Datos:

Concreto (f'c): 210 kg/m²


Peso del acabado: 100 kg/m²
Peso de los muros de fachada: 500 kg/ml
Peso de la tabiquería: 100 kg/m²
Peso de parapeto: 150 kg/m²
Peso de la losa aligerada (h=0.35): 350 kg/m²
Sobrecarga azotea: 150 kg/m²
Sobrecarga (otros niveles): 250 kg/m²

COLUMNAS NIVEL 1 - MAZANINE


B H N° COL Altura P. especifico PESO
C-1 0.9 0.9 7 3.5 2.4 47.63
C-2 0.9 0.9 1 3.5 2.4 6.80
C-3 0.8 0.8 3 3.5 2.4 16.13
C-4 0.6 0.6 1 3.5 2.4 3.02
C-5 0.6 0.67 2 3.5 2.4 6.75
C-6 0.6 0.6 1 3.5 2.4 3.02
83.36
MEZANINE - NIVEL 2
B H N° COL Altura P. especifico PESO
C-1 0.9 0.9 7 3.75 2.4 51.03
C-2 0.9 0.9 1 3.75 2.4 7.29
C-3 0.8 0.8 3 3.75 2.4 17.28
C-4 0.6 0.6 1 3.75 2.4 3.24
C-5 0.6 0.67 2 3.75 2.4 7.24
C-6 0.6 0.6 1 3.75 2.4 3.24
89.32
NIVEL 2-11
B H N° COL Altura P. especifico PESO
C-1 0.9 0.9 7 4 2.4 54.43
C-2 0.9 0.9 1 4 2.4 7.78
C-3 0.8 0.8 3 4 2.4 18.43
C-4 0.6 0.6 1 4 2.4 3.46
C-5 0.6 0.67 2 4 2.4 7.72
C-6 0.6 0.6 1 4 2.4 3.46
95.27
NIVEL 11-12
B H N° COL Altura P. especifico PESO
C-1 0.9 0.9 7 4 2.4 54.43
C-2 0.9 0.9 1 4 2.4 7.78
C-3 0.8 0.8 3 4 2.4 18.43
C-4 0.6 0.6 1 2 2.4 1.73
C-5 0.6 0.67 2 2 2.4 3.86
C-6 0.6 0.6 1 4 2.4 3.46
C-4' 0.3 0.6 1 2.1 2.4 0.91
C-5' 0.3 0.6 2 2.1 2.4 1.81
92.40
NIVEL 12-14
B H N° COL Altura P. especifico PESO
C-1 0.9 0.9 7 4 2.4 54.43
C-2 0.9 0.9 1 4 2.4 7.78
C-3 0.8 0.8 3 4 2.4 18.43
C-6 0.6 0.6 1 4 2.4 3.46
C-4' 0.3 0.6 1 4.2 2.4 1.81
C-5' 0.3 0.6 2 4.2 2.4 3.63
89.54
NIVEL 14-15
B H N° COL Altura P. especifico PESO
C-1 0.9 0.9 7 4 2.4 54.43
C-2 0.9 0.9 1 4 2.4 7.78
C-3 0.8 0.8 3 4 2.4 18.43
C-6 0.6 0.6 1 4 2.4 3.46
C-4' 0.3 0.6 1 2.1 2.4 0.91
C-5' 0.3 0.6 2 2.1 2.4 1.81
86.82
NIVEL 15-16
B H N° COL Altura P. especifico PESO
C-1 0.9 0.9 7 2 2.4 27.22
C-2 0.9 0.9 1 2 2.4 3.89
C-3 0.8 0.8 3 2 2.4 9.22
C-6 0.6 0.6 1 2 2.4 1.73
42.05

COLUMNAS DE ESCALERA

NIVEL 1 - MEZANINE
B H N° COL Altura P. especifico PESO
C-E-1 0.25 0.5 2 3.5 2.4 2.10
C-E-2 0.4 0.4 1 3.5 2.4 1.34
C-E-2' 0.4 0.5 1 3.5 2.4 1.68
C-E-3 0.39 0.36 1 3.5 2.4 1.18
C-P-1 0.35 0.6 1 3.5 2.4 1.76
C-P-2 0.2 0.4 1 3.5 2.4 0.67
8.74

