REPORTE DE NUDOS EN LA HORA DE MINIMA DEMANDA (4 A.M.

Demanda Carga hidraulica Presión


Nudo Altitud (m)
(l/s) (m) (m H2O)
T-1 T-1 500.47 505.16
J-122 J-122 500.00 0.00 505.10 5.09
J-115 J-115 470.50 0.00 504.32 33.74
J-116 J-116 470.40 0.00 504.26 33.78
J-4 J-4 470.30 1.71 504.26 33.87
J-5 J-5 470.00 1.77 504.26 34.17
J-3 J-3 470.00 1.59 504.30 34.22
J-2 J-2 470.00 0.86 504.28 34.19
J-117 J-117 469.10 0.00 504.22 35.03
J-1 J-1 468.90 0.00 504.45 35.46
J-6 J-6 468.90 1.52 504.21 35.22
J-114 J-114 468.20 0.65 504.44 36.15
J-7 J-7 468.20 2.65 504.21 35.92
J-118 J-118 465.00 0.00 504.17 39.07
J-8 J-8 464.20 1.48 504.13 39.83
J-16 J-16 464.00 0.93 504.15 40.05
PRV-15-Out PRV-15-Out 463.70 483.75 20.00
PRV-15-In PRV-15-In 463.70 504.11 40.31
J-9 J-9 463.30 2.06 483.73 20.38
PRV-1-Out PRV-1-Out 461.40 481.45 20.00
PRV-1-In PRV-1-In 461.40 504.17 42.66
I-14 I-14 460.60 0.18 481.45 20.80
I-96 I-96 460.00 0.88 481.26 21.21
J-19 J-19 460.00 1.68 503.40 43.29
J-18 J-18 460.00 1.78 503.50 43.39
I-103 I-103 460.00 0.89 481.24 21.19
PRV-12-In PRV-12-In 459.80 503.32 43.41
PRV-12-Out PRV-12-Out 459.80 479.85 20.00
J-34 J-34 459.50 2.25 479.77 20.22
J-20 J-20 459.50 1.78 504.07 44.45
J-33 J-33 459.50 2.65 479.75 20.20
J-21 J-21 459.50 1.73 504.08 44.47
PRV-13-Out PRV-13-Out 459.00 479.05 20.00
PRV-13-In PRV-13-In 459.00 504.08 44.97
I-15 I-15 458.80 1.00 481.21 22.35
J-35 J-35 458.60 2.25 479.07 20.41
J-17 J-17 458.60 1.94 503.91 45.20
J-36 J-36 458.60 2.01 479.05 20.40
J-23 J-23 458.60 0.94 504.18 45.46
PRV-6-In PRV-6-In 458.30 503.91 45.50
J-24 J-24 458.30 1.38 504.18 45.76
PRV-6-Out PRV-6-Out 458.30 479.63 21.28
J-32 J-32 457.90 3.31 479.63 21.68
I-13 I-13 457.70 0.44 481.45 23.69
J-10 J-10 457.00 2.11 481.96 24.89
J-22 J-22 457.00 0.64 504.15 47.03
PRV-14-Out PRV-14-Out 456.80 477.58 20.73
PRV-14-In PRV-14-In 456.80 504.18 47.26
J-11 J-11 456.60 1.12 481.75 25.09
J-37 J-37 456.50 0.94 478.93 22.38
J-12 J-12 455.00 1.12 481.52 26.45
J-25 J-25 454.90 2.14 504.14 49.11
REPORTE DE NUDOS EN LA HORA DE MINIMA DEMANDA (4 A.M.)

Demanda Carga hidraulica Presión


Nudo Altitud (m)
(l/s) (m) (m H2O)
J-26 J-26 454.60 1.81 482.89 28.22
J-38 J-38 453.80 0.78 478.61 24.74
J-27 J-27 449.50 4.04 482.29 32.71
J-40 J-40 448.00 2.65 479.20 31.12
J-41 J-41 447.80 2.25 479.19 31.31
J-43 J-43 447.70 2.01 478.06 30.28
J-42 J-42 447.60 2.25 478.24 30.56
J-46 J-46 447.20 3.23 479.19 31.91
J-47 J-47 446.80 2.01 477.85 30.97
J-39 J-39 446.80 3.42 479.21 32.33
J-28 J-28 446.70 1.83 481.13 34.35
J-76 J-76 446.20 1.71 481.11 34.82
J-45 J-45 446.10 2.90 479.20 33.02
J-44 J-44 445.00 2.01 477.72 32.63
J-29 J-29 444.90 1.82 481.13 36.14
J-48 J-48 444.50 2.01 477.59 33.01
J-49 J-49 444.30 2.68 477.58 33.19
J-77 J-77 444.20 1.71 481.12 36.82
I-30 I-30 444.00 1.09 481.12 37.02
I-97 I-97 442.00 0.80 481.12 39.03
I-104 I-104 442.00 0.80 481.13 39.03
I-31 I-31 441.50 1.09 481.13 39.53
J-50 J-50 439.80 2.68 477.33 37.43
J-78 J-78 436.40 1.71 480.81 44.30
J-125 J-125 436.00 0.00 481.02 44.90
J-126 J-126 436.00 0.00 481.10 44.99
J-129 J-129 436.00 0.00 480.98 44.86
J-128 J-128 436.00 0.00 481.11 45.00
J-127 J-127 436.00 0.00 481.11 44.99
J-80 J-80 435.70 0.93 454.33 18.58
J-52 J-52 435.60 2.01 476.06 40.36
PRV-9-In PRV-9-In 435.30 475.94 40.54
PRV-9-Out PRV-9-Out 435.30 455.35 20.00
J-56 J-56 435.10 2.01 455.20 20.05
J-79 J-79 434.80 1.71 480.67 45.76
PRV-3-In PRV-3-In 434.50 480.61 45.99
PRV-3-Out PRV-3-Out 434.50 454.55 20.00
J-81 J-81 434.00 1.57 454.47 20.42
J-53 J-53 433.20 2.01 477.14 43.83
PRV-10-Out PRV-10-Out 433.10 453.83 20.67
PRV-10-In PRV-10-In 433.10 477.14 43.93
J-57 J-57 432.90 2.01 453.83 20.87
J-54 J-54 432.90 2.68 477.16 44.15
J-58 J-58 432.40 2.68 453.78 21.32
J-51 J-51 432.20 2.63 479.18 46.86
J-55 J-55 430.30 2.68 477.19 46.78
PRV-11-In PRV-11-In 430.00 477.19 47.07
PRV-11-Out PRV-11-Out 430.00 453.55 23.49
J-59 J-59 429.80 2.68 453.55 23.69
J-60 J-60 429.30 1.99 453.54 24.18
J-121 J-121 429.00 0.00 454.09 25.02
I-50 I-50 429.00 0.00 454.08 25.02
REPORTE DE NUDOS EN LA HORA DE MINIMA DEMANDA (4 A.M.)

Demanda Carga hidraulica Presión


Nudo Altitud (m)
(l/s) (m) (m H2O)
J-123 J-123 429.00 0.00 454.08 25.02
J-130 J-130 429.00 0.00 454.16 25.10
J-120 J-120 429.00 0.00 454.14 25.08
J-61 J-61 426.80 2.01 453.52 26.66
J-86 J-86 426.20 2.36 454.03 27.76
J-82 J-82 426.00 1.18 454.17 28.10
I-84 I-84 425.80 0.37 454.08 28.21
I-98 I-98 425.70 0.36 454.08 28.31
I-105 I-105 425.60 0.29 454.08 28.40
J-83 J-83 424.00 1.18 454.09 30.02
J-62 J-62 423.70 2.01 454.33 30.55
I-88 I-88 423.40 0.22 454.07 30.60
J-87 J-87 423.40 2.75 454.07 30.60
I-99 I-99 423.10 0.22 454.07 30.89
I-106 I-106 423.00 0.10 454.07 30.99
I-85 I-85 422.90 0.37 454.07 31.10
J-63 J-63 422.60 2.01 453.75 31.07
J-64 J-64 422.40 2.32 453.69 31.21
J-68 J-68 421.80 1.22 453.66 31.78
I-89 I-89 421.00 0.22 454.07 32.99
J-65 J-65 419.80 2.68 453.54 33.66
J-66 J-66 419.80 1.77 453.54 33.65
J-69 J-69 419.30 1.33 453.54 34.16
J-70 J-70 419.20 1.42 453.54 34.25
J-72 J-72 418.50 1.05 453.62 35.03
J-67 J-67 417.10 1.77 453.52 36.33
J-71 J-71 416.70 1.71 453.52 36.73
J-90 J-90 416.10 2.36 454.03 37.83
J-91 J-91 414.80 2.75 454.05 39.15
I-92 I-92 414.70 0.47 454.05 39.25
I-100 I-100 413.50 0.29 454.05 40.44
I-107 I-107 413.30 0.47 454.04 40.64
I-93 I-93 411.50 0.29 454.05 42.44
J-73 J-73 410.60 1.85 453.54 42.83
J-74 J-74 410.00 1.34 453.54 43.43
PRV-4-Out PRV-4-Out 408.00 423.04 15.00
PRV-4-In PRV-4-In 408.00 453.97 45.85
J-133 J-133 407.00 0.00 423.02 15.98
J-131 J-131 407.00 0.00 423.03 15.99
J-132 J-132 407.00 0.00 423.03 15.99
J-75 J-75 404.60 2.33 453.52 48.80
I-94 I-94 404.60 0.08 423.02 18.37
I-101 I-101 404.50 0.37 423.02 18.47
I-110 I-110 404.50 0.60 423.02 18.47
I-108 I-108 404.20 0.37 423.02 18.77
I-112 I-112 402.70 0.86 423.01 20.26
I-95 I-95 401.70 0.08 423.01 21.26
I-111 I-111 383.40 0.64 423.01 39.51
I-109 I-109 380.20 0.18 423.01 42.70
I-102 I-102 380.20 0.18 423.01 42.70
J-113 J-113 378.00 2.38 423.00 44.89
REPORTE DE NUDOS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Altitud Carga hidraulica Presión


