BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
A. DISMANTLING WORK
1 Job 1
1
TOTAL (A)
B. CIVIL WORKS
1 Brick Ballast
BATH Cft 1 5 7.00 0.5 17.50
BATH Cft 1 5.41 5.25 0.5 14.20
L- BATH Cft 1 10.41 5.58 0.5 29.04
KITCKEN Cft 1 9.41 6.58 0.5 30.96
TOTAL 91.70
1.1 PCC (1:4:8)
i) BATH Cft 1 5 7.00 0.5 17.50
BATH Cft 1 5.41 5.25 0.5 14.20
L- BATH Cft 1 10.41 5.58 0.5 29.04
KITCKEN Cft 1 9.41 6.58 0.5 30.96
PARKING AREA Cft 1 13 30.00 0.5 195.00
TOTAL 286.70
2 CONCRETE:
i) RCC wall/ wall foundation (1:2:4)
LOCKER AND VAULT LONG WALL Cft 2 18 13.00
0.5 234.00
LOCKER AND VAULT SHORT WALL Cft 3 9 13.00
0.5 175.50
PILLER LOCKER Cft 2 1 13.00 1 26.00
PILLER VAULT Cft 2 1 13.00 1 26.00
BEAM LOCKER AND VAULT 2 1 6.00 1 12.00
LOCKER FLOOR Cft 1 9.16 9.00 0.5 41.22
VAULT FLOOR Cft 1 9 6.50 0.5 29.25
KITCHEN SLAB Cft 1 2 6.58 0.25 3.29
DOOR DEDCATION Cft -2 4 7.00 0.5 (28.00)
TOTAL 519.26
iii) RCC beams/ lintels (1:2:4) -
KITCHEN Cft 1 4 0.50 0.5 1.00
IT ROOM Cft 1 4 0.50 0.5 1
VANTAGE POINT Cft 1 5 0.50 0.5 1.25
CASH WINDOW Cft 1 3 0.50 0.5 0.75
BATH Cft 2 3.5 0.50 0.5 1.75
GUARD ROOM Cft 1 3.5 0.50 0.5 0.875
STORE Cft 1 4 0.50 0.5 1
L-BATH Cft 1 3.5 0.50 0.5 0.875
VANTAGE POINT Cft 1 3 0.50 0.5 0.75
E-DOOR Cft 1 4 0.50 0.5 1
Cft TOTAL 9.25
3 STEEL: Kg 528.51 3.50 1,849.78
TOTAL 1,849.78
4 TERMITE PROOFING:
Page 1
BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
Sft 1 2124 TOTAL 2,124.00
5 BRICK MASONRY (9")
ATM PILLER CFT 1 0.75 0.75 13 7.31
PILLER FRONT CFT 3 4.5 1.16 13
STORE CABINET CFT 1 28 1.83 0.75 38.43
DB CABINET CFT 1 6 1.83 0.75 8.24
FRONT BM SILL CFT 1 8 1.00 0.75 6.00
MAIN DOOR ENTERACE CFT 1 3 1.00 0.75 2.25
FIX GLASS CFT 1 3 1.00 0.75 2.25
ATM CFT 1 0.75 1.00 0.75 0.56
PODIUM WALL CFT 1 24 5.00 0.75 90.00
STEP 1 CFT 1 5 1.00 3 15
STEP 2 CFT 1 5 1.00 2.5 12.5
STEP 2 CFT 1 5 1.00 2 10
EMERGENCY EXIT 1 3 1.50 2 9
EMERGENCY EXIT 1 3 1.50 1 4.5
TOTAL 198.73
BRICK MASONRY 4 -1/2''
BATH CENTER WALL SFT 1 7 13.00 91
KITCHEN BATH CENTER WALL SFT 1 6.58 13.00 85.54
KITCHEN LEFT SIDE WALL SFT 1 6 13.00 78
KITCHEN BATH DOOR WALL SFT 1 20.16 13.00 262.08
BATH DOOR DEDUCATION SFT -2 2.5 7.00 -35
KITCHEN DOOR DEDUCATION SFT -1 3 7.00 -21
L-BATH R/L WALL SFT 2 10.5 13.00 273