MEZANINE - NIVEL 2
B H N° COL Altura P. especifico PESO
C-E-1 0.25 0.5 2 3.75 2.4 2.25
C-E-2 0.4 0.4 1 3.75 2.4 1.44
C-E-2' 0.4 0.5 1 3.75 2.4 1.80
C-E-3 0.39 0.36 1 3.75 2.4 1.26
C-P-1 0.35 0.6 1 3.75 2.4 1.89
C-P-2 0.2 0.4 1 3.75 2.4 0.72
9.36

NIVEL 2 - NIVEL 15
B H N° COL Altura P. especifico PESO
C-E-1 0.25 0.5 2 4 2.4 2.40
C-E-2 0.4 0.4 1 4 2.4 1.54
C-E-2' 0.4 0.5 1 4 2.4 1.92
C-E-3 0.39 0.36 1 4 2.4 1.35
C-P-1 0.35 0.6 1 4 2.4 2.02
C-P-2 0.2 0.4 1 4 2.4 0.77
9.99

NIVEL 16
B H N° COL Altura P. especifico PESO
C-E-1 0.25 0.5 2 2 2.4 1.20
C-E-2 0.4 0.4 1 2 2.4 0.77
C-E-2' 0.4 0.5 1 2 2.4 0.96
C-E-3 0.39 0.36 1 2 2.4 0.67
C-P-1 0.35 0.6 1 2 2.4 1.01
C-P-2 0.2 0.4 1 2 2.4 0.38
4.99

PLACAS

NIVEL 1 - MEZANINE
B H N° PLAC Altura P. especifico PESO
PL-1 3 0.3 2 2.75 2.4 11.88
PL-2 5.3 0.3 1 2.75 2.4 10.49
PL-3 7 0.25 1 2.75 2.4 11.55
PL-4 10.8 0.25 1 2.75 2.4 17.82
PL-A1 4.78 0.35 1 3.5 2.4 14.05
PL-A2 4.83 0.3 2 3.5 2.4 24.34
PL-A3 1.5 0.35 2 3.5 2.4 8.82
CA 0.65 0.4 2 3.5 2.4 4.37
90.14

MEZANINE - NIVEL 2
B H N° PLAC Altura P. especifico PESO
PL-1 3 0.3 2 3 2.4 12.96
PL-2 5.3 0.3 1 3 2.4 11.45
PL-3 7 0.25 1 3 2.4 12.60
PL-4 10.8 0.25 1 3 2.4 19.44
PL-A1 4.78 0.35 1 3.75 2.4 15.06
PL-A2 4.83 0.3 2 3.75 2.4 26.08
PL-A3 1.5 0.35 2 3.75 2.4 9.45
CA 0.65 0.4 2 3.75 2.4 4.68
111.72

NIVEL 2 - NIVEL 15
B H N° PLAC Altura P. especifico PESO
PL-1 3 0.3 2 3.25 2.4 14.04
PL-2 5.3 0.3 1 3.25 2.4 12.40
PL-3 7 0.25 1 3.25 2.4 13.65
PL-4 10.8 0.25 1 3.25 2.4 21.06
PL-A1 4.78 0.35 1 4 2.4 16.06
PL-A2 4.83 0.3 2 4 2.4 27.82
PL-A3 1.5 0.35 2 4 2.4 10.08
CA 0.65 0.4 2 4 2.4 4.99
120.11

NIVEL 16
B H N° PLAC Altura P. especifico PESO
PL-1 3 0.3 2 2 2.4 8.64
PL-2 5.3 0.3 1 2 2.4 7.63
PL-3 7 0.25 1 2 2.4 8.40
PL-4 10.8 0.25 1 2 2.4 12.96
PL-A1 4.78 0.35 1 2 2.4 8.03
PL-A2 4.83 0.3 2 2 2.4 13.91
PL-A3 1.5 0.35 2 2 2.4 5.04
CA 0.65 0.4 2 2 2.4 2.50
67.11

