Professional Documents
Culture Documents
Sample EffiCycle11 - Cost Report Format With Instructions
Sample EffiCycle11 - Cost Report Format With Instructions
Team Reg ID Manufacturing Cost Procurement Cost Total Cost Total No. of Parts Team Name Institute 2150.1 8503 10653.1 0
Block Electric Power Electric Power Electric Power Electric Power Manual Power Manual Power Manual Power Transmission Transmission Transmission Transmission Transmission Transmission Transmission Transmission Transmission Transmission Suspension Suspension Suspension Suspension Suspension Suspension Chassis
Part Name Battery Connectors Terminals Battery Mounting Paddles Connectors Cone Set 1 Spocket 1 Spocket 2 Spocket 3 Spocket 4 Bearing 1 Bearing 2 Bearing 3 Chain 1 Chain 2 Axle 1 Spring A1 Spring A2 Spring B1 Spring B2 Arm A Arm B Rhombus Frame
Part No. EP00104 EP00208 EP00301 EP00401 MP00102 MP00201 MP00302 TR00101 TR00201 TR00301 TR00401 TR00502 TR00602 TR00702 TR00801 TR00901 TR01001 SU00101 SU00201 SU00301 SU00401 SU00502 SU00602 CH00101
Level Qty 4 8 1 1 2 1 2 1 1 1 1 2 2 2 1 1 1 1 1 1 1 2 2 1
Cost (Procurement per item) 4000 2 10 55 25 10 75 76 65 50 50 60 60 60 400 500 555 300 300 250 250 275 275 800
Manufacturing Operation NO NO NO CT NO NO NO NO NO NO NO NO NO NO NO NO L NO NO NO NO TW TW TW
No. of Operations 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 60 60 80
Total Cost 4000 2 10 55.1 25 10 75 76 65 50 50 60 60 60 400 500 705 300 300 250 250 875 875 1600
Operation
Lathe (per 10 minutes) CNC (100 mm area / 10 mm length/depth) TIG (10 mm length) SMAW Welding (10 mm length) Gas Welding/Gas Cutting (10 mm length) Drill (10 mm depth) Reaming (10 mm depth) Boring (10 mm depth) Grinding (100 mm2 area) Super finishing (100 mm area) Filing (100 mm area) Riveting (per rivet) Shaper (100 mm2 area / 10 mm length/depth) Milling (100 mm area / 10 mm length/depth) Shearing (10 mm cut) Cutting (10 mm cut) Gear Hobbing (10 mm width per teeth) Rack Cutting (10 mm width per teeth) Pneumatic Operations (Requiring Pneumatic Source) Special Manufacturing Operation (actual expense incurred) No Operation
2 2 2 2
Code
L C TW SW GW D R B GW SF F RV SH M SG CT GH RC PO SP NO
Cost
50 5 10 15 12 5
0.1