The document outlines four sanctioned construction projects at the JR RPF Academy in Lucknow, included in the Pink Book of 2024-25, with total anticipated costs of Rs 4.68Cr, Rs 4.17Cr, Rs 25.28Cr, and Rs 17.20Cr respectively. Each project includes detailed cost breakdowns by department, emphasizing the need for sub-estimates to be prepared within sanctioned limits. The document requests prompt submission of these estimates for consolidated financial vetting.

Uploaded by

Ashish Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views1 page

Note

The document outlines four sanctioned construction projects at the JR RPF Academy in Lucknow, included in the Pink Book of 2024-25, with total anticipated costs of Rs 4.68Cr, Rs 4.17Cr, Rs 25.28Cr, and Rs 17.20Cr respectively. Each project includes detailed cost breakdowns by department, emphasizing the need for sub-estimates to be prepared within sanctioned limits. The document requests prompt submission of these estimates for consolidated financial vetting.

Uploaded by

Ashish Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

1

Name of work- 'Construction of a 200 seater Auditorium (greenery/ materials compliant building) at the JR RPF
Academy Lucknow.. was sanctioned and included as item no. 461 in Pink Book of 2024-25, at an anticipated
cost of Rs 4.68Cr.
S.N Department wise Cost Sanctioned Cost as per Abstract Estimate
1 Civil Engineering cost ₹ 2,20,95,000.00
2 S&T ( Telecom) cost ₹ 1,37,04,000.00
3 Elect .Engineering cost (G) ₹ 68,41,000.00
4 Stores ₹ 42,40,000.00
Total Cost 4,68,80,000.00
2
Name of work- 'Development of a Cyber Security Lab for Capacity Building for Officers equipping them with the
latest skills for addressing cyber security related issues of the travelling Railway Passenger was sanctioned and
included as item no. 461 in Pink Book of 2024-25, at an anticipated cost of Rs 4.17Cr.
S.N Department wise Cost Sanctioned Cost as per Abstract Estimate
1 Civil Engineering cost ₹ 1,31,80,000.00
2 S&T ( Telecom) cost ₹ 13,43,000.00
3 Elect .Engineering cost (G) ₹ 26,11,000.00
4 Stores ₹ 2,46,30,000.00
Total Cost 4,17,64,000.00
3
Name of work- 'Construction of a new Training Block,Administrative block,Fort waall and Asphalt Marching
track at JR RPF Academy,Lucknow.. was sanctioned and included as item no. 461 in Pink Book of 2024-25,
at an anticipated cost of Rs 25.28Cr.
S.N Department wise Cost Sanctioned Cost as per Abstract Estimate

1 Civil Engineering cost ₹ 18,48,00,000.00


2 S&T ( Telecom) cost ₹ 1,32,00,000.00
3 Elect .Engineering cost (G) ₹ 2,59,97,000.00
4 Stores ₹ 2,88,50,000.00
Total Cost 25,28,47,000.00
4
Name of work- 'Upgradation/Modemization of existing infrastructure like off officers hostels,Barracks,Armoury &
short firing range etc, was sanctioned and included as item no. 461 in Pink Book of 2024-25, at an anticipated
cost of Rs 17.20Cr.
S.N Department wise Cost Sanctioned Cost as per Abstract Estimate
1 Civil Engineering cost ₹ 11,14,91,000.00
2 S&T ( Telecom) cost ₹ 38,88,000.00
3 Elect .Engineering cost (G) ₹ 2,66,24,000.00
4 Stores ₹ 3,00,00,000.00
Total Cost 17,20,03,000.00
Note-
1.Please prepare sub estimate of above subject with in sactioned limit accordingly.
2.It is, therefore, requested to submit the detailed sub estimate of your portion of work so that consolidated detailed
estimate may be submitted in Finance for vetting.
3.The Abstract estimate of the same is also uploaded herewith for information and preparation of Detailed
Estimate
4.It is requested to take up the matter on top priority send the sub estimate of the involved work at earliest