VIGAS PRINCIPALES MEZANIME

MEZANINE
B H LONG. N° Elem. P. especifico PESO
V-P ---EJE 1 0.4 0.75 19.04 1 2.4 13.71
V-P ---EJE 2 0.4 0.75 21.19 1 2.4 15.26
V-P --- EJE 3 0.4 0.75 21.39 1 2.4 15.40
V-P ---EJE 4 0.4 0.75 7.35 1 2.4 5.29
V-P ---EJE 5 0.4 0.75 8.15 1 2.4 5.87
V-P ---EJE 6 0.4 0.75 17 1 2.4 12.24
V-P ---ENTRE EJE D Y E 0.4 0.75 3.06 2 2.4 4.41
V-P ---ESC 0.4 0.75 8.5 2 2.4 12.24
84.41

VIGAS SECUNDARIAS MEZANIME

MEZANINE
B H LONG. N° Elem. P. especifico PESO
V-S ---EJE A´ 0.25 0.6 15.7 1 2.4 5.65
V-S ---EJE A 0.4 0.75 32.99 1 2.4 23.75
V-S ---EJE B´ 0.35 1.5 6.5 1 2.4 8.19
V-S ---EJE B 0.4 0.75 18.35 1 2.4 13.21
V-S ---EJE C 0.4 0.75 36.35 1 2.4 26.17
V-S ---ESC 0.3 0.7 4.58 1 2.4 2.31
V-S ---EJE C´ 0.3 0.7 3.69 1 2.4 1.86
V-B---DUC 0.25 0.3 3.5 4 2.4 2.52
V-S ---EJE D 0.4 0.75 18.25 1 2.4 13.14
V-S ---EJE E 0.4 0.75 10.6 1 2.4 7.63
V-B---EJE 0 Y 7 0.25 0.6 17.59 2 2.4 12.66
V-B---ENTRE EJE 3-3´ ; 4 Y 5 0.3 0.6 7.8 2 2.4 6.74
V-B---BALCON 0.15 0.75 6.7 1 2.4 1.81
125.65

VIGAS PRINCIPALES 2do NIVEL

2do NIVEL
B H LONG. N° Elem. P. especifico PESO
V-P ---EJE 1 0.4 0.75 18.35 1 2.4 13.21
V-P ---EJE 2 0.4 0.75 20.5 1 2.4 14.76
V-P --- EJE 3 0.4 0.75 23.05 1 2.4 16.60
V-P ---EJE 4 0.4 0.75 23.05 1 2.4 16.60
V-P ---EJE 5 0.4 0.75 26.3 1 2.4 18.94
V-P ---EJE 6 0.4 0.75 20.7 1 2.4 14.90
V-P ---ENTRE EJE D Y E 0.4 0.75 3.06 2 2.4 4.41
V-P ---ESC 0.4 0.75 8.5 2 2.4 12.24
111.65

VIGAS SECUNDARIAS 2do NIVEL

2do NIVEL
B H LONG. N° Elem. P. especifico PESO
V-S ---EJE FUERA A´ 0.15 0.75 21.25 1 2.4 5.74
V-S ---ENTRE A´ Y A 0.25 0.6 15.3 1 2.4 5.51
V-S ---EJE A 0.4 0.75 35.09 1 2.4 25.26
V-S ---EJE B´ 0.35 1.5 6.5 1 2.4 8.19
V-S ---EJE B 0.4 0.75 34.55 1 2.4 24.88
V-S ---EJE C 0.4 0.75 34.55 1 2.4 24.88
V-S ---ESCALERA 0.3 0.7 4.58 1 2.4 2.31
V-S ---EJE C´ 0.3 0.7 3.69 1 2.4 1.86
V-B---DUC 0.25 0.3 3.5 4 2.4 2.52
V-S ---EJE D 0.4 0.75 18.25 1 2.4 13.14
V-S ---EJE E 0.4 0.75 10.6 1 2.4 7.63
V-B---ENTRE 1 Y 0 0.25 0.6 16.73 1 2.4 6.02
V-B---ENTRE 7 Y 6 0.25 0.6 19.35 1 2.4 6.97
V-S---ENTRE EJE 3-3´ ; 4 Y 5 0.3 0.6 7.8 2 2.4 6.74
141.64

