0% found this document useful (0 votes)
38 views1 page

RG-PTW E11

This document is a Permit to Work (PTW) for Royal Gardens Agricultural Contracting LLC, detailing the procedures and safety measures for a stormwater connection project. It includes sections for permit requests, hazard identification, control measures, and responsibilities of various personnel involved. The PTW ensures compliance with safety protocols and proper management of risks associated with the work site.

Uploaded by

abubakrelsaid90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views1 page

RG-PTW E11

This document is a Permit to Work (PTW) for Royal Gardens Agricultural Contracting LLC, detailing the procedures and safety measures for a stormwater connection project. It includes sections for permit requests, hazard identification, control measures, and responsibilities of various personnel involved. The PTW ensures compliance with safety protocols and proper management of risks associated with the work site.

Uploaded by

abubakrelsaid90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ROYAL GARDENS AGRICULTURAL CONTRACTING LLC

Main Stormwater Connection from the Free Zone –


Al Falah to the Mainline on E11
PERMIT TO WORK PTW # RG-FAL-

HOT WORK COLD WORK CONFINED SPACE

Section 1 PERMIT REQUEST (To be filled by the permit requestor)


Work Description:

Start Day Month Year Stop Day Month Year Daily Weekly Remarks

Area ABU DHABI AL FALAH Street X


Location
Community Plot Y
Tools & Equipment:
Ladder Mobile Crane Pumps
Hand Tools Telehandler Spanners
Power Tools Excavator Multimeters
Small Machineries Dozer Calibration Meters
Trucks JCB Cleaning Brushes
Compressor Shovel Wipers
Generator HIAB Truck
MST Equip./Oper. Certificates Requested By CP:
RA MSDS Designation:
Task Briefing /Training Ext. Permit/NOC Signature:
Drawing Date:
Section 2 HAZARDS & CONTROL MEASURES (To be filled by the Construction Manager or HSE Manager (AA)
Hazards Control Measures / Precautions PPE:
Unauthorized persons Flying objects Valid Permit or NOC Adequate ventilation Safety Helmet
PTW/certificates Lack of Oxygen Method Statement available Shoring or Sloping Hand Gloves
Inappropriate PPE Dust Risk Assessment available Start Checklist Eye Protection
Unprotected edge Contaminated soil Drawings available Fall Protection Coverall
Excavation Edge collapse Virus Pre-Task Briefing done Barriers / Protection Face Shield
Fire Heat Stress Supervision available on site Hi Vest Jacket
Fall from Height Work at Height Standard PPEs worn Safety Shoes
damaged tools Oil leakage Barricading of Hazards in place Ear Protection
Access/Egress Existing Structures Safety Signs & Signals in place Safety Harness
Mechanical Failure Toxic gases Safe Access / Egress in place Dust Mask
Suspended Load High Noise level; Gas Monitoring Full body harness
Load failure Lack of lighting Trial Pit done Leather Apron
Method Statement Risk Assessment External Permit Equip./Oper. Certificates
Attachments:
Job Safety Analysis Drawings NOC Insp. & Test Plans

Section 3 PERMIT REVIEWER


I have personally checked the work required and proposed safety control measures / precautions mentioned in Section 2 by Authorizing Authority. I have discussed this measures with
the Job Performing / Foreman.
Reviewed By: Designation: Safety Date: Sign:
Section 4 PERMIT ISSUING
I am authorizing this Permit and handed the site safe and proposing above mentioned Control Measures /Precautions to be in place during the works.
Authorizing By: Designation: CM Date: Sign:
Section 5 PERMIT RECIEVER
I will abide the condition/precaution mentioned in this permit Section 2, and ensure required measures in place prior and during work. I will conduct the pre-task briefing with the
group prior to start the work.
Received By: Designation: Date: Sign:

Section 6 PERMIT Closing


I am closing this Permit and handed the site safe and confirming the above works are completed.
Confirmed By: Designation: . Date: Sign:

Section 7 THIS PERMIT IS CANCELLED OR CLOSED OUT


The work is completed, site cleared, tool and equipment removed, and area is safe for Original works and WP is cancelled
Inspected Accepted
Incomplete Complete Name Sign Date Time
Yes No Yes No
HSE Officer
Authorizing By: Designation: Safety / PM Date: Sign:

You might also like