Nudo Demanda (l/s)
(m) (m) (m H2O)
T-1 T-1 500.47 504.06
J-122 J-122 500.00 0.00 503.11 3.10
J-115 J-115 470.50 0.00 489.70 19.15
J-116 J-116 470.40 0.00 488.12 17.67
J-4 J-4 470.30 1.71 487.95 17.61
J-5 J-5 470.00 1.77 487.97 17.92
J-3 J-3 470.00 1.59 489.55 19.51
J-2 J-2 470.00 0.86 489.48 19.43
J-117 J-117 469.10 0.00 486.84 17.70
J-1 J-1 468.90 0.00 491.92 22.96
J-6 J-6 468.90 1.52 486.46 17.52
J-114 J-114 468.20 0.65 491.81 23.55
J-7 J-7 468.20 2.65 486.47 18.22
J-118 J-118 465.00 0.00 485.87 20.81
J-8 J-8 464.20 1.48 485.57 21.31
J-16 J-16 464.00 0.93 488.78 24.72
PRV-15-Out PRV-15-Out 463.70 483.75 20.00
PRV-15-In PRV-15-In 463.70 485.44 21.69
J-9 J-9 463.30 2.06 483.63 20.28
PRV-1-Out PRV-1-Out 461.40 481.45 20.00
PRV-1-In PRV-1-In 461.40 485.46 24.00
I-14 I-14 460.60 0.18 481.29 20.64
I-96 I-96 460.00 0.88 475.78 15.74
J-19 J-19 460.00 1.68 483.56 23.51
J-18 J-18 460.00 1.78 484.14 24.08
I-103 I-103 460.00 0.89 475.15 15.11
PRV-12-In PRV-12-In 459.80 483.25 23.39
PRV-12-Out PRV-12-Out 459.80 479.85 20.00
J-34 J-34 459.50 2.25 479.52 19.97
J-20 J-20 459.50 1.78 483.47 23.91
J-33 J-33 459.50 2.65 479.32 19.77
J-21 J-21 459.50 1.73 483.26 23.70
PRV-13-Out PRV-13-Out 459.00 479.05 20.00
PRV-13-In PRV-13-In 459.00 483.11 24.05
I-15 I-15 458.80 1.00 474.13 15.29
J-35 J-35 458.60 2.25 478.87 20.22
J-17 J-17 458.60 1.94 486.38 27.71
J-36 J-36 458.60 2.01 478.88 20.23
J-23 J-23 458.60 0.94 483.19 24.53
PRV-6-In PRV-6-In 458.30 486.38 28.01
J-24 J-24 458.30 1.38 483.17 24.80
PRV-6-Out PRV-6-Out 458.30 478.35 20.00
J-32 J-32 457.90 3.31 478.34 20.39
I-13 I-13 457.70 0.44 475.98 18.24
J-10 J-10 457.00 2.11 475.91 18.86
J-22 J-22 457.00 0.64 483.20 26.13
PRV-14-Out PRV-14-Out 456.80 476.85 20.00
PRV-14-In PRV-14-In 456.80 482.34 25.48
J-11 J-11 456.60 1.12 475.35 18.71
J-37 J-37 456.50 0.94 478.04 21.49
J-12 J-12 455.00 1.12 475.23 20.18
REPORTE DE NUDOS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Altitud Carga hidraulica Presión


Nudo Demanda (l/s)
(m) (m) (m H2O)
J-25 J-25 454.90 2.14 483.77 28.80
J-26 J-26 454.60 1.81 478.99 24.32
J-38 J-38 453.80 0.78 475.81 21.96
J-27 J-27 449.50 4.04 476.35 26.79
J-40 J-40 448.00 2.65 474.56 26.49
J-41 J-41 447.80 2.25 474.56 26.69
J-43 J-43 447.70 2.01 471.18 23.42
J-42 J-42 447.60 2.25 471.94 24.28
J-46 J-46 447.20 3.23 474.45 27.18
J-47 J-47 446.80 2.01 469.96 23.11
J-39 J-39 446.80 3.42 474.53 27.66
J-28 J-28 446.70 1.83 470.05 23.29
J-76 J-76 446.20 1.71 469.75 23.49
J-45 J-45 446.10 2.90 474.45 28.28
J-44 J-44 445.00 2.01 470.09 25.03
J-29 J-29 444.90 1.82 470.25 25.28
J-48 J-48 444.50 2.01 469.55 24.99
J-49 J-49 444.30 2.68 469.55 25.19
J-77 J-77 444.20 1.71 470.16 25.89
I-30 I-30 444.00 1.09 470.32 26.26
I-97 I-97 442.00 0.80 471.27 29.20
I-104 I-104 442.00 0.80 471.32 29.25
I-31 I-31 441.50 1.09 471.38 29.81
J-50 J-50 439.80 2.68 462.21 22.35
J-78 J-78 436.40 1.71 464.91 28.44
J-125 J-125 436.00 0.00 468.79 32.71
J-126 J-126 436.00 0.00 470.77 34.68
J-129 J-129 436.00 0.00 468.06 31.98
J-128 J-128 436.00 0.00 471.08 34.99
J-127 J-127 436.00 0.00 470.89 34.80
J-80 J-80 435.70 0.93 450.71 14.97
J-52 J-52 435.60 2.01 457.23 21.58
PRV-9-In PRV-9-In 435.30 456.89 21.53
PRV-9-Out PRV-9-Out 435.30 455.35 20.00
J-56 J-56 435.10 2.01 454.91 19.76
J-79 J-79 434.80 1.71 462.73 27.86
PRV-3-In PRV-3-In 434.50 461.61 27.04
PRV-3-Out PRV-3-Out 434.50 454.55 20.00
J-81 J-81 434.00 1.57 453.17 19.12
J-53 J-53 433.20 2.01 457.83 24.57
PRV-10-Out PRV-10-Out 433.10 453.15 20.00
PRV-10-In PRV-10-In 433.10 457.40 24.24
J-57 J-57 432.90 2.01 452.70 19.75
J-54 J-54 432.90 2.68 458.04 25.08
J-58 J-58 432.40 2.68 452.00 19.55
J-51 J-51 432.20 2.63 474.18 41.88
J-55 J-55 430.30 2.68 457.33 26.97
PRV-11-In PRV-11-In 430.00 457.20 27.13
PRV-11-Out PRV-11-Out 430.00 450.05 20.00
J-59 J-59 429.80 2.68 449.90 20.05
J-60 J-60 429.30 1.99 449.61 20.26
REPORTE DE NUDOS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Altitud Carga hidraulica Presión


Nudo Demanda (l/s)
(m) (m) (m H2O)
J-121 J-121 429.00 0.00 446.62 17.57
I-50 I-50 429.00 0.00 446.48 17.44
J-123 J-123 429.00 0.00 446.56 17.52
J-130 J-130 429.00 0.00 447.93 18.88
J-120 J-120 429.00 0.00 447.57 18.52
J-61 J-61 426.80 2.01 448.94 22.08
J-86 J-86 426.20 2.36 445.59 19.34
J-82 J-82 426.00 1.18 447.99 21.93
I-84 I-84 425.80 0.37 446.59 20.73
I-98 I-98 425.70 0.36 446.45 20.69
I-105 I-105 425.60 0.29 446.43 20.78
J-83 J-83 424.00 1.18 446.71 22.65
J-62 J-62 423.70 2.01 451.70 27.93
I-88 I-88 423.40 0.22 446.41 22.95
J-87 J-87 423.40 2.75 446.41 22.96
I-99 I-99 423.10 0.22 446.35 23.20
I-106 I-106 423.00 0.10 446.35 23.29
I-85 I-85 422.90 0.37 446.40 23.44
J-63 J-63 422.60 2.01 450.28 27.61
J-64 J-64 422.40 2.32 449.98 27.51
J-68 J-68 421.80 1.22 449.71 27.84
I-89 I-89 421.00 0.22 446.34 25.28
J-65 J-65 419.80 2.68 449.02 29.14
J-66 J-66 419.80 1.77 448.99 29.11
J-69 J-69 419.30 1.33 449.00 29.62
J-70 J-70 419.20 1.42 448.97 29.69
J-72 J-72 418.50 1.05 449.37 30.80
J-67 J-67 417.10 1.77 448.81 31.63
J-71 J-71 416.70 1.71 448.80 32.02
J-90 J-90 416.10 2.36 445.56 29.39
J-91 J-91 414.80 2.75 445.91 31.04
I-92 I-92 414.70 0.47 445.93 31.15
I-100 I-100 413.50 0.29 445.93 32.35
I-107 I-107 413.30 0.47 445.90 32.52
I-93 I-93 411.50 0.29 446.02 34.43
J-73 J-73 410.60 1.85 448.88 38.18
J-74 J-74 410.00 1.34 448.86 38.76
PRV-4-Out PRV-4-Out 408.00 423.04 15.00
PRV-4-In PRV-4-In 408.00 444.59 36.50
J-133 J-133 407.00 0.00 422.78 15.74
J-131 J-131 407.00 0.00 422.90 15.86
J-132 J-132 407.00 0.00 422.84 15.80
J-75 J-75 404.60 2.33 448.71 44.00
I-94 I-94 404.60 0.08 422.73 18.08
I-101 I-101 404.50 0.37 422.72 18.17
I-110 I-110 404.50 0.60 422.71 18.17
I-108 I-108 404.20 0.37 422.72 18.47
I-112 I-112 402.70 0.86 422.64 19.89
I-95 I-95 401.70 0.08 422.64 20.89
I-111 I-111 383.40 0.64 422.55 39.05
I-109 I-109 380.20 0.18 422.54 42.23
REPORTE DE NUDOS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Altitud Carga hidraulica Presión


Nudo Demanda (l/s)
(m) (m) (m H2O)
I-102 I-102 380.20 0.18 422.55 42.24
J-113 J-113 378.00 2.38 422.47 44.35
REPORTE DE TUBERIAS EN LA HORA DE MINIMA DEMANDA (4 A.M.)

