0% found this document useful (0 votes)
51 views3 pages

Drain & Power Duct Sub-Con Rates

Uploaded by

mani6309616795
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views3 pages

Drain & Power Duct Sub-Con Rates

Uploaded by

mani6309616795
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Drain and Power Duct Works Labour rates with Shuttering for ADCL Projects

Drain

Item
Item Description Unit Rate Remarks
No.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50
1 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical
Cum 85
Specification 305 / 304 MORTH 0-3m. If not suitable, soil to be dumped in 1km Lead.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50
2 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical
Cum 100
Specification 305 / 304 MORTH 3-6m. If not suitable, soil to be dumped in 1km Lead.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom
3 and backfilling in trenches with excavated suitable material as per Technical Specification 305 / 304 MORTH > 6m. If not suitable,
Cum 115
soil to be dumped in 1km Lead.
Vibrated cement concrete M 15 Grade Concrete as levelling coarse using crushed stone aggregate and fine aggregate,
mechanically mixed and compacted by vibration including curing for 14 days including cost, and conveyance of all
materials to site and all labour charges ,centring, machine mixing, laying in position, Compacting , Vibrating and curing
4 including all other incidental and all other operational charges of T&P required etc., complete as per approved drawings
Cum 700
and as directed during execution for finished item as per MORTH technical specifications. Minimum quantity of 275 kg
cement to be used per cum of concrete.
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate and fine aggregate
conforming to table 1000-2) mechanically mixed , compacted by vibration including curing for 14 days including cost,
conveyance of all materials to site and labour charges, laying, vibrating, curing etc., including other incidental hire and
5 operational charges of all T&P etc., complete as per approved drawings for finished item per MORTH technical
Cum
specifications and as directed by the Engineer-in-Charge) Drain Raft concrete M-30 grade including form work.
Minimum quantity of 407 kg cement to be used per cum of concrete.

i. Vent Size - 0.6mx0.6m - 1.5mx1.5m for Drain Cum 825

ii. Vent Size - 1.51mx1.51m - 2.00mx2.00m for Drain Cum 725

iii. Vent Size - 2.01mx2.01m - 2.50mx2.50m for Drain Cum 625

iv. Vent Size - Above - 2.51mx2.51m for Drain Cum 550


Vibrated reinforced cement concrete M 30 grade using stone aggregate and fine aggregate, mechanically mixed ,
compacted by vibration including curing for 14 days including cost, conveyance of all materials to site and labour
charges, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete
6 as per approved drawings and as directed during execution for finished item per MORTH technical specifications and as
Cum 550
directed by the Engineer-in-Charge) Drain Side Walls concrete M-30 grade excluding formwork. Minimum quantity of
407 kg cement to be used per cum of concrete.
Vibrated reinforced cement concrete M 30 grade using crushed stone aggregate and fine aggregate, mechanically mixed
, compacted by vibration including curing for 14 days including cost, conveyance of all materials to site and labour
charges, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete
7 as per approved drawings and as directed during execution and for finished item per MORTH technical specifications
Cum
and as directed by the Engineer-in-Charge. Drain Slab concrete M-30 grade including formwork. Minimum quantity of
407 kg cement to be used per cum of concrete.

i. Vent Size - 0.6mx0.6m - 1.5mx1.5m for Drain Cum 1750

ii. Vent Size - 1.51mx1.51m - 2.00mx2.00m for Drain Cum 1700

iii. Vent Size - 2.01mx2.01m - 2.50mx2.50m for Drain Cum 1650

iv. Vent Size - Above - 2.51mx2.51m for Drain Cum 1500


Form work for Drain side walls including cost & conveyance of all materials to site and labour charges, other incidental
8 hire and operational charges of all T&P etc., complete as per approved drawings etc., complete and as directed by Sqm 275
Engineer-in-charge
Placement of High Yield Strength Deformed (HYSD /TMT) Steel including labour charges for straightening, cutting,
bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying
and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and
9 drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs,
spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges.
HYSD / TMT Steel will be provided by the company.

