above,
PROJECT
ENGINEER
except where stiffening ring reinforcement is used in lieu.
K.YAMAZAKI - A clearance of 25 mm shall be provided bare or fireproofed face
MAR-22-13
DATE: of members to be positioned.
CERTIFIED
H.SUZUKI
MAR-22-13 (g) Where specified on Design Drawings as “GWT” or “Grating with toe-
DATE:
CONSTRUCTION plate”, toe plates shall be provided instead of end bars closing of
AGENCY
ends of panels, or shall be added to outside of bearing bars by use of
DATE: shop welds, as appropriate.
OPERATIONS
Panel arrangement and detailing of the floor panels shall be carried out by
VERIFICATION
following requirements.
DATE:
BY:
(a) The clear distance between panels shall not be greater than 5mm.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The clearance between the checkered plate panel and a toe plate of
(DCC) NO. _____________________
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(b) Openings to permit pipe works, ducting, equipment, structural
H.S
columns, etc., to be positioned or pass through shall be designed as
follows:
T.T
FOR REVIEW
over, the panel shall be split into two panels along the center line of
the hole so as to facilitate installation upon completion of piping
work.
00A
REV
DATE:
MAR-22-13 (a) Orientation
PROJECT
ENGINEER
(b) Principal members of the structure
K.YAMAZAKI (c) Member identification marks and position for each member
MAR-22-13
DATE: (d) Top of steel elevation
CERTIFIED
H.SUZUKI
(e) Gusset plate locations for single shear connection
MAR-22-13 (f) Direction of channel, angle and CT shaped members
DATE:
CONSTRUCTION (g) Size of members
AGENCY
(h) Site welding details
DATE: (i) Bolting details (Field Bolt Lists)
OPERATIONS (j) Necessity of fireproofing
DATE: (2) Erection Drawings shall show clearly all the component parts forming the
CONTROL NUMBER
DATE:
(3) ASTM A325/A325M high-strength bolts, 3/4 inch (20 mm) in diameter, shall
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
6.2.5.3)
H.S
(4) Reproduction of Design Drawings shall not be used as Erection Drawings.
T.T
(5) All necessary information and detail in plan, in elevation, and in section,
plus Field Bolt Lists, shall be shown on one drawing sheet.
FOR REVIEW
(7) Drawings covering the erection of handrailing, ladders, and flooring shall be
kept separate from other steelwork drawings (refer to Sections 4.6, 4.7 and
JO/EWO
10-01055
4.8 below).
MAR -22-13
(a) Field Bolt Lists shall be shown on Erection Drawings and give
NO.
00A
REV
DATE: (d) For washer requirements refer to Sections 2.4 and 2.5 above.
OPERATIONS
(9) Corresponding design drawing numbers and their revision numbers shall be
DATE: shown on Erection Drawings.
CONTROL NUMBER
VERIFICATION
(10) All fabricated steel sections shall be match-marked for field assembly
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
clearly indicate its associated equipment. Each item or bundle of
H.S
T.T
walkways and platforms shall also be indicated on the erection drawings.
(1) Shop Drawings shall give complete detailed information to enable all
component parts to be fabricated for the structure(s).
FOR REVIEW
(f) Bolt holes and full connection details including gusset plates etc.
(g) Details of cuts, copes, notches and chamfers.
MAR -22-13
00A
REV
DISCIPLINE (j) Working Point (WP) to Working Point (WP) dimensions including
ENGINEER
T.TSURUYAMA inclinations and angles
DATE:
MAR-22-13 (k) Direction marks.
PROJECT
ENGINEER
(l) Surface treatment (galvanizing/painting) requirements.
K.YAMAZAKI (m) Shop Bill of Materials
MAR-22-13
DATE: (n) Shop Bolt Lists
CERTIFIED
H.SUZUKI
(o) Summary of Weight (on facing sheet)
MAR-22-13
DATE:
CONSTRUCTION (2) Workshop bolting (if any) shall be indicated on the Shop Drawings as
AGENCY
“SHOP BOLT(S)”, specifying diameter, grip, order length, grade, quantities,
DATE: tightening procedure, and information regarding cleats and/or washers.
OPERATIONS
(3) Applicable welding symbols shall be used in every case and no omission is
DATE: allowed. The size of a fillet weld shall be given together with the symbol.
CONTROL NUMBER
VERIFICATION
(4) The system of member identification shall comply with Section 9.3 below.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
(7) Handrailing, Ladders and Flooring shall be detailed separately.
Their drawings shall be prepared in accordance with Sections 4.6, 4.7 and
T.T
4.8 below.
(8) Shop drawings shall clearly show the specification and grade of steel to be
used. (Ref.12-SAMSS-007 Section 6.4.10)
(9) In the event that drawing revisions are necessary, the VENDOR shall
clearly flag on the shop drawings all changes showing the latest
DESCRIPTION
FOR REVIEW
revisions.
(1) Definition
fabricated structure, frame unit etc., and to quantify these parts in the unit
specified.
MAR -22-13
DATE
00A
REV
DISCIPLINE Drawings.
ENGINEER
T.TSURUYAMA
DATE:
MAR-22-13 (2) Principal Requirements
PROJECT
ENGINEER
K.YAMAZAKI Shop Bill of Materials shall show the following.
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
(a) Identification marks for members, component parts of members, and
MAR-22-13 all individual pieces.
DATE:
CONSTRUCTION
AGENCY
Note: The mark of component parts and all individual pieces shall be
DATE: indicated with cross-reference to the location.
OPERATIONS
(e) Unit weight (i.e., nominal weight per meter or square meter, as
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
applicable).