Gradiente
Longitud Diametro Caudal Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Material Rugosidad hidraulico
(m) (mm) (l/s) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-217 J-122 J-1 1,505.50 350 PVC 140 37.55 0.39 505.10 504.45 0.65 0.43
P-199 J-115 J-116 425.00 350 PVC 140 20.23 0.21 504.32 504.26 0.06 0.14
P-216 T-1 J-122 128.00 350 PVC 140 37.55 0.39 505.16 505.10 0.06 0.43
P-198 J-1 J-115 357.50 350 PVC 140 33.40 0.35 504.45 504.32 0.13 0.35
P-201 J-117 J-118 489.50 300 PVC 140 10.96 0.16 504.22 504.17 0.05 0.09
P-207 J-118 PRV-1-In 566.00 300 PVC 140 2.94 0.04 504.17 504.17 0.00 0.01
P-200 J-116 J-117 305.00 300 PVC 140 14.08 0.20 504.26 504.22 0.05 0.15
P-212 PRV-1-Out I-14 30.50 200 PVC 140 2.94 0.09 481.45 481.45 0.00 0.06
P-284 J-116 J-5 26.00 200 PVC 140 6.16 0.20 504.26 504.26 0.01 0.23
P-283 J-115 J-3 21.00 200 PVC 140 13.17 0.42 504.32 504.30 0.02 0.95
P-35 J-36 J-37 282.00 150 PVC 140 3.91 0.22 479.05 478.93 0.12 0.41
P-286 PRV-12-Out J-34 12.00 150 PVC 140 17.51 0.99 479.85 479.77 0.08 6.56
P-99 J-7 J-24 412.00 150 PVC 140 1.66 0.09 504.21 504.18 0.03 0.08
P-31 J-32 J-33 532.00 150 PVC 140 -2.81 0.16 479.63 479.75 0.12 0.22
P-34 J-35 J-36 26.00 150 PVC 140 5.07 0.29 479.07 479.05 0.02 0.66
P-33 J-34 J-35 399.00 150 PVC 140 8.62 0.49 479.77 479.07 0.71 1.77
P-32 J-33 J-34 26.00 150 PVC 140 -5.85 0.33 479.75 479.77 0.02 0.86
P-45 J-48 J-49 26.50 150 PVC 140 4.41 0.25 477.59 477.58 0.01 0.51
P-85 J-3 J-19 374.50 150 PVC 140 10.19 0.58 504.30 503.40 0.90 2.41
P-206 J-1 J-114 19.50 150 PVC 140 4.15 0.23 504.45 504.44 0.01 0.46
P-294 PRV-15-Out J-9 13.00 150 PVC 140 8.66 0.49 483.75 483.73 0.02 1.79
P-292 PRV-14-Out J-49 502.50 150 PVC 140 0.00 0.00 477.58 477.58 0.00 0.00
P-290 J-117 J-7 24.00 150 PVC 140 3.12 0.18 504.22 504.21 0.01 0.27
P-202 J-118 J-8 24.50 150 PVC 140 8.02 0.45 504.17 504.13 0.04 1.55
P-6 J-6 J-7 25.00 150 PVC 140 -0.08 0.00 504.21 504.21 0.00 0.00
P-289 PRV-13-Out J-36 11.50 150 PVC 140 2.65 0.15 479.05 479.05 0.00 0.20
P-91 J-5 J-21 433.50 150 PVC 140 3.87 0.22 504.26 504.08 0.17 0.40
P-4 J-5 J-4 25.50 150 PVC 140 1.09 0.06 504.26 504.26 0.00 0.04
P-293 J-8 PRV-15-In 13.50 150 PVC 140 8.66 0.49 504.13 504.11 0.02 1.78
P-288 J-21 PRV-13-In 10.00 150 PVC 140 2.65 0.15 504.08 504.08 0.00 0.20
P-291 J-24 PRV-14-In 56.50 150 PVC 140 0.00 0.00 504.18 504.18 0.00 0.00
P-285 J-19 PRV-12-In 11.50 150 PVC 140 17.51 0.99 503.40 503.32 0.08 6.56
P-23 J-23 J-24 28.50 150 PVC 140 -0.75 0.04 504.18 504.18 0.00 0.02
P-171 I-100 I-107 30.00 100 PVC 140 0.44 0.06 454.05 454.04 0.00 0.05
P-168 I-99 I-106 30.00 100 PVC 140 0.17 0.02 454.07 454.07 0.00 0.01
P-155 I-99 I-100 379.00 100 PVC 140 0.50 0.06 454.07 454.05 0.02 0.07
P-162 I-97 I-104 28.50 100 PVC 140 -0.19 0.02 481.12 481.13 0.00 0.01
P-223 I-96 I-97 726.00 100 PVC 140 0.89 0.11 481.26 481.12 0.14 0.19
P-240 I-97 J-126 299.00 100 PVC 140 0.55 0.07 481.12 481.10 0.02 0.08
P-165 I-98 I-105 29.00 100 PVC 140 0.30 0.04 454.08 454.08 0.00 0.03
P-152 I-98 I-99 91.00 100 PVC 140 0.47 0.06 454.08 454.07 0.01 0.06
P-159 I-101 I-102 1,012.00 100 PVC 140 0.18 0.02 423.02 423.01 0.01 0.01
P-166 I-105 I-85 185.00 100 PVC 140 0.17 0.02 454.08 454.07 0.00 0.01
P-243 I-104 J-127 298.50 100 PVC 140 0.49 0.06 481.13 481.11 0.02 0.06
REPORTE DE TUBERIAS EN LA HORA DE MINIMA DEMANDA (4 A.M.)