Cutting, Bending, loading HYSD bar Fe500 reinforcement complete as per drawings and technical
a MT 2200
specifications and as directed by the Engineer-in-charge.(HYSD bar reinforcement)

Fitting, placing and unloading of HYSD bar Fe500 reinforcement including binding wire -complete
b as per drawings and technical specifications and as directed by the Engineer-in-charge.(HYSD bar MT 5500
reinforcement)

Fixing of Weep Holes in true position for Drain / Power Duct Walls as indicated in the drawing and as directed by the
10 Engineer-In-Charge.Pipe will be provided by the Company.
No. 25

Power Duct

Item
Item Description Unit Rate Remarks
No.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50
1 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical
Cum 85
Specification 305 / 304 MORTH 0-3m. If not suitable, soil to be dumped in 1km Lead.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50
2 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical
Cum 100
Specification 305 / 304 MORTH 3-6m. If not suitable, soil to be dumped in 1km Lead.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50
3 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical
Cum 115
Specification 305 / 304 MORTH > 6m. If not suitable, soil to be dumped in 1km Lead.
Plain Cement Concrete PCC M10 ( 1:3:6 ) using 40mm hard granite machine crushed metal mechanically mixed ,
compacted by vibration including curing for 14 days including cost and conveyance of all materials to site, centring,
4 machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc., complete as per Cum 600
drawings and MORTH technical specifications clause 802,803 ,1202 & 1203 and 1500 , 1700 & 2100 and directed by
the departmental officers
Vibrated reinforced cement concrete M 30 grade from batching plant using 20mm & 10mm HBG crushed stone
aggregate ( and fine aggregate conforming, mechanically mixed , compacted by vibration including curing for 14 days
including cost, conveyance of all materials to site and labour charges, centring, machine mixing, laying, vibrating,
5 curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings
Cum 450
and as directed during execution for finished item as per as per MORTH technical specifications and as directed by the
Engineer-in-Charge a) Raft including formwork.
Vibrated reinforced cement concrete M 30 grade from batching plant using 20mm & 10mm HBG crushed stone
aggregate and fine aggregate, mechanically mixed , compacted by vibration including curing for 14 days including cost,
conveyance of all materials to site and labour charges, machine mixing, laying, vibrating, curing etc., including other
6 incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during
Cum 450
execution per MORTH technical specifications and as directed by the Engineer-in-Charge excluding formwork b) RCC
Duct wall

Vibrated reinforced cement concrete M 30 grade from batching plant using 20mm & 10mm HBG crushed stone
aggregate and fine aggregate, mechanically mixed , compacted by vibration including curing for 14 days including cost,
7 conveyance of all materials to site and labour charges, centring, machine mixing, laying, vibrating, curing etc., Cum 1525
including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as per
MORTH technical specifications and as directed by the Engineer-in-Charge c) Slab including formwork.

Form work for Duct side walls including cost & conveyance of all materials to site and labour charges, other incidental
8 hire and operational charges of all T&P etc., complete as per approved drawings etc., complete and as directed by Sqm 275
Engineer-in-charge
Placement of High Yield Strength Deformed (HYSD /TMT) Steel including labour charges for straightening, cutting,
bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying
and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and
9 drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs,
spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges.
HYSD / TMT Steel will be provided by the company.
Cutting, Bending, loading HYSD bar Fe500 reinforcement complete as per drawings and technical specifications and as
a directed by the Engineer-in-charge.(HYSD bar reinforcement)
MT 2200
Fitting, placing and unloading of HYSD bar Fe500 reinforcement including binding wire -complete as per drawings and
b technical specifications and as directed by the Engineer-in-charge.(HYSD bar reinforcement)
MT 5500
Fabrication of M.S.Rod weleded to 10mm Thick M.S.Flat Plate Embedded in RCC Duct Raft,Wall & Slab, as per
10 approved drawings as instructed by engineer in charge.
Kg 9
Providing & fixing of M.S.Rod weleded to 10mm Thick M.S.Flat Plate Embedded in RCC Raft,Duct Wall & Slab, as per
11 approved drawings as instructed by engineer in charge.
Kg 5.5
Drain and Power Duct Works Labour rates without Shuttering for ADCL Projects