IT DOOR WALL SFT 1 12 13.00 156
DOOR DEDUCATION SFT 1 3 7.00 21
L-BATH DOOR WALL SFT 1 11.25 13.00 146.25
DOOR DEDUCATION SFT -1 2.5 7.00 -17.5
STORE LEFT WALL SFT 1 14 13.00 182
STORE RIGHT WALL SFT 1 5 13.00 65
STORE DOOR WALL SFT 1 7 13.00 91
DOOR DEDUCATION SFT -1 3 7.00 -21
ATM GUARD WALL SFT 1 18 13.00 234
DOOR DEDUCATION SFT -1 2.5 7.00 -17.5
ATM GUARD CENTER WALL SFT 1 5 13.00 65
MOTOR PAD 1 2 2.00 4
TOTAL 1,377.37
6 SURFACE RENDERING Sft 0
ATM PILLER CFT 2 0.75 0.75
PILLER FRONT CFT 3 10 13.00 390.00
STORE CABINET CFT 1 28 2.50 70.00
DB CABINET CFT 1 6 2.50 15.00
FRONT BM SILL CFT 1 8 3.00 24.00
MAIN DOOR ENTERACE CFT 1 3 3.00 9.00
FIX GLASS CFT 1 3 3.00 9.00
ATM CFT 1 0.75 3.00 2.25
PODIUM WALL CFT 2 24 5.00 240.00
STEP 1 CFT 1 5 1.50 7.50
STEP 2 CFT 1 5 1.50 7.50
Page 2
BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
STEP 2 CFT 1 5 1.50 7.50
EMERGENCY EXIT 1 3 2.50 7.50
EMERGENCY EXIT 1 3 2.50 7.50
-
-
BATH CENTER WALL SFT 2 7 13.00 182.00
KITCHEN BATH CENTER WALL SFT 2 6.58 13.00 171.08
KITCHEN LEFT SIDE WALL SFT 2 6 13.00 156.00
KITCHEN BATH DOOR WALL SFT 2 20.16 13.00 524.16
BATH DOOR DEDUCATION SFT -4 2.5 7.00 (70.00)
KITCHEN DOOR DEDUCATION SFT -2 3 7.00 (42.00)
L-BATH R/L WALL SFT 4 10.5 13.00 546.00
IT DOOR WALL SFT 2 12 13.00 312.00
DOOR DEDUCATION SFT 2 3 7.00 42.00
L-BATH DOOR WALL SFT 2 11.25 13.00 292.50
DOOR DEDUCATION SFT -2 2.5 7.00 (35.00)
STORE LEFT WALL SFT 2 14 13.00 364.00
STORE RIGHT WALL SFT 2 5 13.00 130.00
STORE DOOR WALL SFT 2 7 13.00 182.00
DOOR DEDUCATION SFT -2 3 7.00 (42.00)
ATM GUARD WALL SFT 2 18 13.00 468.00
DOOR DEDUCATION SFT -2 2.5 7.00 (35.00)
ATM GUARD CENTER WALL SFT 2 5 13.00 130.00
MOTOR PAD 2 2 2.00 8.00
TOTAL 4,080.49
Page 3
BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
7 P.C.C. (1:2:4) (IF REQUIRED)
Sft 1 1555 1.00 1555
-
TOTAL 1,555.00
8 PORCELAIN TILE:
LOCKER Sft 1 9.16 9.00 82.44
STORE Sft 1 13.33 4.00 53.32
Sft 1 5.25 1.50 7.875
IT ROOM Sft 1 10.33 5.00 51.65
Sft 1 4 1.50 6
BATH PASSAGE Sft 1 15.25 3.50 53.375
STORE PASSAGE Sft 1 11.25 4.75 53.4375
LOCKER FRONT Sft 1 21 18.00 378
HALL Sft 1 29 28.50 826.5
PODIUM TILE Sft 1 2.5 17.00 42.5
0
TOTAL 1,555.10
Epoxy Paint on PCC Flooring for
ii Vault room. No tiles will be fixed in sft 1 9 9.50
