1
Name of work- 'Construction of a 200 seater Auditorium (greenery/ materials compliant building) at the JR RPF
Academy Lucknow.. was sanctioned and included as item no. 461 in Pink Book of 2024-25, at an anticipated
cost of Rs 4.68Cr.
S.N Department wise Cost Sanctioned Cost as per Abstract Estimate
1 Civil Engineering cost ₹ 2,20,95,000.00
2 S&T ( Telecom) cost ₹ 1,37,04,000.00
3 Elect .Engineering cost (G) ₹ 68,41,000.00
4 Stores ₹ 42,40,000.00
Total Cost 4,68,80,000.00
2
Name of work- 'Development of a Cyber Security Lab for Capacity Building for Officers equipping them with the
latest skills for addressing cyber security related issues of the travelling Railway Passenger was sanctioned and
included as item no. 461 in Pink Book of 2024-25, at an anticipated cost of Rs 4.17Cr.
S.N Department wise Cost Sanctioned Cost as per Abstract Estimate
1 Civil Engineering cost ₹ 1,31,80,000.00
2 S&T ( Telecom) cost ₹ 13,43,000.00
3 Elect .Engineering cost (G) ₹ 26,11,000.00
4 Stores ₹ 2,46,30,000.00
Total Cost 4,17,64,000.00
3
Name of work- 'Construction of a new Training Block,Administrative block,Fort waall and Asphalt Marching
track at JR RPF Academy,Lucknow.. was sanctioned and included as item no. 461 in Pink Book of 2024-25,
at an anticipated cost of Rs 25.28Cr.
S.N Department wise Cost Sanctioned Cost as per Abstract Estimate
1 Civil Engineering cost ₹ 18,48,00,000.00
2 S&T ( Telecom) cost ₹ 1,32,00,000.00
3 Elect .Engineering cost (G) ₹ 2,59,97,000.00
4 Stores ₹ 2,88,50,000.00
Total Cost 25,28,47,000.00
4
Name of work- 'Upgradation/Modemization of existing infrastructure like off officers hostels,Barracks,Armoury &
short firing range etc, was sanctioned and included as item no. 461 in Pink Book of 2024-25, at an anticipated
cost of Rs 17.20Cr.
S.N Department wise Cost Sanctioned Cost as per Abstract Estimate
1 Civil Engineering cost ₹ 11,14,91,000.00
2 S&T ( Telecom) cost ₹ 38,88,000.00
3 Elect .Engineering cost (G) ₹ 2,66,24,000.00
4 Stores ₹ 3,00,00,000.00
Total Cost 17,20,03,000.00
Note-
1.Please prepare sub estimate of above subject with in sactioned limit accordingly.
2.It is, therefore, requested to submit the detailed sub estimate of your portion of work so that consolidated detailed
estimate may be submitted in Finance for vetting.
3.The Abstract estimate of the same is also uploaded herewith for information and preparation of Detailed
Estimate
4.It is requested to take up the matter on top priority send the sub estimate of the involved work at earliest