Item
Item Description Unit Rate Remarks
No.
Placement of Vibrated cement concrete M-15 Grade Concrete (PCC) as levelling coarse for Drains & Power Duct
including cost and conveyance of all materials to site and all labour charges for Levelling of ground, placement of
1 300mm thick sand layer to the required level, centering, laying PCC in position, Compacting , Vibrating and curing for Cum 450
14days including all other incidental and operational charges of T&P required etc., complete as per approved drawings
and as directed by Engineer Incharge and as per MORTH technical specifications.
Placement of Vibrated reinforced cement concrete M-30 grade (RCC) including cost and conveyance of all materials to
site and labour charges for Centring, Scaffolding, laying RCC in position, vibrating, curing for 14days etc., including
2 other incidental and operational charges of all T&P etc., complete as per approved drawings and as directed by Cum
Engineer Incharge during execution and excluding cost of steel and its fabrication charges for finished item as per
MORTH technical specifications. Drain / Power Duct Raft concrete M-30 grade.

i. Vent Size - 0.6mx0.6m - 1.5mx1.5m for Drain Cum 600

ii. Vent Size - 1.51mx1.51m - 2.00mx2.00m for Drain Cum 500

iii. Vent Size - 2.01mx2.01m - 2.50mx2.50m for Drain Cum 425

iv. Vent Size - Above - 2.51mx2.51m for Drain Cum 375

v. Power Duct Raft (including fixing of edge angle) Cum 375

Placement of Vibrated reinforced cement concrete M 30 grade (RCC) including cost and conveyance of all materials to
site and labour charges for Centring, Scaffolding, laying RCC in position, vibrating, curing for 14days etc., including
3 other incidental and operational charges of all T&P etc., complete as per approved drawings and as directed by Cum 1100
Engineer Incharge during execution and excluding cost of steel and its fabrication charges for finished item per MORTH
technical specifications. Drain Side Walls concrete M-30 grade including formwork.

Placement of Vibrated reinforced cement concrete M 30 grade (RCC) including cost and conveyance of all materials to
site and labour charges for Centring, Scaffolding, laying RCC in position, vibrating, curing for 14days etc., including
4 other incidental and operational charges of all T&P etc., complete as per approved drawings and as directed by Cum 1000
Engineer Incharge during execution and excluding cost of steel and its fabrication charges for finished item per MORTH
technical specifications. Power Duct Side Walls concrete M-30 grade including formwork.

Placement of Vibrated reinforced cement concrete M 30 grade (RCC) including cost and conveyance of all materials to
site and labour charges for Centring, Scaffolding, laying RCC in position, vibrating, curing for 14days etc., including
other incidental and operational charges of all T&P etc., complete as per approved drawings and as directed by
5 Engineer Incharge during execution and excluding cost of steel and its fabrication charges for finished item per MORTH
Cum
technical specifications and as directed by the Engineer-in-Charge. Drain Slab concrete M-30 grade. Form work to be
provided by the Company.

i. Vent Size - 0.6mx0.6m - 1.5mx1.5m for Drain Cum 1100

ii. Vent Size - 1.51mx1.51m - 2.00mx2.00m for Drain Cum 1050

iii. Vent Size - 2.01mx2.01m - 2.50mx2.50m for Drain Cum 1000

iv. Vent Size - Above - 2.51mx2.51m for Drain and Power Duct Cum 950
Placement of High Yield Strength Deformed (HYSD /TMT) Steel including labour charges for straightening, cutting,
bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying
and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and
6 drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs,
spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges.
HYSD / TMT Steel will be provided by the company.

Cutting, Bending, loading HYSD bar Fe500 reinforcement complete as per drawings and technical
a MT 2200
specifications and as directed by the Engineer-in-charge.(HYSD bar reinforcement)
Fitting, placing and unloading of HYSD bar Fe500 reinforcement excluding binding wire -complete
b as per drawings and technical specifications and as directed by the Engineer-in-charge.(HYSD bar MT 4000
reinforcement)

Fixing of Weep Holes in true position for Drain / Power Duct Walls as indicated in the drawing and as directed by the
7 Engineer-In-Charge.Pipe will be provided by the Company.
No. 25

Fabrication of M.S.Rod weleded to 10mm Thick M.S.Flat Plate Embedded in RCC Duct Raft,Wall & Slab, as per
8 approved drawings as instructed by engineer in charge.
Kg 9
Providing & fixing of M.S.Rod weleded to 10mm Thick M.S.Flat Plate Embedded in RCC Raft,Duct Wall & Slab, as per
9 approved drawings as instructed by engineer in charge.
Kg 5.5

You might also like