Strong Room. In strong Room. 85.5
TOTAL 85.50
9 CERAMICS TILES ()
BATH WALL Sft 1 23.75 5.00 118.75
BATH FLOOR Sft 1 5.25 7.50 39.375
BATH WALL Sft 1 22.5 5.00 112.5
BATH FLOOR Sft 1 7 5.00 35
L-BATH WALL Sft 1 28.5 5.00 142.5
L-BATH FLOOR Sft 1 10.33 5.58 57.6414
KITCHEN WALL Sft 1 28.5 5.00 142.5
KITCHEN FLOOR Sft 1 6.58 9.50 62.51
KITCHEN SLAB SIDE Sft 2 6.58 2.00 26.32
KITCHEN TAKER Sft 1 7 0.33 2.31
KITCHEN UDNDER SLAP WALL Sft 2 3 2.00 12
0
TOTAL 751.41
10 SKIRTING:
i) TILE SKIRTING
GROUND FLOOR RFT
RFT 1 375 375
TOTAL 375.00
11 MARBLE BOTICENA
i) BATH Sft 2 2.5 0.50 2.5
KITCHEN Sft 1 3 0.50 1.5
L-BATH Sft 1 2.5 0.50 1.25
STORE Sft 1 3 0.50 1.5
IT ROOM Sft 1 3 0.50 1.5
KITCHEN SLAP Sft 1 6.58 2.00 13.16
GUARD ROOM Sft 1 2.5 0.50 1.25
TOTAL 22.66
Page 4
BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
12 WOOD WORK
13 LAMINATED FLUSH DOORS
CASH COUNTER Sft 1 3 7.00 21
STORE ROOM Sft 1 3 7.00 21
Sft 0
TOTAL 42.00
ii) KITCHEN Sft 1 3 7.00 21
TOTAL 21.00
LAMINATED FLUSH DOOR WITH
14
LOUVERS
BATH Sft 1 2.5 7.00 17.5
2 2.5 7.00 35
TOTAL 52.50
15 FULL HEIGHT PARTITION:
COUNTER SFT 1 10 10.00 100.00
-
DOOR DEDUCTION sft -1 3 7.00 (21.00)
TOTAL 79.00
16 BULK HEAD:
Sft 1 14 6.50 91
17 TOTAL 91.00
KITCHEN CABINETS: Sft 1 6.58 2.50 16.45
TOTAL 16.45
KITCHEN CABINET Sft 1 6.58 3.00 19.74
TOTAL 19.74
18 DINING COUNTER
Sft 0
TOTAL -
19 FULL HEIGHT CABINETS:
STORE SFT 1 28.5 8.00 228
TOTAL 228.00
i Sft
20 DB & IT CABINET:
1 6.5 8.00 52
TOTAL 52.00
Page 5
BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
21 OPENING FOR VANTAGE POINT:
Nos 1 1
GLASS WORK :
22 GLASS DOOR :
Sft 1 3.25 7.00 22.75
TOTAL 22.75
23 GLASS PARTITION:
Sft 1 20 8.00 160
Sft -1 3.25 7.00 -22.75
TOTAL 137.25
24 LOW HEIGHT GLASS PARTITION
SFT 1 5 4.50 22.5
0
TOTAL 22.50
25 GLASS DOOR FOR IT ROOM:
Sft 1 3 7.00 21
Sft
TOTAL 21.00
26 FALSE CEILING:
CONCEALED GYPSUM BOARD
i)
CEILING:
BM Sft 1 6.5 9.00 58.5
COUNTER Sft 1 12.5 6.50 81.25
ATM Sft 1 4 7.00 28
TOTAL 167.75
LAMINATED GYPSUM TILE
ii)
CEILING:
BATH Sft 1 7 5.00 35
BATH Sft 1 7 5.00 35
0
L-BATH Sft 1 11 6.00 66
KITCHEN Sft 1 8 8.00 64
IT ROOM Sft 1 11 4.00 44
STORE ROOM Sft 1 13.5 5.50 74.25
STORE ROOM Sft 1 5.25 1.50 7.875
HALL Sft 1 21 18.00 378
