COMPANY LSTK CONTRACTOR:

Branch of Sinopec International


Saudi Arabian Oil Company
Petroleum Services Corp

Contract No# 6600044545


Project: MIP PKG 17 RAS TANURA AREA PIPELINES BI No. 10-09004-0003

Rain Aftermath Inspection Checklist


Location: Date:
SN. Inspection Items Yes No N/A Remarks
Are all the R.O.W’s/access ways in good condition?
1.
Damaged accessways shall be repaired, backfilled, and compacted before use.
Did the site supervisor evaluate the physical condition of the site after the rain to
2.
eliminate slipping hazards?
3. Are the rest shelters and welfare facilities been inspected after the rain?
Did the scaffolding supervisor inspect the scaffolding thoroughly before allowing
4.
workers to use the scaffolding platform?
5. Are the pedestrian walkways in good condition without water logging?
6. Is housekeeping conducted and materials arranged in the area?

Electrical Safety
Did the competent person inspect all the electrical panels, generators, and
7.
connections before use?
Did the competent person visually inspect the power tools and grounding cables
8.
before use?

9. Are all the electrical outlets and panel boards located in a safe area?

Excavation Safety
Did the excavation-competent person inspect the excavation before workers are
10.
allowed to enter the excavation after a change in site condition i.e., rain?
Is excavation free of water? The site supervisor shall arrange to dewater the
11.
excavation in tankers and keep it dry.
12. Is excavation free of cracks or other evidence of sidewall failure?
13. Is the access & egress safe to use without any slipping hazard?

Traffic and Equipment Safety


Are the materials, motor vehicles, cranes, and heavy equipment kept away from
14.
the edge of the deep excavation?
Are barricades and signages in place for all the excavations near the road or
15.
accessways?
Did the competent person inspect the ground stability & the position of the crane
16.
before starting lifting activities?
Site Supervisor/ Foreman Site Safety Officer
Name: Name:
Signature: Signature:

Legend: Yes: Acceptable No: Not Acceptable N/A: Not Applicable


Note:
• Areas to be checked by contractor supervisors and safety officer thoroughly to make sure all items were rectified and
safe to be used before start working.