Project:
Qin
Title : Sump Pit Calculation
DH
Total Simultaneous Inflow (Qin) = 18.4 l/s
Out Flow of Pump (Qout) = 19.4 l/s
Level Between Lowest Pipe Invert &
0.1 m
Alarm Level (DH) = H
Effective Sump Depth (H) = 1.19 m
Internal Sump Cross Sectional Area (A) 4 m2
Depth to Cover Pump Suction (h1) 0.2 m
Cut-In Level of Duty Pump (h2) 0.15 m
Cut-In Level of Standby Pump (h3) 0.42 m
Difference of Alam Level & Standby Pump
0.4 m
Cut-In Level (Dh) =
1000 x 0.15 x 4
Time for Duty Pump Start =
18.4
= 32.6087 sec.
1000 x 0.15 x 4
Time for Duty Pump Stop =
1
= 600 sec.
For Max. Start/Stop Cycle Per Hour of 3600
One Pump = 32.6087 + 600
= 5.69072 & 2.84536 (for 2 Pump)
For Max. Start/Stop Cycle Per Hour is Less Than 10 Times, Therefore, It is Acceptable
Qout
High Level Alam
Dh
Standby Pump Start
h3 Duty Pump Start
h2 Pump Stop
h1
Use Equation 1000xh2xA/Qin
Use Equation 1000xh2xA/Qout-Qin