0% found this document useful (0 votes)
13 views4 pages

Draft Proposal For Peachtree Installation and Configuration in Network

proposal for peach tree by gezae gebreding zerihun

Uploaded by

Gezae Gebredingl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views4 pages

Draft Proposal For Peachtree Installation and Configuration in Network

proposal for peach tree by gezae gebreding zerihun

Uploaded by

Gezae Gebredingl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DRAFT PROPOSAL FOR PEACHTREE INSTALLATION AND

CONFIGURATION IN NETWORK ENVIRONMENT TIGRAY YOUTH


ASSOCIATION (TYA)

Propsed by Gezae G.
Date 12/03/2017

1. INTRODUCTION
This proposal outlines the plan for the installation and configuration of Peachtree accounting software within a
network environment. The aim is to ensure seamless operation, secure data management, and efficient access for
multiple users.

2. OBJECTIVES
 To install and configure Peachtree software on designated servers and client machines on head office
of TYA.
 To track the costs associated with specific projects or jobs
 To allocate costs to individual jobs, providing a clearer picture of where resources are being used.
 To install and configure Peachtree software on client machines on seven zonal office of TYA.
 To make the system centralized control in one database Peachtree.
 To ensure proper network configuration for multi-user access and to configure different privilege.
 To provide training and support for staff on using the software effectively.

3. PROJECT SCOPE
 Assessment of Current Infrastructure and technology
 Evaluate existing network setup and hardware.
 To install each computer with windows 10 operating system
 Identify user requirements and software specifications.
 To expand/integrate existing network setup to zonal office

4. MAIN BENEFITS OF THIS PROPOSED SYSTEM


A. Centralized Data Management: Single Source of Truth: All data is stored on a central server,
ensuring that users access the same, up-to-date information.
B. Easier Backup: Centralized data simplifies backup processes, reducing the risk of data loss.
C. Multi-User Access:
o Simultaneous Access: Multiple users can access the system concurrently, which is essential
for teams working on shared projects.
o User Permissions: Administrators can set permissions for different users, enhancing security
and data integrity.
D. Improved Performance
o Resource Allocation: Servers are typically more powerful than individual workstations,
resulting in faster processing and better performance.
o Reduced Load on Client Machines: Offloading data processing to the server can improve
the performance of client machines.
E. Enhanced Security
o Centralized Control: Centralized data storage allows for better security measures, including
firewalls and antivirus software.
F. Scalability
o Easier Expansion: A server-based setup allows for easier addition of users and resources as
the business grows.
o Adaptability: Businesses can upgrade server hardware or software without affecting
individual workstations.
G. Detailed Cost Tracking
o Specificity: It enables businesses to allocate costs to individual jobs/project, providing a
clearer picture of where resources are being used.
o Expense Control: By tracking costs in real-time, businesses can identify overspending and
make necessary adjustments.
H. Enhanced Budgeting and Forecasting
I. Better Resource Allocation
o Efficiency: enables better resource management by identifying which jobs require more
manpower or materials.
o Allocation of Resources: Businesses can allocate resources more effectively based on past job
performance.
J. Comprehensive Reporting
o Detailed Reports: It offers various reporting options that summarize helping management
review job performance easily.
o Custom Reports: Users can generate customized reports to meet specific needs, facilitating
better insights into job performance.
K. Performance Metrics: Managers can evaluate employee performance based on job profitability and
efficiency.
L. Improved Cash Flow Management
o Billing Accuracy: ensures that invoices reflect the true costs incurred, improving cash
flow through timely and correct billing.
o Payment Tracking: Businesses can monitor payments against project costs to manage cash
flow more effectively.
M. Project Management Support
o Timeline Tracking: It can help track project timelines alongside costs, ensuring projects
stay on schedule and within budget.
N. Reduced IT Costs: While initial setup may require investment, long-term costs are often lower due
to reduced maintenance and support needs.
O. Efficiency Gains: Improved performance and data management can lead to significant time and cost
savings.

5. HARDWARE AND SOFTWARE REQUIREMENTS FOR PEACHTREE


INSTALLATION
1. Hardware Requirements
Server Requirements
Processor:
 Minimum: Dual-core processor (Intel i3 or equivalent)
 Recommended: Quad-core processor (Intel i5 or equivalent)
 RAM: Minimum: 8 GB
 Recommended: 16 GB or more for better performance with multiple users
Storage:
 Minimum: 250 GB hard drive (SSD preferred for speed)
 Recommended: 500 GB SSD or larger for faster access and additional storage
Network:
 Gigabit Ethernet adapter
 Stable internet connection for updates and support
Client Requirements
Processor:
 Minimum: Dual-core processor
 Recommended: Quad-core processor
RAM:
 Minimum: 4 GB
 Recommended: 8 GB for optimal performance
Storage:
 Minimum: 100 GB hard drive
 Recommended: 250 GB SSD for improved speed
Network:
 Reliable network connection (wired or Wi-Fi)
 Gigabit Ethernet is recommended for best performance
Additional Hardware
 Backup Solutions: External hard drives or cloud backup service for data security
 UPS (Uninterruptible Power Supply): To protect the server from power surges and outages
Software Requirements
Operating System
 Windows 10 or later (64-bit)
Peachtree (Sage 50) Software
Latest version of Peachtree/Sage 50 (check vendor for specific version compatibility)
Additional Software
 Antivirus Software: Ensure compatibility with Peachtree
 Firewall Configuration: Properly configured to allow Peachtree communication
 Office Suite: Microsoft Office (optional for report generation and data export)
Network Configuration
 Ensure appropriate network protocols are configured (TCP/IP).
 Install necessary network drivers and ensure they are up to date.

6. INSTALLATION PLAN
Server Installation:
 Install Peachtree on a dedicated server.
 Configure database settings for optimal performance.
 To category projects and zonal data in one company database
Client Installation:
 Install Peachtree on each client machine.
 Ensure compatibility with operating systems.
Network Configuration
 Configure network settings to allow multi-user access.
 Set up user permissions and access controls.
 Ensure secure data transmission within the network.
Data Migration
 If applicable, migrate existing data into the new Peachtree system.
 Verify data integrity post-migration.
Testing and Validation
 Conduct thorough testing to ensure all components are functioning.
 Validate user access and permissions.
Training and Support
 Provide comprehensive training sessions for all users.
 Offer ongoing technical support for troubleshooting and updates.

7. TIMELINE AND BUDGET ESTIMATE FOR PROFESSIONAL


Timeline
Phase Duration
Network installation 2 days
Installation and Configuration of Peachtree server 2 week
Data Migration 1 week
Testing and Validation 2 days
Training 2 days

Budget Estimate for professional


Tasks specific Cost/Birr
Install and configure Peachtree software and on Configuration of 25,000
designated servers and client machines at head office One Server
of TYA. Three clients

Install and configure Peachtree software on client Seven zone with 5000 +per
machines on seven zonal office of TYA. one server dim/day
configuration of
Peachtree
Training Staff training per dim/day
(zonal and head
offices)

CONCLUSION
Implementing Peachtree in a network environment will enhance accounting efficiency and data management.
This proposal outlines a comprehensive approach to installation, configuration, and user training, ensuring a
successful deployment. In addition it provides significant advantages for businesses looking to manage their
project costs effectively. By facilitating detailed tracking, improving profitability analysis, and enhancing
decision-making capabilities, it can also lead to better financial outcomes and overall business success.
We look forward to your feedback and approval to proceed with this project.

You might also like