Gradiente
Longitud Diametro Caudal Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Material Rugosidad hidraulico
(m) (mm) (l/s) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-170 I-105 I-106 91.50 100 PVC 140 0.45 0.06 454.08 454.07 0.00 0.05
P-173 I-106 I-107 379.00 100 PVC 140 0.51 0.07 454.07 454.04 0.03 0.07
P-169 I-106 I-89 187.50 100 PVC 140 0.09 0.01 454.07 454.07 0.00 0.00
P-190 I-102 I-109 35.00 100 PVC 140 0.19 0.02 423.01 423.01 0.00 0.01
P-174 I-101 I-108 30.50 100 PVC 140 0.10 0.01 423.02 423.02 0.00 0.00
P-161 I-103 I-15 191.00 100 PVC 140 0.87 0.11 481.24 481.21 0.03 0.18
P-163 I-104 I-31 190.00 100 PVC 140 -0.05 0.01 481.13 481.13 0.00 0.00
P-224 I-103 I-104 729.50 100 PVC 140 0.81 0.10 481.24 481.13 0.12 0.16
P-73 J-86 J-87 494.00 100 PVC 140 -0.62 0.08 454.03 454.07 0.05 0.10
P-180 I-85 I-89 88.50 100 PVC 140 0.39 0.05 454.07 454.07 0.00 0.04
P-129 J-86 J-90 380.00 100 PVC 140 0.12 0.01 454.03 454.03 0.00 0.00
P-136 J-87 J-91 376.50 100 PVC 140 0.55 0.07 454.07 454.05 0.03 0.08
P-74 J-87 I-88 21.50 100 PVC 140 0.16 0.02 454.07 454.07 0.00 0.01
P-70 J-82 J-83 271.00 100 PVC 140 1.09 0.14 454.17 454.09 0.07 0.28
P-69 J-81 J-80 275.00 100 PVC 140 1.54 0.20 454.47 454.33 0.14 0.52
P-135 J-83 J-87 22.00 100 PVC 140 1.91 0.24 454.09 454.07 0.02 0.79
P-147 I-84 I-98 188.50 100 PVC 140 0.40 0.05 454.08 454.08 0.01 0.04
P-139 I-84 I-88 91.00 100 PVC 140 0.67 0.09 454.08 454.07 0.01 0.11
P-282 PRV-11-Out J-59 12.50 100 PVC 140 0.00 0.00 453.55 453.55 0.00 0.00
P-153 I-92 I-100 191.00 100 PVC 140 0.01 0.00 454.05 454.05 0.00 0.00
P-183 I-94 I-110 54.50 100 PVC 140 0.24 0.03 423.02 423.02 0.00 0.02
P-160 I-96 I-103 28.50 100 PVC 140 1.86 0.24 481.26 481.24 0.02 0.75
P-150 I-88 I-99 188.00 100 PVC 140 0.25 0.03 454.07 454.07 0.00 0.02
P-140 I-88 I-92 378.50 100 PVC 140 0.53 0.07 454.07 454.05 0.03 0.07
P-181 I-89 I-93 379.50 100 PVC 140 0.43 0.05 454.07 454.05 0.02 0.05
P-77 J-91 I-92 20.50 100 PVC 140 -0.43 0.05 454.05 454.05 0.00 0.05
P-76 J-90 J-91 500.00 100 PVC 140 -0.39 0.05 454.03 454.05 0.02 0.04
P-172 I-107 I-93 186.00 100 PVC 140 -0.37 0.05 454.04 454.05 0.01 0.04
P-228 J-120 I-84 188.50 100 PVC 140 1.15 0.15 454.14 454.08 0.06 0.31
P-253 J-130 J-120 19.50 100 PVC 140 2.27 0.29 454.16 454.14 0.02 1.08
P-252 J-130 J-83 261.00 100 PVC 140 1.08 0.14 454.16 454.09 0.07 0.27
P-231 J-120 J-121 190.00 100 PVC 140 1.12 0.14 454.14 454.09 0.06 0.29
P-260 J-132 I-101 143.00 100 PVC 140 0.43 0.05 423.03 423.02 0.01 0.05
P-264 J-132 J-133 188.50 100 PVC 140 0.26 0.03 423.03 423.02 0.00 0.02
P-261 J-131 J-132 30.50 100 PVC 140 0.68 0.09 423.03 423.03 0.00 0.12
P-256 PRV-3-Out J-81 16.00 100 PVC 140 5.22 0.66 454.55 454.47 0.08 5.04
P-258 J-131 I-108 142.50 100 PVC 140 0.54 0.07 423.03 423.02 0.01 0.07
P-242 J-125 J-126 189.50 100 PVC 140 -1.42 0.18 481.02 481.10 0.09 0.45
P-236 I-50 I-85 189.50 100 PVC 140 0.29 0.04 454.08 454.07 0.00 0.02
P-245 J-126 J-127 27.50 100 PVC 140 -0.87 0.11 481.10 481.11 0.01 0.18
P-249 J-129 J-79 95.00 100 PVC 140 4.09 0.52 480.98 480.67 0.30 3.20
P-248 J-127 J-128 188.00 100 PVC 140 -0.38 0.05 481.11 481.11 0.01 0.04
P-234 J-121 J-123 28.00 100 PVC 140 0.68 0.09 454.09 454.08 0.00 0.12
P-230 J-121 I-98 187.50 100 PVC 140 0.45 0.06 454.09 454.08 0.01 0.05
P-250 J-129 J-125 27.00 100 PVC 140 -2.64 0.34 480.98 481.02 0.04 1.43
REPORTE DE TUBERIAS EN LA HORA DE MINIMA DEMANDA (4 A.M.)

Gradiente
Longitud Diametro Caudal Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Material Rugosidad hidraulico
(m) (mm) (l/s) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-237 J-123 I-50 186.00 100 PVC 140 0.29 0.04 454.08 454.08 0.00 0.02
P-233 J-123 I-105 189.00 100 PVC 140 0.38 0.05 454.08 454.08 0.01 0.04
P-185 I-110 I-111 936.00 100 PVC 140 0.18 0.02 423.02 423.01 0.01 0.01
P-184 I-110 I-101 131.00 100 PVC 140 -0.07 0.01 423.02 423.02 0.00 0.00
P-189 I-111 I-102 153.00 100 PVC 140 0.05 0.01 423.01 423.01 0.00 0.00
P-280 PRV-10-Out J-57 12.50 100 PVC 140 0.00 0.00 453.83 453.83 0.00 0.00
P-187 I-112 I-95 70.00 100 PVC 140 0.02 0.00 423.01 423.01 0.00 0.00
P-177 I-108 I-109 1,029.50 100 PVC 140 0.18 0.02 423.02 423.01 0.01 0.01
P-265 I-107 PRV-4-In 223.50 100 PVC 140 1.22 0.16 454.04 453.97 0.08 0.34
P-186 I-108 I-112 121.00 100 PVC 140 0.37 0.05 423.02 423.01 0.00 0.04
P-191 I-109 J-113 140.00 100 PVC 140 0.34 0.04 423.01 423.00 0.00 0.03
P-270 PRV-6-Out J-32 14.00 100 PVC 140 0.00 0.00 479.63 479.63 0.00 0.00
P-266 PRV-4-Out J-131 23.50 100 PVC 140 1.22 0.16 423.04 423.03 0.01 0.34
P-263 J-133 I-94 142.00 100 PVC 140 0.26 0.03 423.02 423.02 0.00 0.02
P-188 I-112 J-113 1,103.00 100 PVC 140 0.17 0.02 423.01 423.00 0.01 0.01
P-278 PRV-9-Out J-56 13.50 100 PVC 140 8.14 1.04 455.35 455.20 0.15 11.47
P-197 J-114 J-2 322.50 100 PVC 140 1.48 0.19 504.44 504.28 0.16 0.49
P-196 J-114 J-16 218.00 100 PVC 140 2.53 0.32 504.44 504.15 0.29 1.32
P-246 I-31 J-128 301.00 100 PVC 140 0.38 0.05 481.13 481.11 0.01 0.04
P-238 I-30 J-125 300.50 100 PVC 140 1.22 0.16 481.12 481.02 0.10 0.34
P-144 I-30 I-97 189.50 100 PVC 140 -0.35 0.04 481.12 481.12 0.01 0.03
P-87 J-34 J-41 438.50 100 PVC 140 2.55 0.32 479.77 479.19 0.59 1.34
P-82 J-33 J-40 436.50 100 PVC 140 2.47 0.31 479.75 479.20 0.55 1.27
P-37 J-32 J-39 449.00 100 PVC 140 2.11 0.27 479.63 479.21 0.42 0.94
P-131 J-29 J-77 25.00 100 PVC 140 1.65 0.21 481.13 481.12 0.02 0.60
P-24 J-24 J-25 416.50 100 PVC 140 0.61 0.08 504.18 504.14 0.04 0.10
P-22 J-22 J-23 93.50 100 PVC 140 -1.13 0.14 504.15 504.18 0.03 0.30
P-21 J-21 J-22 278.50 100 PVC 140 -0.99 0.13 504.08 504.15 0.07 0.23
P-125 J-28 J-76 31.50 100 PVC 140 1.89 0.24 481.13 481.11 0.02 0.77
P-28 J-28 J-29 295.00 100 PVC 140 0.06 0.01 481.13 481.13 0.00 0.00
P-26 J-26 J-27 375.50 100 PVC 140 2.80 0.36 482.89 482.29 0.60 1.59
P-41 J-42 J-43 26.00 100 PVC 140 6.08 0.77 478.24 478.06 0.17 6.68
P-40 J-41 J-42 397.50 100 PVC 140 3.49 0.44 479.19 478.24 0.95 2.39
P-83 J-40 J-46 26.00 100 PVC 140 0.75 0.10 479.20 479.19 0.00 0.14
P-101 J-44 J-48 24.50 100 PVC 140 5.24 0.67 477.72 477.59 0.12 5.08
P-94 J-43 J-47 25.00 100 PVC 140 6.91 0.88 478.06 477.85 0.21 8.45
P-42 J-43 J-44 362.00 100 PVC 140 2.12 0.27 478.06 477.72 0.35 0.95
P-39 J-40 J-41 26.00 100 PVC 140 1.42 0.18 479.20 479.19 0.01 0.45
P-36 J-37 J-38 122.00 100 PVC 140 3.71 0.47 478.93 478.61 0.33 2.68
P-93 J-36 J-43 438.50 100 PVC 140 3.38 0.43 479.05 478.06 0.99 2.25
P-90 J-35 J-42 439.50 100 PVC 140 3.07 0.39 479.07 478.24 0.83 1.89
P-195 J-39 J-45 26.00 100 PVC 140 1.12 0.14 479.21 479.20 0.01 0.29
P-38 J-39 J-40 541.00 100 PVC 140 0.26 0.03 479.21 479.20 0.01 0.02
P-100 J-38 J-44 361.00 100 PVC 140 3.55 0.45 478.61 477.72 0.89 2.46
P-111 J-9 J-26 415.50 100 PVC 140 3.18 0.41 483.73 482.89 0.84 2.02
REPORTE DE TUBERIAS EN LA HORA DE MINIMA DEMANDA (4 A.M.)