(DCC) NO. _____________________
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
(g) Weight of each composite member (i.e., weight of a members and its
component parts to be shipped together).
T.T
FOR REVIEW
(3) A summary of weight shall be shown on the facing sheet of Shop Drawing
listing each sheet of total weight.
(1) Handrail Drawings shall give the same information as that of Shop Drawing
DATE
specified in Section 4.4 above, and also shall give complete information to
be assembled and erected at site.
NO.
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA (2) The extent of shop fabrication and site erection shall be clearly shown on
DATE:
MAR-22-13 the Handrail Drawings.
PROJECT
ENGINEER
K.YAMAZAKI (3) Field bolts for handrailing shall be listed on Handrail Drawings in a same
MAR-22-13
DATE: manner as Section 4.3 (7) above.
CERTIFIED
H.SUZUKI
MAR-22-13 4.7 L ad d er D raw in g s
DATE:
CONSTRUCTION
AGENCY
(1) Ladder Drawings shall give the same information as that of Shop Drawings
DATE: specified in Section 4.4 above, plus complete information to enable all
OPERATIONS component parts to be assembled and erected at site.
DATE: (2) The extent of shop fabrication and site erection shall be clearly shown.
CONTROL NUMBER
VERIFICATION
4.8 F lo o r D raw in g s
EDSD
DATE:
(1) Floor Drawings for grating, Steel floor plate and stairtread arrangement
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
drawings.
(DCC) NO. _____________________
(2) A summary shall be shown on the facing sheet of the Floor Drawing listing
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
each sheet of total as follows:
H.S
- Summary of area for grating flooring
T.T
(1) Floor Drawings for grating flooring shall show the following.
DESCRIPTION
FOR REVIEW
(b) Member identification mark of the floor grating panels complying with
Section 9.3 below.
00A
REV
DATE:
MAR-22-13 (g) Clear distances or off-sets between floor grating panels and other
PROJECT
ENGINEER
structural members.
K.YAMAZAKI
MAR-22-13
DATE: (h) Stiffening rings in the vicinity of openings.
CERTIFIED
H.SUZUKI
MAR-22-13 (i) Toe plates and stiffened end plates (if any).
DATE:
CONSTRUCTION
AGENCY
(j) Approximate location and type of fasteners for anchoring of floor
DATE: grating panels.
OPERATIONS
(l) Field Bolt List for fasteners in a same manner of Section 4.3 (7)
VERIFICATION
above.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Shop Bill of Material for the grating flooring shall be shown on each drawing,
(DCC) NO. _____________________
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
T.T
Shop Bill of Material shall give:
FOR REVIEW
(1) Floor Drawings for Steel floor plate shall show the following.
(b) Member identification mark of the floor panels complying with Section
9.3 below.
JO/EWO
10-01055
00A
REV
DATE: (i) Type and size of all welds including both shop and field welding.
OPERATIONS
(j) Location and diameter of bolt holes for countersunk bolts anchoring
DATE: removable floor panels.
CONTROL NUMBER
VERIFICATION
DATE:
(l) Field Bolt List for countersunk bolts in a same manner of Section 4.3
BY:
(7) above.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(2) The extent of shop fabrication and site erection shall be clearly shown.
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(3) Shop Bill of Material
H.S
Shop Bill of Material for Steel floor plate shall be shown on each drawing,
T.T
FOR REVIEW
(1) Floor Drawings for stairtread arrangement shall show the following.
MAR -22-13
DATE
00A
REV
DISCIPLINE (b) Member identification mark of the stairtread complying with Section
ENGINEER
T.TSURUYAMA 9.3 below.
MAR-22-13
DATE:
PROJECT
ENGINEER
(c) Principal dimensions of each panel.
K.YAMAZAKI
MAR-22-13
DATE: (d) Shop Bill of Material as specified in (3) below.
CERTIFIED
H.SUZUKI
MAR-22-13 (e) Field Bolt List for fasteners in a same manner of Item 4.3 (7) above.
DATE:
CONSTRUCTION
AGENCY
(2) Stairtread arrangement shall be shown in elevation.
DATE:
OPERATIONS (3) Shop Bill of Material
DATE: Shop Bill of Material for stairtreads shall be shown on each drawing, and
CONTROL NUMBER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(d) Unit weight (kg/piece)
H.S
(e) Total quantity
(f) Total weight
T.T
4.9 M em b er S u m m ary
FOR REVIEW
00A
REV
DATE:
MAR-22-13 (d) Weight of composite member (weight of a member and its
PROJECT
ENGINEER
component parts to be shipped together).
K.YAMAZAKI Note: Component parts of a member to be shipped separately are
MAR-22-13
DATE: not to be included in the weight of a composite member, these are to
CERTIFIED
H.SUZUKI
be weighted and itemized elsewhere.
MAR-22-13
DATE:
CONSTRUCTION (e) Necessity of fireproofing
AGENCY
DATE: (3) Where there are more than one identical members having the same member
OPERATIONS identification mark, each member shall be independently listed in the summary
using one line, except that small loose pieces such as cage hoops, cage strips,
DATE: splice plates, filler plates, backing bars are allowed to be listed in one line as
CONTROL NUMBER
an identical member.
VERIFICATION
EDSD
(4) On the cover sheet, the ID code and total weight of structural steel shall be
DATE:
shown.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4.10 B o lt S u m m ary
(DCC) NO. _____________________
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
the sample format of Appendix-6.
H.S
(2) The Bolt Summary shall give the following information:
T.T
FOR REVIEW
(3) Bolts for stairtreads and fasteners for floor grating panels shall also be listed
in the summary.