VIGAS PRINCIPALES 3er al 12avo NIVEL

3er al 12avo NIVEL


B H LONG. N° Elem. P. especifico PESO
V-P ---EJE 1 0.4 0.75 17.3 1 2.4 12.46
V-P ---EJE 2 0.4 0.75 19.45 1 2.4 14.00
V-P --- EJE 3 0.4 0.75 19.65 1 2.4 14.15
V-P ---EJE 4 0.4 0.75 19.65 1 2.4 14.15
V-P ---EJE 5 0.4 0.75 22.9 1 2.4 16.49
V-P ---EJE 6 0.4 0.75 17.66 1 2.4 12.72
V-P ---ENTRE EJE D Y E 0.4 0.75 3.06 2 2.4 4.41
V-P ---ESC 0.4 0.75 8.5 2 2.4 12.24
100.61

VIGAS SECUNDARIAS 3er al 12avo NIVEL

3er al 12avo NIVEL


B H LONG. N° Elem. P. especifico PESO
V-S ---EJE A 0.4 0.75 30.69 1 2.4 22.10
V-S ---EJE B´ 0.35 1.5 6.5 1 2.4 8.19
V-S ---EJE B 0.4 0.75 30.15 1 2.4 21.71
V-S ---EJE C 0.4 0.75 30.15 1 2.4 21.71
V-S ---ESCALERA 0.3 0.7 4.58 1 2.4 2.31
V-S ---EJE C´ 0.3 0.7 3.69 1 2.4 1.86
V-B---DUC 0.25 0.3 3.5 4 2.4 2.52
V-S ---EJE D 0.4 0.75 18.25 1 2.4 13.14
V-S ---EJE E 0.4 0.75 10.6 1 2.4 7.63
V-S---ENTRE EJE 3-3´ ; 4 Y 5 0.3 0.6 7.8 2 2.4 6.74
107.90

VIGAS PRINCIPALES 13 NIVEL

13 NIVEL
B H LONG. N° Elem. P. especifico PESO
V-P ---EJE 1 0.4 0.75 17.3 1 2.4 12.46
V-P ---EJE 2 0.4 0.75 19.45 1 2.4 14.00
V-P --- EJE 3 0.4 0.75 19.65 1 2.4 14.15
V-P ---EJE 4 0.4 0.75 19.65 1 2.4 14.15
V-P ---EJE 5 0.4 0.75 22.9 1 2.4 16.49
V-P ---EJE 6 0.4 0.75 17.66 1 2.4 12.72
V-P ---ENTRE EJE D Y D´´ 0.4 0.75 2.29 2 2.4 3.30
V-P ---ESC 0.4 0.75 8.5 2 2.4 12.24
99.50

VIGAS SECUNDARIAS 13 NIVEL

13 NIVEL
B H LONG. N° Elem. P. especifico PESO
V-S ---EJE A 0.4 0.75 30.69 1 2.4 22.10
V-S ---EJE B´ 0.35 1.5 6.5 1 2.4 8.19
V-S ---EJE B 0.4 0.75 30.15 1 2.4 21.71
V-S ---EJE C 0.4 0.75 30.15 1 2.4 21.71
V-S ---ESCALERA 0.3 0.7 4.58 1 2.4 2.31
V-S ---EJE C´ 0.3 0.7 3.69 1 2.4 1.86
V-B---DUC 0.25 0.3 3.5 4 2.4 2.52
V-S ---EJE D 0.4 0.75 18.25 1 2.4 13.14
V-S ---EJE D´´ 0.4 0.75 12.02 1 2.4 8.65
V-S---ENTRE EJE 3-3´ ; 4 Y 5 0.3 0.6 7.8 2 2.4 6.74
108.92
VIGAS PRINCIPALES 14 NIVEL