Gradiente
Longitud Diametro Caudal Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Material Rugosidad hidraulico
(m) (mm) (l/s) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-9 J-9 J-10 375.50 100 PVC 140 5.04 0.64 483.73 481.96 1.77 4.72
P-110 J-8 J-25 419.50 100 PVC 140 -0.16 0.02 504.13 504.14 0.00 0.01
P-113 J-11 J-28 543.00 100 PVC 140 2.35 0.30 481.75 481.13 0.62 1.15
P-295 J-10 J-11 26.50 100 PVC 140 6.52 0.83 481.96 481.75 0.20 7.61
P-112 J-10 J-27 417.50 100 PVC 140 -1.94 0.25 481.96 482.29 0.34 0.80
P-7 J-7 J-8 487.50 100 PVC 140 0.81 0.10 504.21 504.13 0.08 0.16
P-3 J-3 J-4 399.00 100 PVC 140 0.68 0.09 504.30 504.26 0.05 0.11
P-80 J-2 J-18 370.50 100 PVC 140 3.26 0.41 504.28 503.50 0.78 2.11
P-2 J-2 J-3 26.50 100 PVC 140 -1.96 0.25 504.28 504.30 0.02 0.82
P-98 J-6 J-23 412.00 100 PVC 140 0.58 0.07 504.21 504.18 0.04 0.09
P-5 J-5 J-6 283.50 100 PVC 140 0.82 0.10 504.26 504.21 0.05 0.16
P-88 J-4 J-20 429.50 100 PVC 140 1.41 0.18 504.26 504.07 0.19 0.44
P-269 J-17 PRV-6-In 11.00 100 PVC 140 0.00 0.00 503.91 503.91 0.00 0.00
P-17 J-17 J-18 524.50 100 PVC 140 1.92 0.24 503.91 503.50 0.41 0.79
P-16 J-16 J-17 210.50 100 PVC 140 2.33 0.30 504.15 503.91 0.24 1.13
P-20 J-20 J-21 24.00 100 PVC 140 -1.85 0.24 504.07 504.08 0.02 0.74
P-19 J-19 J-20 398.50 100 PVC 140 -2.88 0.37 503.40 504.07 0.67 1.67
P-18 J-18 J-19 23.50 100 PVC 140 4.79 0.61 503.50 503.40 0.10 4.30
P-225 I-15 I-31 743.50 100 PVC 140 0.66 0.08 481.21 481.13 0.08 0.11
P-11 J-12 J-11 79.00 100 PVC 140 -3.94 0.50 481.52 481.75 0.24 2.99
P-130 J-12 J-29 461.00 100 PVC 140 1.98 0.25 481.52 481.13 0.39 0.84
P-12 J-12 I-13 107.00 100 PVC 140 1.72 0.22 481.52 481.45 0.07 0.65
P-142 I-14 I-96 107.00 100 PVC 140 2.94 0.37 481.45 481.26 0.19 1.74
P-222 I-13 I-30 589.00 100 PVC 140 1.59 0.20 481.45 481.12 0.33 0.56
P-13 I-13 I-14 168.00 100 PVC 140 0.03 0.00 481.45 481.45 0.00 0.00
P-43 J-45 J-46 530.50 100 PVC 140 0.21 0.03 479.20 479.19 0.01 0.01
P-109 J-68 J-72 153.00 100 PVC 140 1.06 0.13 453.66 453.62 0.04 0.26
P-61 J-68 J-69 391.50 100 PVC 140 1.12 0.14 453.66 453.54 0.11 0.29
P-123 J-67 J-71 23.50 100 PVC 140 0.03 0.00 453.52 453.52 0.00 0.00
P-63 J-70 J-71 322.00 100 PVC 140 0.42 0.05 453.54 453.52 0.02 0.05
P-118 J-69 J-73 365.00 100 PVC 140 0.15 0.02 453.54 453.54 0.00 0.01
P-62 J-69 J-70 24.50 100 PVC 140 0.78 0.10 453.54 453.54 0.00 0.15
P-120 J-66 J-70 24.00 100 PVC 140 0.05 0.01 453.54 453.54 0.00 0.00
P-108 J-64 J-68 27.00 100 PVC 140 2.44 0.31 453.69 453.66 0.03 1.23
P-58 J-64 J-65 390.50 100 PVC 140 1.29 0.16 453.69 453.54 0.15 0.38
P-57 J-63 J-64 25.50 100 PVC 140 3.29 0.42 453.75 453.69 0.05 2.14
P-60 J-66 J-67 325.00 100 PVC 140 0.41 0.05 453.54 453.52 0.02 0.05
P-117 J-65 J-69 24.00 100 PVC 140 0.10 0.01 453.54 453.54 0.00 0.00
P-59 J-65 J-66 26.00 100 PVC 140 0.76 0.10 453.54 453.54 0.00 0.14
P-68 J-78 J-79 272.00 100 PVC 140 1.50 0.19 480.81 480.67 0.14 0.50
P-247 J-77 J-129 300.00 100 PVC 140 1.44 0.18 481.12 480.98 0.14 0.47
P-214 J-77 I-30 23.50 100 PVC 140 -0.49 0.06 481.12 481.12 0.00 0.06
P-254 J-81 J-130 138.00 100 PVC 140 3.35 0.43 454.47 454.16 0.31 2.22
P-128 J-80 J-82 392.50 100 PVC 140 1.34 0.17 454.33 454.17 0.16 0.41
P-255 J-79 PRV-3-In 13.00 100 PVC 140 5.22 0.66 480.67 480.61 0.07 5.04
REPORTE DE TUBERIAS EN LA HORA DE MINIMA DEMANDA (4 A.M.)