(4) On the cover sheet, the ID code and total weight of the Field Bolts, Shop
Bolts and both of them shall be shown.
JO/EWO
10-01055
4.11 C O M P A N Y an d P U R C H A S E R R eview
MAR -22-13
DATE
(1) COMPANY and PURCHASER reserve the right to review and comment all
documents submitted by VENDOR.
NO.
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA (2) COMPANY and PURCHASER’s review with or without comments of
DATE:
MAR-22-13 VENDOR’s drawings or data does not relieve VENDOR from complying
PROJECT
ENGINEER
with all terms, conditions, codes and standards, and the requirements of
K.YAMAZAKI appertaining structural steel specifications for shop fabrication and site
MAR-22-13
DATE: erection.
CERTIFIED
H.SUZUKI
MAR-22-13 (3) COMPANY and PURCHASER also reserve the right to review, comment,
DATE:
CONSTRUCTION and re-approve drawings that have previously been approved with or
AGENCY
without comment etc.
DATE:
OPERATIONS (4) VENDOR shall at all times check and certify with an authorized signature
that his own drawings and data are correct. Drawings and data not so
DATE: certified or which are found at any time by PURCHASER to be incomplete
CONTROL NUMBER
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The required number and submittal date of each VENDOR’s document, such as a
(DCC) NO. _____________________
Shipping List (including total weight), a Bolt List, and a final erection and shop
drawings, shall be in accordance with Table-A of REQUISITION OF SHOP
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
FABRICATED STRUCTURAL STEEL.
H.S
T.T
5 P R O D U C T H A N D L IN G
(1) Deliver all products to the job site properly marked to identify the structure
for which it is intended. Marking shall correspond to that indicated on the
DESCRIPTION
FOR REVIEW
(c) Other necessary information for the site Erector, the company
DATE
00A
REV
DATE:
MAR-22-13 (a) All fasteners shall be delivered in small boxes or kegs by VENDOR
PROJECT
ENGINEER
and clearly marked with labels as to the requirements for fasteners of
K.YAMAZAKI this specification. In the event of a small quantities of fasteners, bags
MAR-22-13
DATE: with tags may be used.
CERTIFIED
H.SUZUKI
MAR-22-13 (b) Fasteners in one box, keg or bag shall be of identical size, length and
DATE:
CONSTRUCTION grade of material, and shall be of one identification code of the
AGENCY
structure.
DATE:
OPERATIONS (c) If requested bolts, nuts and washers shall be matched and
assembled in one set by VENDOR before delivery bodes, kegs or
DATE: bags.
CONTROL NUMBER
VERIFICATION
(d) Loose pieces may be handled in a same manner for fasteners above.
EDSD
DATE:
the job site in good condition. All material and documentation will be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
that all items included in the Bill of Materials have been supplied,
to assure that all documentation has been received, and to check
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
for any damage.
H.S
T.T
(5) All materials designated for the care, custody and control of
the Erector shall be received, unloaded, stored, and otherwise
handled in a manner that will prevent distortion, deterioration, or damage.
FOR REVIEW
5.3 H an d lin g an d S h ip p in g
JO/EWO
10-01055
00A
REV
DATE:
MAR-22-13 (2) All bolts, washers and nuts shall be packaged and delivered
PROJECT
ENGINEER
in rigid, weatherproof containers. Cardboard containers are
K.YAMAZAKI not acceptable.
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
(3) Railcars and/or trucks shall be loaded and cribbed so that
MAR-22-13 they can be readily unloaded by others. Load in such a
DATE:
CONSTRUCTION manner that continuous drainage will occur.
AGENCY
DATE: (4) The VENDOR shall ensure that all steel and its coatings are
OPERATIONS protected from any damage caused by handling, storage or
shipping prior to receipt by the PURCHASR.
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(6) The bottom of base plates shall be clean and free of any rust
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
or corrosion.
H.S
T.T
6 F A B R IC A T IO N
6.1 G en eral
FOR REVIEW
structures.
(1) All fabrication shall be in accordance with the AISC Code of Standard
Practice for Steel Buildings and Bridges and either the AISC
Specification for Structural Steel Buildings.
(2) All structural steel shall be made by open hearth, basic oxygen or electric
furnace process. Bessemer steel is not acceptable.
JO/EWO
10-01055
00A
REV
(8) VENDOR, when performing shop assembly work, shall not exceed the
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
(9) All pieces shall be clearly marked with permanent identifying erection
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
mark number. Method and location of marking shall be approved by
H.S
T.T
PURCHASER.
FOR REVIEW
assembled on ladders.
(12) Joints perpendicular to the span of grating shall occur only over support
members.
.(13) Racks and Structures shall have holes in each perimeter column web
located at 1070 - 1140 mm above each intermediate level to permit
installation of perimeter safety cables
JO/EWO
10-01055
Before marking-off, steel which enters the shop for fabrication shall be checked for
conformity with the standards. Any damaged or distorted material shall be
NO.
00A
REV
DATE: (2) The use of chisels or center punches for marking on materials and those
CONTROL NUMBER
parts of the work which are prone to defects by such action is not permitted.
VERIFICATION
EDSD
6.4 B en d in g
DATE:
BY:
(1) Bending of steel shall be done by a cold process. Bending of steel by a hot
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
reduce the properties of the steel below those specified. Hot bending shall
be done in the temperature not exceed 650C.
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
(2) The minimum inside bending radius of steel plate shall be 3.0 times the
plate thickness.
T.T
6.5 C u ttin g
(1) Cut dimensions shall be decided by VENDOR with due consideration given
to allowance for finishing, shrinkage, and/or cutting losses, which may occur
during shop fabrication.
