Professional Documents
Culture Documents
SUMMARY
ACTIVITY
PRESENT
OPERATION
TRANSPORT
DELAY
INSPECTION
STORAGE
TOTAL
13
PROPOSED
SAVINGS
DESCRIPTION
QTY
TIME
DISTANCE
REMARKS
Insertion of jacklift to
Gaylord Pallete
8000
3.36
8000
45.09
Loading of Gaylord
Box*
8000
Pre-Form Materials to
Pre-Form Feeder*
8000
28.85
Machine Operation
Pre-Form Materials to
Pre-Form Elevator*
8000
0.27
Machine Operation
Pre-Form to
BlowMax10*
8000
1.61
Machine Operation
Blowing Process*
8000
2.82
Machine Operation
Plastic bottles to
Airveyor
8000
141.04
50
Machine Operation
Bottles of Flatveyor
8000
2.61
2.5
Machine Operation
10
Segregration of
Bottles*
8000
1.23
Machine Operation
11
Palletizing
8000
274.8
Machine Operation
12
Transport to Conveyor
8000
15.7
13
Sealing
8000
249
16.54
Manual Operation
Done by the assistant
operator.
Transport using jack lift
Machine Operation
2.5
Machine Operation
Machine Operation
83
4.2
OBSERVED BY:
VEJAR, PAULINE O.
SANTOS, KRISTOFFER E.
PRELIMINARY OBSERVATION
OBSERVED TIME (min.)
CYCLE
ELEMENT
DESCRIPTION
10
SUM
AVE
3.36
3.4
3.29
3.28
3.33
3.28
3.32
3.34
3.38
3.35
33.33
3.333
45.09
45
45.11
45.15
45.06
45.03
45.1
45.13
45.06
45.03
450.76
45.076
28.79
28.88
28.8
28.85
28.78
28.81
28.83
28.87
28.85
28.82
288.28
28.828
0.2
0.25
0.27
0.29
0.23
0.19
0.21
0.25
0.17
0.2
2.26
0.226
Pre-Form to BloMax10
1.7
1.61
1.59
1.68
1.63
1.6
1.61
1.57
1.63
1.6
16.22
1.622
Blowing Process
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
28.2
2.82
141.04
141.1
141
141.08
141.08
141.05
141.04
141.03
141.06
141.02
1410.5
141.05
2.61
2.63
2.56
2.83
2.56
2.77
2.64
2.89
2.71
2.54
26.74
2.674
Segregration of Bottles
1.23
1.2
1.1
1.35
1.37
1.28
1.19
1.08
1.02
1.33
12.15
1.215
196.8
201.1
203.21
202.35
198.5
203.64
205.5
201.9
197.7
197.69
2008.39
200.839
15.778
194.867
10
Palletizing
11
Transport to Conveyor
15.7
16.32
16.14
15.66
15.98
16.2
15.75
14.94
16.85
14.24
157.78
12
Sealing
189
188.69
181.41
205.03
203.75
203.97
201.16
194.02
193.28
188.36
1948.67
84
4.3
WORK SAMPLING
USEABLE NUMBER
AS SELECTED FROM
THE
RANDOM TABLE
ARRANGED
IN
TIME
NUMERICAL
ORDER
OF
OBSERVATION
26
45
38
0
4
9
15
25
16
28
32
1
8
14
17
33
34
40
16
8
2
5
26
9
30
0
1
2
4
5
8
8
9
9
14
15
16
16
17
25
26
26
28
30
32
33
34
38
40
45
6:00
6:01
6:03
6:07
6:12
6:20
6:28
6:37
6:46
7:00
7:15
7:31
7:47
8:04
8:29
8:55
9:21
9:49
10:19
10:51
11:24
11:58
12:36
1:16
2:01
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Working
Idle
Working
Working
COMPUTATION
% IDLE TIME =
=
% IDLE TIME =
100
1/25 x 100
4%
% PRODUCTIVE TIME
x 100
85
=
10/20 x 100
& Productive Time
=
96%
Determining the sample size using Statistical Method:
pq
n
=
Where:
p
=
percentage of idle
q
=
percentage of working time
n
=
no. of observation sample size.
% Idle Time = 4.00%
% Productive Time = 96%
Marginal Error
=
10
A 95% confidence level
1.96
= 10
=5
pq
n
(4) x(96)
52
n
=
15.36
n
=
15 observations
n
=
15-10
n
=
Therefore, 5 more observations are needed in order to establish
a standard time for the whole cycle of the Blowing Process.
4.4
FINAL OBSERVATION
CYCLE
ELEMENT DESCRIPTION
SUMMARY
AVE
PR
NT
AF
ST
3.63
3.4
3.39
3.59
3.33
3.38
0.85
2.87
0.01
2.90
45.09
45
45.11
45.15
45.06
45.08
0.82
36.96
0.01
37.34
28.79
28.88
28.8
28.85
28.78
28.83
0.90
25.94
0.01
26.20
2
3
0.2
0.25
0.27
0.29
0.23
0.23
0.92
0.21
0.01
0.22
Pre-Form to BloMax10
1.7
1.61
1.59
1.68
1.63
1.63
0.95
1.55
0.01
1.56
Blowing Process
2.82
2.82
2.82
2.82
2.82
2.82
0.98
2.76
0.005
2.78
141.04
141.1
141
141.08
141.08
141.05
0.95
134.00
0.01
135.35
2.61
2.63
2.56
2.83
2.56
2.66
0.90
2.40
0.01
2.42
Segregration of Bottles
1.23
1.2
1.1
1.35
1.37
1.23
0.85
1.04
0.01
1.05
196.8
201.1
203.21
202.35
198.5
200.69
0.80
160.55
0.01
162.17
10
Palletizing
11
Transport to Conveyor
15.7
16.32
16.14
15.66
15.98
15.84
0.82
12.99
0.01
13.12
12
Sealing
189
188.69
181.41
205.03
203.75
194.44
0.85
165.27
0.01
166.94
TOTAL
546.55
552.06
87
4.5