14 NIVEL
B H LONG. N° Elem. P. especifico PESO
V-P ---EJE 1 0.4 0.75 17.3 1 2.4 12.46
V-P ---EJE 2 0.4 0.75 19.45 1 2.4 14.00
V-P --- EJE 3 0.4 0.75 19.65 1 2.4 14.15
V-P ---EJE 4 0.4 0.75 19.65 1 2.4 14.15
V-P ---EJE 5 0.4 0.75 22.9 1 2.4 16.49
V-P ---EJE 6 0.4 0.75 17.66 1 2.4 12.72
V-P ---ENTRE EJE D Y D´´ 0.4 0.75 1.01 2 2.4 1.45
V-P ---ESC 0.4 0.75 8.5 2 2.4 12.24
97.65

VIGAS SECUNDARIAS 14 NIVEL

14 NIVEL
B H LONG. N° Elem. P. especifico PESO
V-S ---EJE A 0.4 0.75 30.69 1 2.4 22.10
V-S ---EJE B´ 0.35 1.5 6.5 1 2.4 8.19
V-S ---EJE B 0.4 0.75 30.15 1 2.4 21.71
V-S ---EJE C 0.4 0.75 30.15 1 2.4 21.71
V-S ---ESCALERA 0.3 0.7 4.58 1 2.4 2.31
V-S ---EJE C´ 0.3 0.7 3.69 1 2.4 1.86
V-B---DUC 0.25 0.3 3.5 4 2.4 2.52
V-S ---EJE D 0.4 0.75 18.25 1 2.4 13.14
V-S ---EJE D´´ 0.4 0.75 12.72 1 2.4 9.16
V-S---ENTRE EJE 3-3´ ; 4 Y 5 0.3 0.6 7.8 2 2.4 6.74
109.43

VIGAS PRINCIPALES 15 Y 16 NIVEL

15 Y 16 NIVEL
B H LONG. N° Elem. P. especifico PESO
V-P ---EJE 1 0.4 0.75 17.3 1 2.4 12.46
V-P ---EJE 2 0.4 0.75 19.45 1 2.4 14.00
V-P --- EJE 3 0.4 0.75 19.65 1 2.4 14.15
V-P ---EJE 4 0.4 0.75 19.65 1 2.4 14.15
V-P ---EJE 5 0.4 0.75 22.9 1 2.4 16.49
V-P ---EJE 6 0.4 0.75 17.66 1 2.4 12.72
V-P ---ESC 0.4 0.75 8.5 2 2.4 12.24
96.20

VIGAS SECUNDARIAS 15 Y 16 NIVEL

15 Y 16 NIVEL
B H LONG. N° Elem. P. especifico PESO
V-S ---EJE A 0.4 0.75 30.69 1 2.4 22.10
V-S ---EJE B´ 0.35 1.5 6.5 1 2.4 8.19
V-S ---EJE B 0.4 0.75 30.15 1 2.4 21.71
V-S ---EJE C 0.4 0.75 30.15 1 2.4 21.71
V-S ---ESCALERA 0.3 0.7 4.58 1 2.4 2.31
V-S ---EJE C´ 0.3 0.7 3.69 1 2.4 1.86
V-B---DUC 0.25 0.3 3.5 4 2.4 2.52
V-S ---EJE D 0.4 0.75 18.25 1 2.4 13.14
V-S---ENTRE EJE 3-3´ ; 4 Y 5 0.3 0.6 7.8 2 2.4 6.74
100.27

LOSA MEZANIME

B L N° Elem. P. especifico PESO


A1 6.55 8.1 1 0.35 18.57
A2 6.55 8 1 0.35 18.34
A3 5.25 6.35 1 0.35 11.67
A4 6.35 8 1 0.35 17.78
A5 6.35 7.8 1 0.35 17.34
A6 1 9.27 1 0.35 3.24
A7 4.2 7.8 1 0.35 11.47
A8 1.9 7.8 1 0.35 5.19
A9 3.05 4.55 2 0.35 9.71
A10 3.05 2.15 2 0.35 4.59
117.89 Tn

