CHOOSE THE CORRECT ANSWER v No.

Question 1 Authority to proceed is given to -------------- to enter the block section with his train a) Guard b) Driver c) SM d) none 2 Neales ball token Block Instrument is used for a) Double line section b) Single line section c) Automatic territory d) none of above 3 The POH of NBT Block instrument is a) 10 years b) 7 years c) 12 years d) 5 years 4 In double line Block working in Non- RE area we require a) 2 Lines only b) 3 Lines only c) 2 Line + separate Earth return d) 3 Lines + separate Earth return 5 The Resistance of door lock coil is _________ in SGE DLBI a) 40 Ohms b) 50 Ohms c) 80 Ohms d) 160 Ohms 6 Adequate distance means a) 200 Mts b) 180 Mts c) Distance given to ensure safety d) Breaking distance + sighting distance 7 TGT lock coils picks up _________ no s of times while turning the handle to TG a) 1 b) 2 c) 3 d) 4 8 Tokens are classified into _____________________ no s of types a) 3 b) 4 c) 5 d) 6 9 The POH of DLBI is a) 7 year b) 12 years c) 10 years d) when SSE found necessary 10 Bell spring Assembly has _________ no of terminals in DLBI to use in Non R.E AC a) 1 b) 2 c) 3 d) 4 11 When Bell plunger pressed _________ no of springs will make in DLBI SGE type Non R.E AC a) 1 b) 2 c) 3 d) 4 12 When handle is turned to TOL the no of pairs of contacts that will make in DLBI byculla make a) 1 b) 2 c) 3 d) 4 13 TOL contact in DLBI will make in a) only in TOL Position b)TOL &line clear c) Line closed d) Only in Line clear ( ( ) ) Answer b) Driver

( ( (

) ) )

b) Single line section a) 10 years d) 3 Lines + separate Earth return b) 50 Ohms

c) Distance given to ensure safety b) 2

c) 5

( (

) )

a) 7 year d) 4

c) 3

c) 3

a) only in TOL Position

14

15 16 17 18 19

20

Minimum no of Track circuit required for block release circuit a) 1 b) 2 c) 3 d) 4 Voltage required to pick up PR relay is ________ a)1.7 v b)2 v c)2.2 v d)1.5 v Resistance of TCF/TGT relay is ____ ohms a)150ohms b)148 ohms c)200 ohms d)136 oms Voltage required to pick up TCF/TGT relay is a)4.5 v b)5.5 v c)3.5 v d)6 v Current required to pick up TCF/TGT relay is a) 160ma b) 120ma c) 110ma d)100ma No: of tokens that can be extracted at a time in NBT B/I a) 4 b) 3 c) 2 d)1 In a block station the minimum no: of block Instruments provided are a) 4 b) 3 c) 2 d)1

b) 2

( ( ( ( (

) ) ) ) ) b)148 ohms a)4.5 v a) 160ma d)1

c) 2

MATCH THE FOLLOWING 1. LCPR 2. TCF & TGT Coil Resistance 3. PR Relay 4. DLBI Line curent 5. In coming trains 6. Neales Ball Token Instrument 7. SR1 & SR2 8. Rest Contact 9. Butter fly type contact 10.POH of neales token inst 11. POH of DLBI Podanur make (a) DLBI (b) 148 Ohms (c) 77 Ohms (d) 25mA (e) Bottom Indicator (f) Spigot (g) LSS Clearance circuit (h) Neales Token Instrument (j) DLBI SGE make (j) 10 years (k) 7 years ( ( ( ( ( ( ( ( ( ( ( ) ) ) ) ) ) ) ) ) ) )

No.

Question

Answer

1 2

Adequate Distance is the distance given as120mts to ensure safety (True/False) Block back is a message given to the driver to enter into block section (True/False) The wring of Normal & Reverse polarity instrument are Identical in Neals Token Instrument (True/False) Double line Block instrument should have 2 indicator only (True/False) Double line Block instrument can be used for single line working (True/False) PR in NBT does not require P.O.H (True/False) In DLBI all the Block operation are done at sending end. (True/False) Authority to proceed is given to the Guard of a special train (True/False) Premature TOL is done in S/L Token Block Instrument (True/False) Rest contact Breaks isolates PR with line Circuit (True/False) Rest contact is dynamic is nature (True/False) The object of providing Block Instrument is to prevent more than one train in a block section at a time (True/False) Absolute Block working is to maintain space internal between two trains (True/False) The Driver is a Absolute Block working should not enter into the Block section without proper Authority (True/False) Token is handed over to the driver of a train as an authority to proceed (True/False) At a time max no of tokens extracted from a pair of Block instruments are 2 No s (True/False) To connect pair of NBT instrument we require 2 lines wire and earth return (True/False) On a single line where trains work under absolute Block system every train in its progress from one block station to next shall be signalled over the block instruments (True/False)

( (

) )

False False

False

4 5 6 7 8 9 10 11 12 13 14 15 16 17

( ( ( ( ( ( ( ( ( ( ( ( ( (

) ) ) ) ) ) ) ) ) ) ) ) ) )

True False False False False False True False True True True True False False

18

True

19 20 21 22 23

Inserting the token into the block instrument indicate that the train is in his custody/train reached safely by the S.M (True/False) I R S Drg No for Neals ball token instruments is SA 20701/M (True/False) Solid balls are used as tokens in NBT Instrument (True/False) The groove cut in Balls of NBT Instrument is to easy carry (True/False) Different hole configurations are provided to distinguish the token belonging to block instruments of different block section (True/False) SMs key when out in NBT will mechanically lock the bottom (operating) handle and Top Handle only (True/False) Top handle can only be locked in its position at 85 from the vertical (True/False) SMs key removed no incoming or out going bell beats (True/False) We can turn the top handle upto a maximum of 180 when token is not inserted (True/False) Top indicator is having only one indication i.e green (True/False) LSS control key can extract only in TGT Position of B/H (True/False) When tokens are available in the instrument it is possible to turn the block handle to TCF (True/False) When tokens are available in the instrument it is possible to turn the block handle to TGT (True/False) Safety catch allows declutching of commentator shaft from spring clutch shaft while turning the handle from line close to TCF/TGT (True/False) Lubrication is done with Axle oil medium grade to IS: 1628 (True/False) Checking the polarity of NBT instruments is done by not less then superior grade (JE) (True/False) Adequate Distance is the distance sufficient to ensure safety (True/False) 6 types no: of types of block workings are existing in Indian railways (True/False) Resistance of PR relay is 77 ohms (True/False)

( ( ( ( (

) ) ) ) )

True True False False True

24 25 26 27 28 29 30 31 32

( ( ( ( ( ( ( ( (

) ) ) ) ) ) ) ) )

True True False False False True True False False

33

True

34 35 36 37

( ( ( (

) ) ) )

True True True True

38 39 40 41 42 43 44

Resistance of Galvo relay is 150 ohms (True/False) Current required to pick up Galvo relay is 20 ma (True/False) Capacity of Tablet token block instrument is 36 no: (True/False) commutater has three positions ( Normal,Reverse & center ) (True/False) In normal position of commutater if plunger is pressed 1 &3 commutater spring contacts make (True/False) For shunting in the Block section Block handle should be kept in TOL condition where shunting is in progress (True/False) Block handle cannot be turned to TGT when there is no tokens in the Block instrument (True/False)

( ( ( ( ( ( (

) ) ) ) ) ) )

True True False False False False True