Gradiente
Longitud Diametro Caudal Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Material Rugosidad hidraulico
(m) (mm) (l/s) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-126 J-76 J-78 397.00 100 PVC 140 1.87 0.24 481.11 480.81 0.30 0.75
P-64 J-72 J-73 454.50 100 PVC 140 0.83 0.11 453.62 453.54 0.08 0.17
P-124 J-71 J-75 549.00 100 PVC 140 0.08 0.01 453.52 453.52 0.00 0.00
P-121 J-70 J-74 374.50 100 PVC 140 0.11 0.01 453.54 453.54 0.00 0.00
P-67 J-76 J-77 276.00 100 PVC 140 -0.34 0.04 481.11 481.12 0.01 0.03
P-66 J-74 J-75 318.00 100 PVC 140 0.42 0.05 453.54 453.52 0.01 0.05
P-65 J-73 J-74 26.50 100 PVC 140 0.59 0.08 453.54 453.54 0.00 0.09
P-277 J-52 PRV-9-In 10.50 100 PVC 140 8.14 1.04 476.06 475.94 0.12 11.47
P-48 J-52 J-53 364.00 100 PVC 140 -3.91 0.50 476.06 477.14 1.08 2.96
P-114 J-50 J-55 437.50 100 PVC 140 1.15 0.15 477.33 477.19 0.13 0.31
P-50 J-54 J-55 390.00 100 PVC 140 -0.58 0.07 477.16 477.19 0.03 0.09
P-279 J-53 PRV-10-In 12.00 100 PVC 140 0.00 0.00 477.14 477.14 0.00 0.00
P-49 J-53 J-54 23.50 100 PVC 140 -2.12 0.27 477.14 477.16 0.02 0.95
P-105 J-49 J-54 439.50 100 PVC 140 2.12 0.27 477.58 477.16 0.42 0.95
P-44 J-47 J-48 361.50 100 PVC 140 1.82 0.23 477.85 477.59 0.26 0.72
P-84 J-46 J-51 600.00 100 PVC 140 0.27 0.03 479.19 479.18 0.01 0.02
P-47 J-45 J-51 820.00 100 PVC 140 0.29 0.04 479.20 479.18 0.02 0.02
P-46 J-49 J-50 388.00 100 PVC 140 1.72 0.22 477.58 477.33 0.25 0.65
P-102 J-48 J-53 438.00 100 PVC 140 2.22 0.28 477.59 477.14 0.45 1.04
P-95 J-47 J-52 438.00 100 PVC 140 4.66 0.59 477.85 476.06 1.79 4.08
P-55 J-60 J-61 337.00 100 PVC 140 0.42 0.05 453.54 453.52 0.02 0.05
P-116 J-59 J-65 414.00 100 PVC 140 0.14 0.02 453.55 453.54 0.00 0.01
P-54 J-59 J-60 27.00 100 PVC 140 0.92 0.12 453.55 453.54 0.01 0.21
P-56 J-62 J-63 360.50 100 PVC 140 2.82 0.36 454.33 453.75 0.58 1.61
P-122 J-61 J-67 413.00 100 PVC 140 -0.01 0.00 453.52 453.52 0.00 0.00
P-119 J-60 J-66 412.50 100 PVC 140 0.08 0.01 453.54 453.54 0.00 0.00
P-107 J-58 J-64 414.50 100 PVC 140 0.93 0.12 453.78 453.69 0.09 0.21
P-97 J-56 J-62 415.50 100 PVC 140 3.25 0.41 455.20 454.33 0.87 2.09
P-51 J-56 J-57 362.50 100 PVC 140 4.47 0.57 455.20 453.83 1.37 3.78
P-281 J-55 PRV-11-In 11.50 100 PVC 140 0.00 0.00 477.19 477.19 0.00 0.00
P-53 J-58 J-59 388.50 100 PVC 140 1.64 0.21 453.78 453.55 0.23 0.59
P-104 J-57 J-63 414.50 100 PVC 140 0.90 0.11 453.83 453.75 0.08 0.19
P-52 J-57 J-58 25.00 100 PVC 140 3.14 0.40 453.83 453.78 0.05 1.97
REPORTE DE TUBERIAS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Gradiente
Diametro Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Longitud (m) Material Rugosidad Caudal (l/s) hidraulico
(mm) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-217 J-122 J-1 1,505.50 350 PVC 140 174.23 1.81 503.11 491.92 11.18 7.43
P-199 J-115 J-116 425.00 350 PVC 140 119.95 1.25 489.70 488.12 1.58 3.72
P-216 T-1 J-122 128.00 350 PVC 140 174.23 1.81 504.06 503.11 0.95 7.43
P-198 J-1 J-115 357.50 350 PVC 140 158.21 1.64 491.92 489.70 2.22 6.22
P-201 J-117 J-118 489.50 300 PVC 140 57.06 0.81 486.84 485.87 0.98 2.00
P-207 J-118 PRV-1-In 566.00 300 PVC 140 32.61 0.46 485.87 485.46 0.40 0.71
P-200 J-116 J-117 305.00 300 PVC 140 85.04 1.20 488.12 486.84 1.27 4.18
P-212 PRV-1-Out I-14 30.50 200 PVC 140 32.61 1.04 481.45 481.29 0.16 5.11
P-284 J-116 J-5 26.00 200 PVC 140 34.91 1.11 488.12 487.97 0.15 5.79
P-283 J-115 J-3 21.00 200 PVC 140 38.26 1.22 489.70 489.55 0.14 6.86
P-35 J-36 J-37 282.00 150 PVC 140 11.40 0.65 478.88 478.04 0.84 2.97
P-286 PRV-12-Out J-34 12.00 150 PVC 140 37.90 2.14 479.85 479.52 0.33 27.38
P-99 J-7 J-24 412.00 150 PVC 140 19.51 1.10 486.47 483.17 3.30 8.02
P-31 J-32 J-33 532.00 150 PVC 140 -8.78 0.50 478.34 479.32 0.97 1.83
P-34 J-35 J-36 26.00 150 PVC 140 -3.64 0.21 478.87 478.88 0.01 0.36
P-33 J-34 J-35 399.00 150 PVC 140 8.26 0.47 479.52 478.87 0.65 1.63
P-32 J-33 J-34 26.00 150 PVC 140 -19.33 1.09 479.32 479.52 0.20 7.88
P-45 J-48 J-49 26.50 150 PVC 140 -0.86 0.05 469.55 469.55 0.00 0.03
P-85 J-3 J-19 374.50 150 PVC 140 28.34 1.60 489.55 483.56 5.99 15.99
P-206 J-1 J-114 19.50 150 PVC 140 16.02 0.91 491.92 491.81 0.11 5.57
P-294 PRV-15-Out J-9 13.00 150 PVC 140 21.24 1.20 483.75 483.63 0.12 9.38
P-292 PRV-14-Out J-49 502.50 150 PVC 140 26.91 1.52 476.85 469.55 7.30 14.53
P-290 J-117 J-7 24.00 150 PVC 140 27.98 1.58 486.84 486.47 0.37 15.62
P-202 J-118 J-8 24.50 150 PVC 140 24.45 1.38 485.87 485.57 0.30 12.17
P-6 J-6 J-7 25.00 150 PVC 140 -2.81 0.16 486.46 486.47 0.01 0.22
P-289 PRV-13-Out J-36 11.50 150 PVC 140 27.28 1.54 479.05 478.88 0.17 14.91
P-91 J-5 J-21 433.50 150 PVC 140 22.99 1.30 487.97 483.26 4.71 10.86
P-4 J-5 J-4 25.50 150 PVC 140 4.80 0.27 487.97 487.95 0.02 0.60
P-293 J-8 PRV-15-In 13.50 150 PVC 140 21.24 1.20 485.57 485.44 0.13 9.38
P-288 J-21 PRV-13-In 10.00 150 PVC 140 27.28 1.54 483.26 483.11 0.15 14.90
P-291 J-24 PRV-14-In 56.50 150 PVC 140 26.91 1.52 483.17 482.34 0.82 14.53
P-285 J-19 PRV-12-In 11.50 150 PVC 140 37.90 2.14 483.56 483.25 0.31 27.38
P-23 J-23 J-24 28.50 150 PVC 140 6.10 0.35 483.19 483.17 0.03 0.93
P-171 I-100 I-107 30.00 100 PVC 140 2.06 0.26 445.93 445.90 0.03 0.90
P-168 I-99 I-106 30.00 100 PVC 140 0.81 0.10 446.35 446.35 0.00 0.16
P-155 I-99 I-100 379.00 100 PVC 140 2.31 0.29 446.35 445.93 0.42 1.12
P-162 I-97 I-104 28.50 100 PVC 140 -3.03 0.39 471.27 471.32 0.05 1.84
P-223 I-96 I-97 726.00 100 PVC 140 5.85 0.74 475.78 471.27 4.51 6.21
P-240 I-97 J-126 299.00 100 PVC 140 2.88 0.37 471.27 470.77 0.50 1.68
P-165 I-98 I-105 29.00 100 PVC 140 1.40 0.18 446.45 446.43 0.01 0.44
P-152 I-98 I-99 91.00 100 PVC 140 2.18 0.28 446.45 446.35 0.09 1.01
P-159 I-101 I-102 1,012.00 100 PVC 140 0.84 0.11 422.72 422.55 0.17 0.17
P-166 I-105 I-85 185.00 100 PVC 140 0.80 0.10 446.43 446.40 0.03 0.16
P-243 I-104 J-127 298.50 100 PVC 140 2.67 0.34 471.32 470.89 0.43 1.45
REPORTE DE TUBERIAS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Gradiente
Diametro Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Longitud (m) Material Rugosidad Caudal (l/s) hidraulico
(mm) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-170 I-105 I-106 91.50 100 PVC 140 2.07 0.26 446.43 446.35 0.08 0.91
P-173 I-106 I-107 379.00 100 PVC 140 2.38 0.30 446.35 445.90 0.45 1.18
P-169 I-106 I-89 187.50 100 PVC 140 0.40 0.05 446.35 446.34 0.01 0.04
P-190 I-102 I-109 35.00 100 PVC 140 0.89 0.11 422.55 422.54 0.01 0.19
P-174 I-101 I-108 30.50 100 PVC 140 0.44 0.06 422.72 422.72 0.00 0.05
P-161 I-103 I-15 191.00 100 PVC 140 5.40 0.69 475.15 474.13 1.02 5.36
P-163 I-104 I-31 190.00 100 PVC 140 -1.15 0.15 471.32 471.38 0.06 0.31
P-224 I-103 I-104 729.50 100 PVC 140 5.34 0.68 475.15 471.32 3.83 5.25
P-73 J-86 J-87 494.00 100 PVC 140 -2.87 0.37 445.59 446.41 0.82 1.67
P-180 I-85 I-89 88.50 100 PVC 140 1.80 0.23 446.40 446.34 0.06 0.71
P-129 J-86 J-90 380.00 100 PVC 140 0.54 0.07 445.59 445.56 0.03 0.07
P-136 J-87 J-91 376.50 100 PVC 140 2.54 0.32 446.41 445.91 0.50 1.33
P-74 J-87 I-88 21.50 100 PVC 140 0.75 0.10 446.41 446.41 0.00 0.14
P-70 J-82 J-83 271.00 100 PVC 140 5.04 0.64 447.99 446.71 1.28 4.71
P-69 J-81 J-80 275.00 100 PVC 140 7.12 0.91 453.17 450.71 2.46 8.95
P-135 J-83 J-87 22.00 100 PVC 140 8.88 1.13 446.71 446.41 0.30 13.47
P-147 I-84 I-98 188.50 100 PVC 140 1.86 0.24 446.59 446.45 0.14 0.75
P-139 I-84 I-88 91.00 100 PVC 140 3.10 0.39 446.59 446.41 0.17 1.92
P-282 PRV-11-Out J-59 12.50 100 PVC 140 8.37 1.07 450.05 449.90 0.15 12.07
P-153 I-92 I-100 191.00 100 PVC 140 0.04 0.00 445.93 445.93 0.00 0.00
P-183 I-94 I-110 54.50 100 PVC 140 1.11 0.14 422.73 422.71 0.02 0.29
P-160 I-96 I-103 28.50 100 PVC 140 11.62 1.48 475.78 475.15 0.63 22.14
P-150 I-88 I-99 188.00 100 PVC 140 1.15 0.15 446.41 446.35 0.06 0.31
P-140 I-88 I-92 378.50 100 PVC 140 2.48 0.32 446.41 445.93 0.48 1.27
P-181 I-89 I-93 379.50 100 PVC 140 1.99 0.25 446.34 446.02 0.32 0.84
P-77 J-91 I-92 20.50 100 PVC 140 -1.98 0.25 445.91 445.93 0.02 0.83
P-76 J-90 J-91 500.00 100 PVC 140 -1.80 0.23 445.56 445.91 0.35 0.70
P-172 I-107 I-93 186.00 100 PVC 140 -1.70 0.22 445.90 446.02 0.12 0.63
P-228 J-120 I-84 188.50 100 PVC 140 5.33 0.68 447.57 446.59 0.99 5.23
P-253 J-130 J-120 19.50 100 PVC 140 10.54 1.34 447.93 447.57 0.36 18.48
P-252 J-130 J-83 261.00 100 PVC 140 5.02 0.64 447.93 446.71 1.22 4.68
P-231 J-120 J-121 190.00 100 PVC 140 5.21 0.66 447.57 446.62 0.95 5.03
P-260 J-132 I-101 143.00 100 PVC 140 1.98 0.25 422.84 422.72 0.12 0.84
P-264 J-132 J-133 188.50 100 PVC 140 1.19 0.15 422.84 422.78 0.06 0.33
P-261 J-131 J-132 30.50 100 PVC 140 3.17 0.40 422.90 422.84 0.06 2.01
P-256 PRV-3-Out J-81 16.00 100 PVC 140 24.23 3.08 454.55 453.17 1.38 86.20
P-258 J-131 I-108 142.50 100 PVC 140 2.49 0.32 422.90 422.72 0.18 1.28
P-242 J-125 J-126 189.50 100 PVC 140 -7.73 0.98 468.79 470.77 1.98 10.42
P-236 I-50 I-85 189.50 100 PVC 140 1.37 0.17 446.48 446.40 0.08 0.42
P-245 J-126 J-127 27.50 100 PVC 140 -4.85 0.62 470.77 470.89 0.12 4.40
P-249 J-129 J-79 95.00 100 PVC 140 19.21 2.45 468.06 462.73 5.33 56.11
P-248 J-127 J-128 188.00 100 PVC 140 -2.19 0.28 470.89 471.08 0.19 1.01
P-234 J-121 J-123 28.00 100 PVC 140 3.14 0.40 446.62 446.56 0.06 1.97
P-230 J-121 I-98 187.50 100 PVC 140 2.07 0.26 446.62 446.45 0.17 0.91
P-250 J-129 J-125 27.00 100 PVC 140 -12.98 1.65 468.06 468.79 0.73 27.17
REPORTE DE TUBERIAS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Gradiente