LOSA 2do NIVEL

B L N° Elem. P. especifico PESO


A1 6.55 8.1 2 0.35 37.14
A2 6.55 8 2 0.35 36.68
A3 5.25 6.35 2 0.35 23.34
A4 6.35 8 3 0.35 53.34
A5 6.35 7.8 1 0.35 17.34
A6 6.35 8.1 1 0.35 18.00
A7 4.2 7.8 1 0.35 11.47
A8 1.9 7.8 1 0.35 5.19
A9 3.25 21 1 0.35 23.89
A10 3.05 4.55 2 0.35 9.71
A11 3.05 2.15 2 0.35 4.59
240.68 Tn

LOSA 3 AL 16 NIVEL

B L N° Elem. P. especifico PESO


A1 6.55 8.1 2 0.35 37.14
A2 6.55 8 2 0.35 36.68
A3 5.25 6.35 2 0.35 23.34
A4 6.35 8 3 0.35 53.34
A5 6.35 7.8 1 0.35 17.34
A6 6.35 8.1 1 0.35 18.00
A7 4.2 7.8 1 0.35 11.47
A8 1.9 7.8 1 0.35 5.19
A10 3.05 4.55 2 0.35 9.71
A11 3.05 2.15 2 0.35 4.59
216.79 Tn

TABIQUERIA

1ER NIVEL- MEZANIME


B H N° Elem. P. especifico PESO
MS 28.19 1.625 1 0.1 4.58
MC 0 1.625 1 0.3 0.00
MS-V 54.46 1.125 1 0.1 6.13
MC-V 17.67 1.125 1 0.3 5.96
V-22 1 1.275 4 0.1 0.51
V-23 0.6 0.775 1 0.1 0.05
MS 27.43 1.625 1 0.1 4.46
MC 0 1.625 1 0.3 0.00
MS-V 49.05 1.625 1 0.1 7.97
MC-V 20.53 1.625 1 0.3 10.01
V-4 4.33 1.5 1 0.1 0.65
40.31 Tn

MEZANIME-2do NIVEL
B H N° Elem. P. especifico PESO
MS 27.43 1.625 1 0.1 4.46
MC 0 1.625 1 0.3 0.00
MS-V 41.05 1.125 1 0.1 4.62
MC-V 19.93 1.125 1 0.3 6.73
MS-V3 8 0.125 1 0.1 0.10
MS 31.42 1.625 1 0.1 5.11
MC 0 1.625 1 0.3 0.00
MS-V 15.33 1.625 1 0.1 2.49
MC-V 9.79 1.625 1 0.3 4.77
V-24 1 1.625 1 0.1 0.16
V-25 0.6 1.125 1 0.1 0.07
V-4 4.33 1.5 1 0.1 0.65
V-3 0.6 1.625 1 0.3 0.29
29.44 Tn

2do-3er y al 15 NIVEL
B H N° Elem. P. especifico PESO
MS 31.42 1.625 2 0.1 10.21
MC 0 1.625 2 0.3 0.00
MS-V 15.33 1.625 2 0.1 4.98
MC-V 9.79 1.625 2 0.3 9.55
V-24 1 0.775 1 0.1 0.08
V-25 0.6 1.025 1 0.1 0.06
V-24 1 1.625 1 0.1 0.16
V-25 0.6 0.525 1 0.1 0.03
V-4 4.33 1.5 1 0.1 0.65
V-3 0.6 1.625 1 0.3 0.29
26.01 Tn

15to-16to NIVEL
B H N° Elem. P. especifico PESO
MS 31.42 1.625 1 0.1 5.11
MC 0 1.625 1 0.3 0.00
MS-V 15.33 1.625 1 0.1 2.49
MC-V 9.79 1.625 1 0.3 4.77
V-24 1 0.775 1 0.1 0.08
V-25 0.6 1.025 1 0.1 0.06
MS 21.56 3.75 1 0.1 8.09
MC 11.19 3.75 1 0.3 12.59
MTANQUE 26.7 6 1 0.3 48.06
33.18 Tn