DESCRIPTION
FOR REVIEW
(2) Steel shall be cut by friction sawing, cold sawing, band sawing or
mechanically guided flame and plasma cutting.
(3) Hand flame cutting may be used only where unavoidable. However, where
required, it shall be conducted with appropriate margin for removing
notches and gouges in conformance with the specified shape and
dimensions.
JO/EWO
10-01055
(4) The cut edges of a member shall be free of gouges, notches, burrs and
MAR -22-13
other defects.
DATE
00A
REV
DISCIPLINE except angle columns shall be machined at the touching faces to the base
ENGINEER
T.TSURUYAMA plates.
MAR-22-13
DATE:
PROJECT
ENGINEER
6.6 H o les
K.YAMAZAKI
MAR-22-13
DATE: (1) All bolt holes shall be drilled or otherwise machined perpendicular to steel
CERTIFIED
H.SUZUKI
surfaces. Flame cut holes or burn-enlarged holes are not acceptable.
MAR-22-13 Burrs, fins and other defects shall be removed.
DATE:
CONSTRUCTION
AGENCY
Holes for pinned joints shall be drilled after welding and other fabrication
DATE: procedures are complete. Pins shall be machined and fitted
OPERATIONS so that forces are distributed evenly to the adjoining members.
(1) The component parts shall be assembled in such a manner that they are
EDSD
neither twisted nor otherwise damaged, and shall be so prepared that the
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(2) All tubular members shall be seal welded to prevent the access of moisture
(DCC) NO. _____________________
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(3) Temporary supports for steelwork in transit, where required, shall be
H.S
provided with bolted connections. Anchor bolt holes and field bolting holes
shall be used wherever possible for connection of temporary supports.
T.T
FOR REVIEW
7 W E L D IN G
7.1 G en eral
- this specification.
DATE
(2) Production welding shall not commence before written approval of welding
NO.
00A
REV
DATE:
MAR-22-13 (3) Production welding shall be carried out;
PROJECT
ENGINEER
K.YAMAZAKI - under controlled condition,
MAR-22-13
DATE: - in accordance with approved Welding Procedure Specification,
CERTIFIED
H.SUZUKI
- by approved welding personnel listed in Qualified Welders List.
MAR-22-13
DATE:
CONSTRUCTION 7.2 E d g e P rep aratio n
AGENCY
DATE: (1) Edge preparation of the weld groove shall be conducted by machine cutting
OPERATIONS or mechanically guided flame cutting. In flame cutting, the cut surface shall
have a smooth surface.
DATE:
CONTROL NUMBER
(2) Surfaces and edges to be welded shall be smooth, uniform, and free from
VERIFICATION
fins, tears, cracks, and other discontinuities which would adversely affect
EDSD
adjacent to the weld shall also be free from loose or thick scale, slag,
BY:
moisture, grease, rust, paint, and foreign material that invalidate the welding
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
(1) Welds shall be terminated at the end of a joint in a manner that will ensure
sound welds. Whenever necessary, this shall be done by use of extension
T.T
FOR REVIEW
(2) In so far as practicable, all welds shall be made in a sequence that will
JO/EWO
10-01055
00A
REV
DATE:
MAR-22-13 7.5 E xecu tio n o f W eld in g
PROJECT
ENGINEER
K.YAMAZAKI (1) Welding electrodes shall be properly handled at all times. Electrodes which
MAR-22-13
DATE: possess defects such as peeling of coating materials, stains, degradation,
CERTIFIED
H.SUZUKI
humidity, rust, etc., shall be discarded. Electrodes shall be preconditioned
MAR-22-13 for use in accordance with manufacturer’s recommendations.
DATE:
CONSTRUCTION PURCHASER reserves the right to reject any welding electrodes which
AGENCY
have been incorrectly stored, handled, or for other reasons are considered
DATE: no longer suitable.
OPERATIONS
(2) Orientation of the work piece shall conform to the requirements of the
DATE: approved “Welding Procedure Specifications”.
CONTROL NUMBER
VERIFICATION
(3) Back-gouging as necessary shall be made on the first layer in the groove
EDSD
root such that welding defects are removed with minimum loss of sound
DATE:
metal. The gouging shall be done by air carbon arc gouging or mechanical
BY:
chipping.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(4) At corners and edges of a fillet weld or partial penetration weld, welding shall
be made continuously around the corner without cessation of arc generation.
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
7.6 W eld C lean in g
T.T
Before welding over previously deposited metal, all slag shall be removed
and the weld and adjacent base metal shall be brushed clean. This
requirement shall apply not only to successive layers but also to successive
DESCRIPTION
FOR REVIEW
beads and the crafter area when welding is resumed after any interruption.
Slag shall be removed from all completed welds, the weld and adjacent
base metal shall be cleaned by mechanical wire brushing or other approved
method. Spatter remaining after the cleaning operations shall be removed
JO/EWO
10-01055
by chipping.
MAR -22-13
Workmanship tolerances in assembly of welded joints and the quality of the welds
NO.
00A
REV
DATE:
MAR-22-13 7.8 R ep airs
PROJECT
ENGINEER
K.YAMAZAKI (1) Before any attempt is made to straighten or correct distorted steel,
MAR-22-13
DATE: VENDOR shall submit a detailed procedure or work method to
CERTIFIED
H.SUZUKI
PURCHASER for approval. VENDOR shall demonstrate in their procedure
MAR-22-13 that the method will not reduce the properties of the steel below those
DATE:
CONSTRUCTION specified. Repairs shall not commence until written approval is given by
AGENCY
PURCHASER.