Diametro Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Longitud (m) Material Rugosidad Caudal (l/s) hidraulico
(mm) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-237 J-123 I-50 186.00 100 PVC 140 1.37 0.17 446.56 446.48 0.08 0.42
P-233 J-123 I-105 189.00 100 PVC 140 1.77 0.23 446.56 446.43 0.13 0.68
P-185 I-110 I-111 936.00 100 PVC 140 0.85 0.11 422.71 422.55 0.17 0.18
P-184 I-110 I-101 131.00 100 PVC 140 -0.34 0.04 422.71 422.72 0.00 0.03
P-189 I-111 I-102 153.00 100 PVC 140 0.22 0.03 422.55 422.55 0.00 0.01
P-280 PRV-10-Out J-57 12.50 100 PVC 140 15.08 1.92 453.15 452.70 0.45 35.84
P-187 I-112 I-95 70.00 100 PVC 140 0.08 0.01 422.64 422.64 0.00 0.00
P-177 I-108 I-109 1,029.50 100 PVC 140 0.84 0.11 422.72 422.54 0.18 0.17
P-265 I-107 PRV-4-In 223.50 100 PVC 140 5.67 0.72 445.90 444.59 1.31 5.86
P-186 I-108 I-112 121.00 100 PVC 140 1.73 0.22 422.72 422.64 0.08 0.65
P-191 I-109 J-113 140.00 100 PVC 140 1.55 0.20 422.54 422.47 0.08 0.54
P-270 PRV-6-Out J-32 14.00 100 PVC 140 1.42 0.18 478.35 478.34 0.01 0.45
P-266 PRV-4-Out J-131 23.50 100 PVC 140 5.67 0.72 423.04 422.90 0.14 5.86
P-263 J-133 I-94 142.00 100 PVC 140 1.19 0.15 422.78 422.73 0.05 0.33
P-188 I-112 J-113 1,103.00 100 PVC 140 0.80 0.10 422.64 422.47 0.17 0.16
P-278 PRV-9-Out J-56 13.50 100 PVC 140 14.34 1.83 455.35 454.91 0.44 32.68
P-197 J-114 J-2 322.50 100 PVC 140 6.34 0.81 491.81 489.48 2.33 7.22
P-196 J-114 J-16 218.00 100 PVC 140 9.04 1.15 491.81 488.78 3.03 13.91
P-246 I-31 J-128 301.00 100 PVC 140 2.19 0.28 471.38 471.08 0.30 1.01
P-238 I-30 J-125 300.50 100 PVC 140 5.25 0.67 470.32 468.79 1.53 5.09
P-144 I-30 I-97 189.50 100 PVC 140 -5.20 0.66 470.32 471.27 0.95 5.00
P-87 J-34 J-41 438.50 100 PVC 140 8.09 1.03 479.52 474.56 4.96 11.32
P-82 J-33 J-40 436.50 100 PVC 140 7.92 1.01 479.32 474.56 4.76 10.90
P-37 J-32 J-39 449.00 100 PVC 140 6.93 0.88 478.34 474.53 3.82 8.50
P-131 J-29 J-77 25.00 100 PVC 140 4.35 0.55 470.25 470.16 0.09 3.59
P-24 J-24 J-25 416.50 100 PVC 140 -2.67 0.34 483.17 483.77 0.61 1.45
P-22 J-22 J-23 93.50 100 PVC 140 0.36 0.05 483.20 483.19 0.00 0.04
P-21 J-21 J-22 278.50 100 PVC 140 0.99 0.13 483.26 483.20 0.06 0.23
P-125 J-28 J-76 31.50 100 PVC 140 7.41 0.94 470.05 469.75 0.30 9.63
P-28 J-28 J-29 295.00 100 PVC 140 -1.75 0.22 470.05 470.25 0.20 0.67
P-26 J-26 J-27 375.50 100 PVC 140 6.24 0.79 478.99 476.35 2.63 7.01
P-41 J-42 J-43 26.00 100 PVC 140 13.48 1.72 471.94 471.18 0.76 29.14
P-40 J-41 J-42 397.50 100 PVC 140 6.03 0.77 474.56 471.94 2.62 6.59
P-83 J-40 J-46 26.00 100 PVC 140 4.68 0.60 474.56 474.45 0.11 4.12
P-101 J-44 J-48 24.50 100 PVC 140 11.66 1.48 470.09 469.55 0.55 22.26
P-94 J-43 J-47 25.00 100 PVC 140 17.80 2.27 471.18 469.96 1.22 48.72
P-42 J-43 J-44 362.00 100 PVC 140 3.95 0.50 471.18 470.09 1.09 3.00
P-39 J-40 J-41 26.00 100 PVC 140 0.17 0.02 474.56 474.56 0.00 0.01
P-36 J-37 J-38 122.00 100 PVC 140 10.47 1.33 478.04 475.81 2.23 18.27
P-93 J-36 J-43 438.50 100 PVC 140 10.25 1.31 478.88 471.18 7.70 17.55
P-90 J-35 J-42 439.50 100 PVC 140 9.67 1.23 478.87 471.94 6.93 15.77
P-195 J-39 J-45 26.00 100 PVC 140 3.99 0.51 474.53 474.45 0.08 3.06
P-38 J-39 J-40 541.00 100 PVC 140 -0.44 0.06 474.53 474.56 0.03 0.05
P-100 J-38 J-44 361.00 100 PVC 140 9.70 1.23 475.81 470.09 5.72 15.84
P-111 J-9 J-26 415.50 100 PVC 140 8.03 1.02 483.63 478.99 4.64 11.17
REPORTE DE TUBERIAS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Gradiente
Diametro Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Longitud (m) Material Rugosidad Caudal (l/s) hidraulico
(mm) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-9 J-9 J-10 375.50 100 PVC 140 11.16 1.42 483.63 475.91 7.72 20.55
P-110 J-8 J-25 419.50 100 PVC 140 4.78 0.61 485.57 483.77 1.80 4.28
P-113 J-11 J-28 543.00 100 PVC 140 7.47 0.95 475.35 470.05 5.30 9.77
P-295 J-10 J-11 26.50 100 PVC 140 11.32 1.44 475.91 475.35 0.56 21.08
P-112 J-10 J-27 417.50 100 PVC 140 -2.24 0.29 475.91 476.35 0.44 1.06
P-7 J-7 J-8 487.50 100 PVC 140 3.03 0.39 486.47 485.57 0.90 1.85
P-3 J-3 J-4 399.00 100 PVC 140 4.62 0.59 489.55 487.95 1.60 4.02
P-80 J-2 J-18 370.50 100 PVC 140 9.22 1.17 489.48 484.14 5.35 14.43
P-2 J-2 J-3 26.50 100 PVC 140 -3.73 0.47 489.48 489.55 0.07 2.70
P-98 J-6 J-23 412.00 100 PVC 140 6.67 0.85 486.46 483.19 3.27 7.94
P-5 J-5 J-6 283.50 100 PVC 140 5.37 0.68 487.97 486.46 1.50 5.30
P-88 J-4 J-20 429.50 100 PVC 140 7.74 0.99 487.95 483.47 4.48 10.44
P-269 J-17 PRV-6-In 11.00 100 PVC 140 1.42 0.18 486.38 486.38 0.01 0.45
P-17 J-17 J-18 524.50 100 PVC 140 4.78 0.61 486.38 484.14 2.24 4.28
P-16 J-16 J-17 210.50 100 PVC 140 8.12 1.03 488.78 486.38 2.40 11.40
P-20 J-20 J-21 24.00 100 PVC 140 7.00 0.89 483.47 483.26 0.21 8.66
P-19 J-19 J-20 398.50 100 PVC 140 1.02 0.13 483.56 483.47 0.10 0.24
P-18 J-18 J-19 23.50 100 PVC 140 12.24 1.56 484.14 483.56 0.57 24.37
P-225 I-15 I-31 743.50 100 PVC 140 4.41 0.56 474.13 471.38 2.75 3.69
P-11 J-12 J-11 79.00 100 PVC 140 -2.75 0.35 475.23 475.35 0.12 1.53
P-130 J-12 J-29 461.00 100 PVC 140 7.89 1.00 475.23 470.25 4.99 10.82
P-12 J-12 I-13 107.00 100 PVC 140 -6.25 0.80 475.23 475.98 0.75 7.02
P-142 I-14 I-96 107.00 100 PVC 140 18.34 2.34 481.29 475.78 5.51 51.52
P-222 I-13 I-30 589.00 100 PVC 140 7.40 0.94 475.98 470.32 5.66 9.61
P-13 I-13 I-14 168.00 100 PVC 140 -14.09 1.79 475.98 481.29 5.31 31.61
P-43 J-45 J-46 530.50 100 PVC 140 -0.08 0.01 474.45 474.45 0.00 0.00
P-109 J-68 J-72 153.00 100 PVC 140 3.33 0.42 449.71 449.37 0.34 2.19
P-61 J-68 J-69 391.50 100 PVC 140 3.01 0.38 449.71 449.00 0.71 1.82
P-123 J-67 J-71 23.50 100 PVC 140 1.00 0.13 448.81 448.80 0.01 0.24
P-63 J-70 J-71 322.00 100 PVC 140 1.53 0.20 448.97 448.80 0.17 0.52
P-118 J-69 J-73 365.00 100 PVC 140 1.21 0.15 449.00 448.88 0.12 0.33
P-62 J-69 J-70 24.50 100 PVC 140 2.33 0.30 449.00 448.97 0.03 1.13
P-120 J-66 J-70 24.00 100 PVC 140 1.73 0.22 448.99 448.97 0.02 0.66
P-108 J-64 J-68 27.00 100 PVC 140 7.54 0.96 449.98 449.71 0.27 9.95
P-58 J-64 J-65 390.50 100 PVC 140 3.55 0.45 449.98 449.02 0.96 2.46
P-57 J-63 J-64 25.50 100 PVC 140 8.26 1.05 450.28 449.98 0.30 11.76
P-60 J-66 J-67 325.00 100 PVC 140 1.58 0.20 448.99 448.81 0.18 0.55
P-117 J-65 J-69 24.00 100 PVC 140 1.84 0.23 449.02 449.00 0.02 0.73
P-59 J-65 J-66 26.00 100 PVC 140 2.34 0.30 449.02 448.99 0.03 1.14
P-68 J-78 J-79 272.00 100 PVC 140 6.71 0.85 464.91 462.73 2.18 8.03
P-247 J-77 J-129 300.00 100 PVC 140 6.23 0.79 470.16 468.06 2.10 6.99
P-214 J-77 I-30 23.50 100 PVC 140 -6.28 0.80 470.16 470.32 0.17 7.09
P-254 J-81 J-130 138.00 100 PVC 140 15.55 1.98 453.17 447.93 5.24 37.97
P-128 J-80 J-82 392.50 100 PVC 140 6.20 0.79 450.71 447.99 2.72 6.93
P-255 J-79 PRV-3-In 13.00 100 PVC 140 24.23 3.08 462.73 461.61 1.12 86.20
REPORTE DE TUBERIAS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Gradiente
Diametro Velocidad Carga hidraulica Carga hidraulica Perdida de
Tramo Nudo arriba Nudo abajo Longitud (m) Material Rugosidad Caudal (l/s) hidraulico
(mm) (m/s) arriba (m) abajo (m) carga (m)
(m/km)
P-126 J-76 J-78 397.00 100 PVC 140 8.41 1.07 469.75 464.91 4.83 12.18
P-64 J-72 J-73 454.50 100 PVC 140 2.29 0.29 449.37 448.88 0.50 1.10
P-124 J-71 J-75 549.00 100 PVC 140 0.84 0.11 448.80 448.71 0.09 0.17
P-121 J-70 J-74 374.50 100 PVC 140 1.13 0.14 448.97 448.86 0.11 0.30
P-67 J-76 J-77 276.00 100 PVC 140 -2.70 0.34 469.75 470.16 0.41 1.49
P-66 J-74 J-75 318.00 100 PVC 140 1.46 0.19 448.86 448.71 0.15 0.48
P-65 J-73 J-74 26.50 100 PVC 140 1.66 0.21 448.88 448.86 0.02 0.61
P-277 J-52 PRV-9-In 10.50 100 PVC 140 14.34 1.83 457.23 456.89 0.34 32.68
P-48 J-52 J-53 364.00 100 PVC 140 -2.87 0.37 457.23 457.83 0.61 1.66
P-114 J-50 J-55 437.50 100 PVC 140 8.02 1.02 462.21 457.33 4.88 11.15
P-50 J-54 J-55 390.00 100 PVC 140 3.01 0.38 458.04 457.33 0.71 1.82
P-279 J-53 PRV-10-In 12.00 100 PVC 140 15.08 1.92 457.83 457.40 0.43 35.84
P-49 J-53 J-54 23.50 100 PVC 140 -7.06 0.90 457.83 458.04 0.21 8.81
P-105 J-49 J-54 439.50 100 PVC 140 12.72 1.62 469.55 458.04 11.51 26.18
P-44 J-47 J-48 361.50 100 PVC 140 2.35 0.30 469.96 469.55 0.41 1.15
P-84 J-46 J-51 600.00 100 PVC 140 1.41 0.18 474.45 474.18 0.27 0.45
P-47 J-45 J-51 820.00 100 PVC 140 1.19 0.15 474.45 474.18 0.27 0.33
P-46 J-49 J-50 388.00 100 PVC 140 10.67 1.36 469.55 462.21 7.34 18.92
P-102 J-48 J-53 438.00 100 PVC 140 12.87 1.64 469.55 457.83 11.71 26.74
P-95 J-47 J-52 438.00 100 PVC 140 13.46 1.71 469.96 457.23 12.73 29.07
P-55 J-60 J-61 337.00 100 PVC 140 3.16 0.40 449.61 448.94 0.67 1.99
P-116 J-59 J-65 414.00 100 PVC 140 3.28 0.42 449.90 449.02 0.88 2.14
P-54 J-59 J-60 27.00 100 PVC 140 7.86 1.00 449.90 449.61 0.29 10.73
P-56 J-62 J-63 360.50 100 PVC 140 4.58 0.58 451.70 450.28 1.43 3.96
P-122 J-61 J-67 413.00 100 PVC 140 1.17 0.15 448.94 448.81 0.13 0.32
P-119 J-60 J-66 412.50 100 PVC 140 2.73 0.35 449.61 448.99 0.62 1.51
P-107 J-58 J-64 414.50 100 PVC 140 5.13 0.65 452.00 449.98 2.02 4.88
P-97 J-56 J-62 415.50 100 PVC 140 6.57 0.84 454.91 451.70 3.20 7.71
P-51 J-56 J-57 362.50 100 PVC 140 5.78 0.74 454.91 452.70 2.21 6.09
P-281 J-55 PRV-11-In 11.50 100 PVC 140 8.37 1.07 457.33 457.20 0.14 12.07
P-53 J-58 J-59 388.50 100 PVC 140 5.42 0.69 452.00 449.90 2.10 5.41
P-104 J-57 J-63 414.50 100 PVC 140 5.66 0.72 452.70 450.28 2.43 5.85
P-52 J-57 J-58 25.00 100 PVC 140 13.21 1.68 452.70 452.00 0.70 28.07
REPORTE DE VALVULAS EN LA HORA DE MINIMA DEMANDA ( 4 A.M.)