ACABADOS

1ER NIVEL- MEZANIME


B H N° Elem. P. especifico PESO
MS 28.19 1.625 1 0.1 4.58
MC 0 1.625 1 0.1 0.00
MS-V 54.46 1.125 1 0.1 6.13
MC-V 17.67 1.125 1 0.1 1.99
V-22 1 1.275 4 0.1 0.51
V-23 0.6 0.775 1 0.1 0.05
MS 27.43 1.625 1 0.1 4.46
MC 0 1.625 1 0.1 0.00
MS-V 49.05 1.625 1 0.1 7.97
MC-V 20.53 1.625 1 0.1 3.34
V-4 4.33 1.5 1 0.1 0.65
29.67 Tn

MEZANIME-2do NIVEL
B H N° Elem. P. especifico PESO
MS 27.43 1.625 1 0.1 4.46
MC 0 1.625 1 0.1 0.00
MS-V 41.05 1.125 1 0.1 4.62
MC-V 19.93 1.125 1 0.1 2.24
MS-V3 8 0.125 1 0.1 0.10
MS 31.42 1.625 1 0.1 5.11
MC 0 1.625 1 0.1 0.00
MS-V 15.33 1.625 1 0.1 2.49
MC-V 9.79 1.625 1 0.1 1.59
V-24 1 1.625 1 0.1 0.16
V-25 0.6 1.125 1 0.1 0.07
V-4 4.33 1.5 1 0.1 0.65
V-3 0.6 1.625 1 0.1 0.10
21.58 Tn
2do-3er y al 15 NIVEL
B H N° Elem. P. especifico PESO
MS 31.42 1.625 2 0.1 10.21
MC 0 1.625 2 0.1 0.00
MS-V 15.33 1.625 2 0.1 4.98
MC-V 9.79 1.625 2 0.1 3.18
V-24 1 0.775 1 0.1 0.08
V-25 0.6 1.025 1 0.1 0.06
V-24 1 1.625 1 0.1 0.16
V-25 0.6 0.525 1 0.1 0.03
V-4 4.33 1.5 1 0.1 0.65
V-3 0.6 1.625 1 0.1 0.10
19.46 Tn

15to-16to NIVEL
B H N° Elem. P. especifico PESO
MS 31.42 1.625 1 0.1 5.11
MC 0 1.625 1 0.1 0.00
MS-V 15.33 1.625 1 0.1 2.49
MC-V 9.79 1.625 1 0.1 1.59
V-24 1 0.775 1 0.1 0.08
V-25 0.6 1.025 1 0.1 0.06
MS 21.56 3.75 1 0.1 8.09
MC 11.19 3.75 1 0.1 4.20
MTANQUE 26.7 6 1 0.1 16.02
21.61 Tn

ESCALERAS PRINCIPAL

1ER NIVEL- MEZANIME -2do NIVEL


A L H N° Elem. P. especifico PESO
1er TRAMO 2 2.72 0.27 1 2.4 3.53
1er DESCANZO 2 1.71 0.2 1 2.4 1.64
2do TRAMO 2 1.36 0.27 1 2.4 1.76
2do DESCANZO 2 2.32 0.2 1 2.4 2.23
3ro TRAMO 2 3.06 0.27 1 2.4 3.97
13.12

2do - 16to NIVEL


A L H N° Elem. P. especifico PESO
1er TRAMO 2 2.8 0.27 1 2.4 3.63
1er DESCANZO 2 1.71 0.2 1 2.4 1.64
2do TRAMO 2 1.4 0.27 1 2.4 1.81
2do DESCANZO 2 2.32 0.2 1 2.4 2.23
3ro TRAMO 2 3.15 0.27 1 2.4 4.08
13.39