DATE:
OPERATIONS (2) Removal of weld metal or portions of the base metal may be by machining,
grinding, chipping or air carbon arc-gouging. Flame-gouging is not allowed.
DATE: Removal shall be undertaken in such a manner that the remaining weld
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(4) Additional weld metal to compensate for any deficiency in size shall be
(DCC) NO. _____________________
deposited using an electrode smaller than that used for making the original
weld, and not more than 4 mm in diameter. The surfaces shall be cleaned
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
thoroughly before welding.
H.S
(5) Overlap or excessive convexity shall be removed.
T.T
(7) For excessive weld porosity, excessive slag inclusions and incomplete
DESCRIPTION
FOR REVIEW
(8) For cracks in weld or base metal, the extent of the crack shall be
ascertained by use of acid etching, magnetic particle inspection, dye
penetration inspection, or other equally positive means approved by
PURCHASER. The crack and sound metal 50 mm beyond each end of the
crack shall be removed and the area re-welded.
JO/EWO
10-01055
00A
REV
DISCIPLINE used in conjunction with application of heat, the part to be heated for
ENGINEER
T.TSURUYAMA straightening shall be substantially free of stress and external forces.
MAR-22-13
DATE:
PROJECT
ENGINEER
8 S U R FA C E TR E A TM E N T
K.YAMAZAKI
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI 8.1 G alvan izin g
MAR-22-13
DATE:
CONSTRUCTION (1) All materials shall be galvanized, unless painting is specified in the Contract
AGENCY
Documents. Steel embedded in concrete shall be hot-dip galvanized.
DATE:
OPERATIONS (2) Galvanizing of steel shapes, plates and hardware shall be in accordance
with the following ASTM specifications:
DATE:
CONTROL NUMBER
(b) ASTM A325M Type 1 bolts and corresponding nuts and washers
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(c) ASTM A36 / ASTM A36M threaded bar or ASTM A307 bolts and
(DCC) NO. _____________________
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(d) All bolts, nuts, and washers shall meet required mechanical
H.S
T.T
properties after galvanizing.
FOR REVIEW
coatings.
00A
REV
The PURCHASER reserves the right to inspect and reject all galvanized
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
steel in accordance with the provisions of ASTM A123 and ASTM E376.
(DCC) NO. _____________________
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
(a) Any damage to galvanizing shall be repaired in accordance
with ASTM A780.
T.T
FOR REVIEW
(d) Cold repair using an organic zinc rich coating (primer in APCS-1C)
shall be permitted if the following conditions exist:
i) Total damaged area is less than 1% of the total coated area of the
JO/EWO
10-01055
(e) Hot repairs shall be made in the shop if any of the following conditions
exist:
NO.
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA i) Total damaged area is greater than 1% but less than 2%
DATE:
MAR-22-13 of the total coated area of the member being repaired
PROJECT
ENGINEER
ii) Any single repair is at least 2 in² (1,300 mm²) in area
K.YAMAZAKI iii) Any single repair is 12-inches (300 mm) long or more
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
(f) Hot repair shall be made using zinc alloy rod or powder
MAR-22-13 manufactured for the repair of galvanized steel.
DATE:
CONSTRUCTION
AGENCY
(g) Flux, heavy ash, or heavy dross inclusions shall be removed
DATE: by brushing, grinding, or filing as required.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(j) If galvanized tension control bolts are used, all bare steel
surfaces (i.e., bolt ends) shall be repair galvanized per this section.
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
T.T
8.2 P A IN T IN G an d C O A T IN G (N o t ap p licab le)
(1) Surface treatment and Coating in the workshop shall be in accordance with
SAES-H-001, and 101V. PURCHASER’s Specification No. S-000-13A0-001.
FOR REVIEW
Fixed Ladders and Cages shall be painted with the designated Safety Color in
accordance with the Project Specification.
9 P R O D U C T ID E N T IF IC A T IO N
9.1 G en eral
JO/EWO
10-01055
VENDOR shall distinctly mark all his products as specified in this section. Some
MAR -22-13
00A
REV
DISCIPLINE Match-marking of steel shall be done with suitable paint, waterproof ink or with
ENGINEER
T.TSURUYAMA pressed metal tags. Markings shall be in accordance with the Erection Drawings,
DATE:
MAR-22-13 Shop Drawings, Ladder Drawings, Floor Drawings and/or Handrail Drawings, as
PROJECT
ENGINEER
applicable.
K.YAMAZAKI
MAR-22-13
DATE: 9.2 M em b er Id en tificatio n
CERTIFIED
H.SUZUKI
MAR-22-13 (1) Marks by use of paint shall be painted with stencil, in legible fashion, with
DATE:
CONSTRUCTION letters and numerals having a minimum height of 38 mm (15 mm high
AGENCY
stamps for grating only). For painted members the marking paint materials
DATE: shall be of a mix and colour compatible with the finish/top coat paint, and
OPERATIONS application shall have just sufficient contact for readability.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The materials for tag, wire and glue shall be strong enough never to put off
(DCC) NO. _____________________
from the member surface during transportation from the fabricators factory
to the erection site. And they shall, however, be easily removal at site
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
without damage on the final coat on steel surface. VENDOR shall submit
H.S
the sample to PURCHASER for approval. PURCHASER may request that
fabricator demonstrates to stick (glue) or tie tags and remove them.
T.T
FOR REVIEW
For color, red, white, blue, green, yellow, orange, yellow-green, pink, pale-
blue, purple will be used.
These figure and color of the marking are to be specified by PURCHASER
in the design drawings.
These figure and color of the marking shall also be shown on the erection
drawings which the fabricator shall prepare for information to the Erector.