Caudal Presion Entrada Gradiente Hidraulico Presion Salida Gradiente Hidraulico Perdida de
Codigo
(l/s) (m.c.a.) entrada (m) (m.c.a.) salida (m) Carga (m)
PRV-1 PRV-1 2.94 42.66 504.17 20.00 481.45 22.72
PRV-3 PRV-3 5.22 45.99 480.61 20.00 454.55 26.06
PRV-4 PRV-4 1.22 45.85 453.97 15.00 423.04 30.93
PRV-6 PRV-6 0.00 45.50 503.91 21.28 479.63 0.00
PRV-9 PRV-9 8.14 40.54 475.94 20.00 455.35 20.59
PRV-10 PRV-10 0.00 43.93 477.14 20.67 453.83 0.00
PRV-11 PRV-11 0.00 47.07 477.19 23.49 453.55 0.00
PRV-12 PRV-12 17.51 43.41 503.32 20.00 479.85 23.47
PRV-13 PRV-13 2.65 44.97 504.08 20.00 479.05 25.03
PRV-14 PRV-14 0.00 47.26 504.18 20.73 477.58 0.00
PRV-15 PRV-15 8.66 40.31 504.11 20.00 483.75 20.36
REPORTE DE VALVULAS EN LA HORA DE MAXIMA DEMANDA (11 A.M.)

Presion Entrada Gradiente Hidraulico Presion Salida Gradiente Hidraulico Perdida de Carga
Codigo Caudal (l/s)
(m.c.a.) entrada (m) (m.c.a.) salida (m) (m)
PRV-1 PRV-1 32.61 24.00 485.46 20.00 481.45 4.01
PRV-3 PRV-3 24.23 27.04 461.61 20.00 454.55 7.06
PRV-4 PRV-4 5.67 36.50 444.59 15.00 423.04 21.56
PRV-6 PRV-6 1.42 28.01 486.38 20.00 478.35 8.03
PRV-9 PRV-9 14.34 21.53 456.89 20.00 455.35 1.54
PRV-10 PRV-10 15.08 24.24 457.40 20.00 453.15 4.25
PRV-11 PRV-11 8.37 27.13 457.20 20.00 450.05 7.14
PRV-12 PRV-12 37.90 23.39 483.25 20.00 479.85 3.40
PRV-13 PRV-13 27.28 24.05 483.11 20.00 479.05 4.06
PRV-14 PRV-14 26.91 25.48 482.34 20.00 476.85 5.49
PRV-15 PRV-15 21.24 21.69 485.44 20.00 483.75 1.69