ESCALERA DE SERVICIO
1ER NIVEL- MEZANIME -2do NIVEL
A L H N° Elem. P. especifico PESO
1er TRAMO 1.6 4.08 0.27 1 2.4 4.23
1er DESCANZO 1.6 1.4 0.2 1 2.4 1.08
2do TRAMO 1.6 3.74 0.27 1 2.4 3.88
9.18

2do - 16to NIVEL


A L H N° Elem. P. especifico PESO
1er TRAMO 1.6 4.2 0.27 1 2.4 4.35
1er DESCANZO 1.6 1.4 0.2 1 2.4 1.08
2do TRAMO 1.6 3.85 0.27 1 2.4 3.99
9.42

SOBRECARGA

MEZANIME

B L N° Elem. P. especifico PESO


A1 6.55 8.1 1 0.3 15.92
A2 6.55 8 1 0.3 15.72
A3 5.25 6.35 1 0.3 10.00
A4 6.35 8 1 0.3 15.24
A5 6.35 7.8 1 0.3 14.86
A6 1 9.27 1 0.3 2.78
A7 4.2 7.8 1 0.3 9.83
A8 1.9 7.8 1 0.3 4.45
A9 3.05 4.55 2 0.3 8.33
A10 3.05 2.15 2 0.3 3.93
101.05 Tn
50.526 Tn(50%)
2do NIVEL

B L N° Elem. P. especifico PESO


A1 6.55 8.1 2 0.3 31.83
A2 6.55 8 2 0.3 31.44
A3 5.25 6.35 2 0.3 20.00
A4 6.35 8 3 0.3 45.72
A5 6.35 7.8 1 0.3 14.86
A6 6.35 8.1 1 0.3 15.43
A7 4.2 7.8 1 0.3 9.83
A8 1.9 7.8 1 0.3 4.45
A9 3.25 21 1 0.3 20.48
A10 3.05 4.55 2 0.3 8.33
A11 3.05 2.15 2 0.3 3.93
206.30 Tn
103.148 Tn(50%)
3 AL 15 NIVEL 51.574 Tn(50%)
B L N° Elem. P. especifico PESO
A1 6.55 8.1 2 0.3 31.83
A2 6.55 8 2 0.3 31.44
A3 5.25 6.35 2 0.3 20.00
A4 6.35 8 3 0.3 45.72
A5 6.35 7.8 1 0.3 14.86
A6 6.35 8.1 1 0.3 15.43
A7 4.2 7.8 1 0.3 9.83
A8 1.9 7.8 1 0.3 4.45
A10 3.05 4.55 2 0.3 8.33
A11 3.05 2.15 2 0.3 3.93
185.82 Tn
92.910 Tn(50%)
16 NIVEL

B L N° Elem. P. especifico PESO


A1 6.55 8.1 2 0.3 31.83
A2 6.55 8 2 0.3 31.44
A3 5.25 6.35 2 0.3 20.00
A4 6.35 8 3 0.3 45.72
A5 6.35 7.8 1 0.3 14.86
A6 6.35 8.1 1 0.3 15.43
A7 4.2 7.8 1 0.3 9.83
A8 1.9 7.8 1 0.3 4.45
A10 3.05 4.55 2 0.3 8.33
A11 3.05 2.15 2 0.3 3.93
185.82 Tn
92.910 Tn(50%)
MEZAMINE NIVEL 2 NIVEL3 NIVEL 4 NIVEL 5
VIGAS PRINCIAPLES
VIGAS SECUNDARIAS
COLUMNAS 83.3616 89.316
LOSA
TABIQUERIA
ACABADOS
SOBRECARGA
WI(T)

Tn

Tn

Tn

Tn
Tn

Tn

Tn

Tn

Tn
Tn

Tn

Tn

Tn
Tn

Tn

Tn
Tn

Tn

Tn
Tn

Tn

Tn

Tn
Tn

Tn

Tn
Tn
Tn

Tn
Tn

Tn
NIVEL 6 NIVEL 7 NIVEL 8 NIVEL 9 NIVEL 10 NIVEL 11 NIVEL 12 NIVEL 13 NIVEL 14
NIVEL 15

You might also like