JO/EWO
10-01055
designation:
NO.
00A
REV
DATE:
MAR-22-13 Where:
PROJECT
ENGINEER
K.YAMAZAKI (a) = Identification code of the structure:
MAR-22-13
DATE: Design drawing will show the code, if not PURCHASER shall be
CERTIFIED
H.SUZUKI
consulted.
MAR-22-13
DATE:
CONSTRUCTION (b) = Shop drawing number:
AGENCY
The two or three digit numerals extracted from the drawing sheet
DATE: number of the corresponding Shop Drawing which shows a detail of
OPERATIONS the member.
Refer to Appendix-3
VERIFICATION
EDSD
(d) = The two digit numerals in meter extracted from the levels the
DATE:
member to be installed.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(2) All members shall be marked with their own individual identification marks
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
and always include (a), (b), (c), (d) and (e) of (1) above.
H.S
(5) Identical non-fireproofed minor members, splice plates, cleats, and shim
T.T
(6) Where columns are spliced they shall carry a tier suffix.
(5) “R” and “L” suffixes for opposite hand marks shall not be used.
DESCRIPTION
FOR REVIEW
(6) For ladder, (d) shall be replaced by ladder number and (e) shall be
component mark as follows,
(2) All members are to be marked “TOP” by paint, where there is a possibility
of erecting the member inverted or where the member will be fireproofed.
NO.
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA (3) All columns shall have a mark painted, “NORTH”, “SOUTH”, “EAST” or
DATE:
MAR-22-13 “WEST” as applicable.
PROJECT
ENGINEER
K.YAMAZAKI (4) Painted marks shall be applied in conformity with Section 9.2 (1) above.
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI 9.5 F asten ers fo r F ield C o n n ectio n s
MAR-22-13
DATE:
CONSTRUCTION All fasteners shall be distinctly marked with labels or tags, following the
AGENCY
requirements of Section 5.1 (3) above. The mark to be shown shall be as follows:
DATE:
OPERATIONS (1) Identification code of the structure
(2) Grade and designation of the fasteners
DATE: (3) Size and length
CONTROL NUMBER
(4) Quantity
VERIFICATION
EDSD
DATE:
BY:
10 T E S T IN G A N D IN S P E C T IO N
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(1) VENDOR shall conduct tests and/or inspections and provide all the related
documentation in accordance with the requirements specified in the
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
attached form "Inspection Requirements" and specification/code called for
H.S
T.T
on “Applicable Documents”.
FOR REVIEW
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA (5) Inspection and testing shall conform to this Specification and Saudi Aramco
DATE:
MAR-22-13 Inspection Requirements Forms 175-120100 or 175-091900 attached to the
PROJECT
ENGINEER
Purchase Order.
K.YAMAZAKI
MAR-22-13
DATE: (6) Welding procedures and individual welders shall be qualified in accordance
CERTIFIED
H.SUZUKI
with the requirements of ANSI/AWS D1.1/D1.1M or ANSI/AWS D1.3 as
MAR-22-13 appropriate. All welding procedures and welding performance qualification
DATE:
CONSTRUCTION records shall be made available to the PURCHASER's Inspector for review.
AGENCY
(8) Shop inspection may include, but not be limited to the following:
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
(9) Inspection of high-strength bolted connections shall be in accordance
H.S
T.T
with AISC Specification for Structural Joints Using ASTM A325M.
FOR REVIEW
Test certificates shall be reviewed, and correlation of material with respect to test
certificates shall be verified.
Material test reports for each heat of structural steel, each lot of high-strength and
ASTM A307 bolts shall be available for review by the PURCHASER. Material test
reports shall conform to EN 10204, Type 3.1.B.
JO/EWO
10-01055
00A
REV
DATE:
MAR-22-13 Dimensions of a structural component shall be inspected and verified as
PROJECT
ENGINEER
complying with the tolerance limits specified in Section 6.8 above. Actual
K.YAMAZAKI dimensions of a structural component shall be recorded.
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
Dimensional inspection records shall show specified dimensions, actual
MAR-22-13 dimensions, errors and specified tolerance limits to facilitate review.
DATE:
CONSTRUCTION
AGENCY
10.3 W eld in g In sp ectio n
DATE:
OPERATIONS Edge preparations and alignments of welded joints shall be inspected to ensure
they comply with the requirements of AWS D 1.1. are not exceeded.
DATE:
CONTROL NUMBER
Visual inspection of welds shall be performed to ensure that the permissible levels
VERIFICATION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
(1) For paint coatings, surface preparation shall be inspected to ensure the
requirements of Section 8 above are complied with and the result recorded.
T.T
A dry film thickness of a coat of paint shall be verified to ensure it meets the
limits as specified in Section 8 above and the results recorded.
FOR REVIEW
(3) The PURCHASER reserves the right to inspect and reject all galvanized
steel in accordance with ASTM A123 and ASTM E376.
member identification mark, direction marks, etc.,, shall be verified with respect to
DATE
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA 10.7 M o n ito rin g b y P U R C H A S E R
MAR-22-13
DATE:
PROJECT
ENGINEER
(1) PURCHASER’s scope of inspection for shop fabricated steel structures
K.YAMAZAKI shall be in accordance with Appendix-2.
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
(2) The requirements of inspection do not supplant or negate VENDOR’s
MAR-22-13 responsibilities defined in PURCHASER’s Order and applicable
DATE:
CONSTRUCTION specifications, nor as required by governing statutory regulations or codes.
AGENCY
DATE: (3) PURCHASER reserves the right to modify his inspection surveillance as he
OPERATIONS deems necessary.
