As Built: Small Power 1Br-1B Small Power 1Br-1B'

The document outlines the electrical layout for a typical 1-bedroom unit in the Uptown Dubai Phase 1 project, detailing various socket outlets, switches, and connection units. It includes specifications for power circuits, emergency systems, and provisions for future installations. Additionally, it provides information on the review status, project stakeholders, and contact details for the involved parties.

Uploaded by

panchi.fentons
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

As Built: Small Power 1Br-1B Small Power 1Br-1B'

The document outlines the electrical layout for a typical 1-bedroom unit in the Uptown Dubai Phase 1 project, detailing various socket outlets, switches, and connection units. It includes specifications for power circuits, emergency systems, and provisions for future installations. Additionally, it provides information on the review status, project stakeholders, and contact details for the involved parties.

Uploaded by

panchi.fentons
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

REVIEW STATUS

LEGEND APPROVED APPROVED REJECTED FOR


AS NOTED INFORMATION
SYMBOL DESCRIPTION
DATE REVIEWED
13A, SINGLE SWITCHED SOCKET
OUTLET(MOUNTED AS PER ID) REVIEWED BY

2 13A, TWIN SWITCHED SOCKET OUTLET DATE REVIEWED


(MOUNTED AS PER ID)
REVIEWED BY
13A, UN-SWITCHED, UN-FUSED CONNECTION
UNIT (ADJACENT TO THE EQUIPMENT) N
Key Plan
13A, SWITCHED FUSED CONNECTION UNIT WITH FLEX OUTLET
(ADJACENT TO THE EQUIPMENT)
13A, UNSWITCHED FUSED CONNECTION UNIT WITH FLEX OUTLET
(ADJACENT TO THE EQUIPMENT)
13A, UN-SWITCHED FUSED CONNECTION FOR SHAVER
(MOUNTED AS PER ID)
13A, UN-SWITCHED FUSED CONNECTION
(MOUNTED AS PER ID)
13A, UNSWITCHED FUSED CONNECTION UNIT
(ADJACENT TO THE EQUIPMENT)

13A, SWITCHED FUSED CONNECTION UNIT


C 13A, TWIN SWITCHED SOCKET OUTLET (UPS POWER SUPPLY)
MOUNTED AT HEIGHT 1500mm FROM FFL, ADJACENT TO GPON 1BR-1B

PUSH BUTTON FOR DOOR CHIME


DOOR CHIME

EMERGENCY GAS LEAKAGE PUSH BUTTON

DISTRIBUTION BOARD (+1800mm TOP)

3X4 mm² Cu/PVC WIRES INCLUSED IN 25 ∅ UPVC CONDUIT General Notes:


CONCEALED IN SLAB / WALL FOR POWER CIRCUITS.
3X4 mm² CU/PVC WIRES INCLUSED IN 25 ∅ UPVC CONDUIT
CONCEALED IN FLOOR FOR POWER CIRCUITS.
25 Ø UPVC CONDUIT PROVISION FOR CURTAIN

JB JUNCTION BOX

DP SWITCH

DB-BR-LXX-1BR1B/B7 DB-BR-LXX-1BR1B/B7
DB-BR-LXX-1BR1B/B10 DB-BR-LXX-1BR1B/R12
FOR GAS LEAK DETECTION
DOOR CHIME
DB-BR-LXX-1BR1B/B10
DP SWITCH FOR FRIDGE
DP SWITCH FOR WATER HEATER EMERGENCY GAS ON/OFF
DB-BR-LXX-1BR1B/B12 FUSED FLEX OUTLET FOR GAS HOB PUSH BUTTON
DB-BR-LXX-1BR1B/B12
NON SWITCHED SOCKET FOR HOOD
FUSED FLEX OUTLET FOR GAS HOB
Y FUSED FLEX OUTLET FOR OVEN
DB-BR-LXX-1BR1B/B8 Y NON SWITCHED SOCKET FOR HOOD
DP SWITCH FUSED FLEX OUTLET FOR OVEN
FOR MICROWAVE
FOR WATER HEATER DB-BR-LXX-1BR1B/R8
FOR MICROWAVE
FOR MIRROR HEATER FOR MIRROR HEATER

WH WH FOR SHAVER SOCKET OUTLET


FOR SHAVER SOCKET OUTLET
FOR WASHING MACHINE FOR WASHING MACHINE
(LAUNDRY) (LAUNDRY)
EMERGENCY GAS ON/OFF FCU FCU
1BR-1B WH WATER HEATER ABOVE CEILING 1BR-1B'
PUSH BUTTON (MASTER BATH ROOM)
WH
GAS
DB-BR-LXX-1BR1B/R12 DP SWITCH FOR FRIDGE
FOR GAS LEAK DETECTION WATER HEATER ABOVE CEILING
(POWDER (POWDER GAS
DB-BR-LXX-1BR1B/Y8 ROOM) (KITCHEN) (MASTER BATH ROOM) DB-BR-LXX-1BR1B/Y8 ROOM)
1BR-1B 1BR-1B' (KITCHEN)
DB-BR-LXX-1BR1B/Y7 DP SWITCH FOR WATER HEATER DB-BR-LXX-1BR1B/Y7
DP SWITCH FOR WATER HEATER