HALL Sft 1 30 18.00 540
HALL Sft 1 8.5 10.00 85
GUARD Sft 1 6 5.00 30
LOCKER Sft 1 9 8.00 72
VAULT Sft 1 6 8.00 48
BATH PASSAGE Sft 1 15.5 3.50 54.25
STORE PASSAGE Sft 1 11.16 5.00 55.8
Sft TOTAL 1,589.18
Page 6
BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
27 VERTICAL DROP BEAM:
BM RFT 1 20 1.00 20
BATH FRONT RFT 1 3.5 1.00 3.5
STORE PASSAGE RFT 1 4.75 1.00 4.75
DB RFT 1 6 1.00 6
RFT TOTAL 34.25
28 MDF PELMETS: size 9"x6"
Rft 1 350 350
TOTAL 350.00
29 PAINT WORKS:
Sft 1 5000 1.00 5000
Sft 0
TOTAL 5,000.00
30 DOOR LOCK:
Nos 7 7
31 DOOR CLOSER:
Nos 2 2
32 DOOR STOPPER:
Nos 0 0
33 ROLL UP BLINDS:
BM SFT 1 8 10.00 80
FIX GLASS 1 4 10.00 40
120.00
SPECIAL STEEL DOOR (BANK
34
SUPPLIED)
Job 2 2
VANTAGE POINT STEEL DOOR
35
WITH WHITE LAMINATE BOARD
GUARD Sft 1 3 7.00 21
TOTAL 21.00
Page 7
BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
CASH FEADING WINDOW SFT 2 2
36 EMERGENCY EXIT DOOR :
Sft 1 3 7.00 21
TOTAL 21.00
37 MDF CLADDING:
ATM Sft 1 0.5 2.00 1
SHUTTER Sft 4 0.5 8.00 16
TOTAL 17.00
38 FIRE EXTINGUISHER JOB 0 0
SAFETY SECURITY GRILL CAGE
39 JOB 1
FOR HVAC 1
SAFET SECURITY GRILL CASGE
40 JOB 1
FOR GENSET 1
SAFET SECURITY GRILL CASGE
41 JOB 1
FOR MOTOR PUMP 1
C. EXTERNAL FAÇADE
1 FRONT GLAZING
ATM Sft 1 4.5 8.00 36.00
DOOR DEDUCTION Sft -1 3 7.00 (21.00)
FIX GLASS Sft 1 7.58 8.00 60.64
MAIN DOOR Sft 1 6.83 8.00 54.64
DOOR DEDUCTION Sft -1 5 7.00 (35.00)
-
TOTAL 95.28
2 GLASS DOOR FOR ATM CABIN
Sft 1 3 7.00 TOTAL 21.00
3 MAIN GLASS DOOR
Sft 1 5 7.00 35
TOTAL 35.00
5 GRANITE:
0
TOTAL -
6 MARBLE:
BM SFT 1 5.5 1.16 6.38
MAIN ENT SFT 1 8 1.16 9.28
ATM SFT 1 4.5 1.16 5.22
PODIUM SFT 1 24 1.00 24
STEP SFT 3 5 1.00 15
RISER SFT 4 5 0.58 11.6
Page 8
BILL OF QUANTITIES
SHAH RSUL NAGAR BRANCH
Sr
Description of item Unit NO L W H TOTAL
#
SFT 0
SFT TOTAL 71.48
7 WOODEN BEAM
SHUTTER BOX Sft 1 23.33 2.75 64.1575
TOTAL 64.16
8 WEATHER SHIELD:
Sft 1 30 25.00 750
1 70 25.00 1750
TOTAL 2,500.00
9 ROLLING SHUTTERS:
FIX GLASS Sft 1 7 11.00 77
MAIN DOOR 1 9 11.00 99
0
TOTAL 176.00
10 PCC RAMP: -
Job 1 1 1.00 1
11 MS RAMP
Job -
12 Brick blast
cft -
13 INTERLOCKING PAVERS: 1 15 30.00 450
0
TOTAL 450.00
S.S STAIR RAILING :
14
(internal+external)
Rft 1 45 TOTAL 45
15 GENSET PAD:
Job 1 - 1
Page 9