DATE: (4) PURCHASER reserves the right at any time to monitor the shop fabrication
CONTROL NUMBER
(5) PURCHASER shall be notified and shall have the opportunity of witnessing
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(6) The PURCHASER has the Right to inspect all materials and workmanship,
(DCC) NO. _____________________
and shall have unrestricted entry to the shop of the VENDOR at all times
while work is being performed. The PURCHASER may reject improper,
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
inferior, defective, or unsuitable materials and workmanship. All materials
H.S
and workmanship rejected shall be repaired or replaced by the VENDOR as
directed by the PURCHASER. The PURCHASER inspector shall have
T.T
access to the vendor's facilities to see that quality elements are in place
prior to and during blasting, priming and coating operations.
DESCRIPTION
FOR REVIEW
JO/EWO
10-01055
MAR -22-13
NO. DATE
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA
MAR-22-13
DATE:
PROJECT
ENGINEER
K.YAMAZAKI
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
MAR-22-13
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
A P P E N D IX -1
H.S
F A B R IC A T IO N T O L E R A N C E
T.T
L1 L2
DESCRIPTION
(1)
FOR REVIEW
Distance from a
member end or
L1 or L2 : ± 2 mm
connection bolt hole
to gusset plate (L1,
L2)
Connection
Gusset
bolt holes
plate
Center line Bolster
JO/EWO
10-01055
(2)
Distance from a
member end or L1 or L2 : ± 2 mm
MAR -22-13
DATE
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA
MAR-22-13
l l Set bolt
DATE:
PROJECT hole H : ± 1.5 mm
ENGINEER
K.YAMAZAKI
(3)
H
L : ± 2.0 mm
DATE:
MAR-22-13 Bolster (H, L, l)
CERTIFIED
l : ± 1.0 mm
H.SUZUKI
MAR-22-13
DATE:
CONSTRUCTION
AGENCY
e1
DATE:
e2 e1 : ± D/100 and
OPERATIONS (4) max. 1
Perpendicularity of a mm
end plate to beam
DATE: D
(e1), and flatness of a e2 : max. 0.5 mm
CONTROL NUMBER
90° ss
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S (5)
Distance from the
T.T
FOR REVIEW
(6)
L : ±2 mm
Beam length (L)
L
For beams
e : L/1000 and
max. +10
(7)
mm, -0mm
Bending or deflection
e
For columns
JO/EWO
10-01055
(e)
e : L/1500 and
L max. +10
mm, -0mm
MAR -22-13
DATE
L
NO.
00A
REV
DISCIPLINE
ENGINEER
T.TSURUYAMA
MAR-22-13
e1 e1 : L/300 and
DATE:
PROJECT max. 3 mm
ENGINEER
K.YAMAZAKI
(8)
MAR-22-13
Angle of a stub for (Elevation)
DATE: beam-to-column
CERTIFIED connection (e1, e2) L
H.SUZUKI
MAR-22-13
e2 : L/300 and
DATE: max. 3 mm
CONSTRUCTION
AGENCY e2
DATE:
OPERATIONS (Plan)
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
T.T
L2 H : ± 3 mm
H2
(9)
Floor height, column
H1, H2 : ± 3
length (H1, H2, H), and
mm
H
Length of a stub (L1,
L1
H1
L2)
L1, L2 : ± 3 mm
DESCRIPTION
FOR REVIEW
e1
(10)
Center-to-center
e1, e2 : ±3 mm
e2
distance for anchor bolt
JO/EWO
Anchor
MAR -22-13
bolt hole
DATE
(11)
NO.
00A
REV
Perpendicularity of a
DISCIPLINE d
ENGINEER
base plate to column e1 : ± D/100
T.TSURUYAMA center line (e1, e2) D 90° and max. 3 mm
MAR-22-13
90°
DATE:
PROJECT e2 : ± d/100
e2
e1
ENGINEER
K.YAMAZAKI and max. 3 mm
MAR-22-13
DATE:
CERTIFIED
H.SUZUKI
(12) P1
Center-to-center
MAR-22-13
DATE: distance of bolt holes
CONSTRUCTION (P1, P2)
AGENCY
P1 : ± 1 mm
DATE:
OPERATIONS
P2 : ± 2 mm
P2
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
25 -
IN M
D A R
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
MAR -22-13 10-01055 FOR REVIEW
13
OF THIS DRAWING IS COVERED, FOR ALL
00A T.T H.S
R-20A
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
H.SUZUKI
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
K.YAMAZAKI
DISCIPLINE
CERTIFIED
MAR-22-13
T.TSURUYAMA
OPERATIONS
CONSTRUCTION
MAR-22-13
MAR-22-13
(DCC) NO. _____________________ DATE:
A p p en d ix-2
JA Z A N
S C O P E O F IN S P E C T IO N
MONITORING BY
REQUIREMENTS /
DESCRIPTION PURCHASER REMARKS
ACCEPTANCE CRITERIA
Saudi Aramco 2616-ENG (03/99)
(Note 1)
A P P E N D IX -2
1 P L A N A N D IN S P E C T IO N P R O C E D U R E
1.1 Inspection and Test Plan R Refer to Sec. 3.2
1.2 Fabrication Procedure R Refer to Sec. 3.2
1.3 NDT Personnel and Procedure R SA Form 120100/S-000-1520-001 Para. 5.3
P R O JE C T S P E C IF IC A T IO N
2 W E L D lN G Q U A L IF IC A T IO N
2.1 Welding Procedure Specifications R Refer to Sec. 3.4
4 F A B R IC A T IO N
DOC
D W G .T Y P E
4.1 Dimensional Inspection SW and R Refer to Sec. 10.2 See Note 3.
S A U D I A R A B IA
4.2 Visual Inspection of Welds SW and R Refer to Sec. 10.3 See Note 3.
4.3 Non-destructive Testing SW and R Refer to Sec. 10.4 See Note 3.
5 P A IN T IN G
J95
JO / E W O :
5.1 Surface Preparation SW and R Refer to Sec. 10.5 See Note 3.
5.2 SW and R Refer to Sec. 10.5 See Note 3.
P LA N T N O .