DB-BR-LXX-1BR1B/B8
DB-BR-LXX-1BR1B/Y13
FOR GUST POWER OUTLET DOOR CHIME
DB-BR-LXX-1BR1B/R8
FOR MAKE UP POWER CENTER
DB-BR-LXX-1BR1B DW 2 DB-BR-LXX-1BR1B FCU 2
DB-BR-LXX-1BR1B/B11 FCU DB-BR-LXX-1BR1B/B11
FUTURE GRMS POWER PROVISION 2 FUTURE GRMS POWER PROVISION DB-BR-LXX-1BR1B/Y13 FOR DISHWASHER 2
100x100mm DOUBLE FOR DISHWASHER 100x100mm DOUBLE FOR MAKE UP POWER CENTER
COMPARTMENT TRUNKING COMPARTMENT TRUNKING
DB-BR-LXX-1BR1B/B9 DB-BR-LXX-1BR1B/B6 DB-BR-LXX-1BR1B/B9 FOR GUST POWER OUTLET
DB-BR-LXX-1BR1B/B6 (RING) FOR WATER LEAK (RING)
DB-BR-LXX-1BR1B/Y10 DB-BR-LXX-1BR1B/Y10
FOR WATER LEAK DETECTION SYSTEM DETECTION SYSTEM
(RING) POWER OUTLET WITH USB PORT (RING) POWER OUTLET WITH USB PORT
(MASTER BED ROOM) (MASTER BED ROOM)
DB-BR-LXX-1BR1B/B9 2 DB-BR-LXX-1BR1B/B9
(RING) 2
(RING) Load Schedules Reference:
DB-BR-LXX-1BR1B/R10 DB-BR-LXX-1BR1B/R10 REFERENCE NUMBER-REV TITLE
25 Ø UPVC CONDUIT PROVISION FOR CURTAIN DB-BR-LXX-1BR1B/R11 FOR TV 25 Ø UPVC CONDUIT DB-BR-LXX-1BR1B/R11 FOR TV
DUT-VBJ-CAL-ELE-NA-ALL-00474 As Built Load Schedule
DB-BR-LXX-1BR1B/R13 PROVISION FOR CURTAIN DB-BR-LXX-1BR1B/R13 DUT-VBJ-CAL-ELE-NA-ALL-00475 As Built Load Schedule
DB-BR-LXX-1BR1B/R7 SPARE DB-BR-LXX-1BR1B/R7 SPARE
DB-BR-LXX-1BR1B/Y9 DB-BR-LXX-1BR1B/Y9
FOR ONT, FED FROM BOH DB DB-BR-LXX-1BR1B/Y12 (LIVING / DINNING ROOM) FOR ONT, FED FROM BOH DB
1BR-1B DB-BR-LXX-1BR1B/Y12 (LIVING / DINNING ROOM)
IN THE CORE (REFER NOTE-5) 2 DB-BR-LXX-1BR1B/R9 IN THE CORE (REFER NOTE-5) 2 DB-BR-LXX-1BR1B/R9 BIM Model Reference:
1BR-1B'
UPS SOCKET FOR FUTURE GPON FED FROM BOH DB 2 DB-BR-LXX-1BR1B/Y10 UPS SOCKET FOR FUTURE GPON FED FROM BOH DB REFERENCE NUMBER-REV TITLE
IN THE CORE (REFER NOTE-5) C (RING) IN THE CORE (REFER NOTE-5) C2 DB-BR-LXX-1BR1B/Y10 DUT-DED-MOD-BIM-NA-ALL-00000 As Built Federated Model For Tower B02 to Roof
POWER OUTLET WITH USB PORT (RING) DUT-DED-MOD-BIM-BR-ALL-00001 Branded Residence (L46 to L61)

2 2 POWER OUTLET WITH USB PORT DUT-DED-MOD-BIM-BR-ALL-00002 Branded Residence (L62 to Roof)

JB JB

SPARE SPARE
AS BUILT
FOR TV FOR TV

SMALL POWER 1BR-1B SMALL POWER 1BR-1B'


SCALE: 1 : 40 SCALE: 1 : 40 00 28-11-2024 ISSUED FOR APPROVAL SK KD AJ

Rev. Date Description Drn. Ckd. Apd.

Employer:

DUBAI MULTI COMMODITIES CENTRE


Almas Tower
Jumeirah LAkes Towers
Dubai,United Arab
Emirates

Project Manager:

Turner Construction - International LLC

P.O. Box 13036, Dubai, UAE


T: +971 4 337 0990 | F: +971 4 334 8216
Gulf Towers Bldg., A2 Block, 8th Floor
Oud Metha Rd., Dubai, UAE
www.turnerconstruction.com/international

Consultant / Architect of Record:


WSP Middle East
Architectural & Engineering
Consultancy
P.O Box: 7497, Dubai U.A.E
Tel: +971 4 523 1999 | Fax: +971 4 523 1998
www.wsp.com

27th Flr. Office Suite 2703A&B


U-Bora Tower, Al Abraj St. Business Bay
Dubai,United Arab Emirates

Main Contractor:

MEP J.V - Contractor:

Six Construct Co. Ltd. P.O Box : 29384, DUBAI, uae.


P.O Box 13055 Tel : 04-8060000 Fax : 04-8833955
Tel : +971 4 3472777 Website : www.voltas.com
Fax : +971 4 3473512

Project Name:

UPTOWN DUBAI PHASE 1


Jumeriah Lake Tower, Free Zone
Dubai, United Arab Emirates

Drawing Title

TYPICAL 1BR-1B & 1BR-1B' UNIT


SMALL POWER LAYOUT

Drawn by: Checked by: Approved by:


SK KD AJ
Scale Sheet Size Sheet
1:40 A0 1 OF 1

Drawing Number Revision.


DUT-VBJ-ABT-PWR-BR-ALL-41111 00