6 G A L V A N IZ E D C O A T IN G R Refer to Sec. 10.5
A
IN D E X
7 ID E N T IF IC A T IO N M A R K S SW Refer to Sec. 10.6 See Note 3.
10-01055-0012
S A U D I A R A B IA N O IL C O M P A N Y
D R A W IN G N O .
FW = Full witness / test
SW = Spot witness inspection/test
H = Hold point
Note 2 : Welding Procedure Qualification Test Records shall be reviewed by PURCHASER only for "non-pre-qualified Joint welding procedure" as per AWS D 1.1.
OF
60
56
S H T .N O .
Note 3 : PURCHASER shall select and niotify VlENDOR of all structural members and miscellaneous steel items that are to be subject to witness inspection.
S-000-3130-001
PURCHASER will normally inspect approx. 10% of members/items produced by VENDOR at witness inspections. If any non-conformance is
found during witnessing ,the extent of inspection may be adjusted at the discretion of PURCHASER.
00A
R E V .N O .
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
A P P E N D IX -3
H.S
S Y M B O LS O F M E M B E R S
T.T
Members/Items Symbol
(1) Columns C
DESCRIPTION
FOR REVIEW
(8) Trusses TR
JO/EWO
10-01055
(11) Crane rails for overhead traveling crane, etc. (if any) CR
(12) Bolsters supporting horizontal vessels, heat-exchangers, etc. BS
NO.
00A
REV
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IN D A
R-20A
R 13
25 - M S-000-3130-001
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
S A U D I A R A B IA N O IL C O M P A N Y
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
H.S
A P P E N D IX -4
SA M P L E F O R M A T O F
T.T
“MEMBER SUMMARY”
FOR REVIEW
(mm) (kg)
(COLUMN)
PB21A-01C-01 WH-200 6,025 405 X
PB21A-01C-02 WH-200 6,025 415 X
PB21A-02C-01 WH-200 6,025 453 X
PB21A-02C-02 WH-200 6,025 463 X
PB21A-03C-01 WH-100 3,012 65
PB21A-03C-02 WH-100 3,012 65
JO/EWO
(BEAMS)
PB21A-12B6-01 SH-250 3,809 194
NO.
00A
REV
DATE:
MAR-22-13 (BRACING)
PROJECT PB21A-21VR-01 L-65 4,098 24
ENGINEER
K.YAMAZAKI PB21A-21VR-02 L-65 4,098 24
DATE:
MAR-22-13 PB21A-21VR-03 L-65 4,098 24
CERTIFIED PB21A-21VR-04 L-65 4,098 24
H.SUZUKI
MAR-22-13
DATE: (SPLICE PLATES)
CONSTRUCTION
AGENCY
PB21A-21SP-01 PL-12 285 36
(3x12EA)
DATE: (BACKING
OPERATIONS BAR)
PB21A-33BB-01 FB-50 250 8
DATE:
(1x8EA)
TOTAL 4,853
CONTROL NUMBER
VERIFICATION
WEIGHT
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
P R O JE C T S P E C IF IC A T IO N D W G .T Y P E P LA N T N O . IN D E X D R A W IN G N O . S H T .N O . R E V .N O .
REVISION
IN D A
R-20A
R 13
25 - M S-000-3130-001
25 -
IN M
D A R
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
MAR -22-13 10-01055 FOR REVIEW
13
OF THIS DRAWING IS COVERED, FOR ALL
00A T.T H.S
R-20A
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
H.SUZUKI
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
K.YAMAZAKI
DISCIPLINE
CERTIFIED
MAR-22-13
T.TSURUYAMA
OPERATIONS
CONSTRUCTION
MAR-22-13
MAR-22-13
(DCC) NO. _____________________ DATE:
JA Z A N
Saudi Aramco 2616-ENG (03/99)
A P P E N D IX -5
P R O JE C T S P E C IF IC A T IO N
CONSTRUCTION SPECIFICATION FOR
S A U D I A R A B IA
J95
JO / E W O :
P LA N T N O .
A
IN D E X
10-01055-0012
S A U D I A R A B IA N O IL C O M P A N Y
D R A W IN G N O .
OF
60
59
S H T .N O .
S-000-3130-001
00A
R E V .N O .
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
25 -
IN M
D A R
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
MAR -22-13 10-01055 FOR REVIEW
13
OF THIS DRAWING IS COVERED, FOR ALL
00A T.T H.S
R-20A
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
H.SUZUKI
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
K.YAMAZAKI
DISCIPLINE
CERTIFIED
MAR-22-13
T.TSURUYAMA
OPERATIONS
CONSTRUCTION
MAR-22-13
MAR-22-13
(DCC) NO. _____________________ DATE:
JA Z A N
Saudi Aramco 2616-ENG (03/99)
P R O JE C T S P E C IF IC A T IO N
CONSTRUCTION SPECIFICATION FOR
S A U D I A R A B IA
J95
JO / E W O :
P LA N T N O .
A
IN D E X
10-01055-0012
S A U D I A R A B IA N O IL C O M P A N Y
D R A W IN G N O .
OF
60
60
S H T .N O .
S-000-3130-001
00A
R E V .N O .
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.