General Introduction
Projects feasibility study started in 2004 Operation license issued by Binhduongs Planning &

Investment Dept on 14 November, 2007.


Construction started in May 2010 First phase come into operation on quarter I/2012.

15 July 2012

TPP Shareholders
TPP
( THANHPHUOC PORT CORPORATION)

BICONSI (35%)

NTC (NamTanUyen IP) (32,5%)

U&I Logistics (32,5%)

15 July 2012

COMMODTIES FIGURE OF BINH DUONG, BINH PHUOC PROVINCE & HIGHLANDS.


The quantity of comodities go throught terminal port No Name of terminal port Total volume of commodities go throught port in HCM City area. Container A/ Total commodities for export Unit 2005 Ton Teu Ton Teu Ton Teu Ton Teu Ton 46,657,605 2,171,179 14,298,850 1,008,984 28,795,939 917,030 3,562,816 214,553 2,028,057 2006 51,685,982 2,541,446 15,898,05 1,162,74 32,112,393 1,093,363 3,674,884 285,409 2,271,422 2007 61,020,798 3,172,853 17,546,154 1,382,668 38,976,669 1,369,442 4,497,975 420,723 2,612,144 2008 67,733,086 3,521,867 19,476,231 1,534,761 43,264,103 1,520,081 4,992,752 467,003 2,899,480 2009 74,506,375 3,874,054 21,423,854 1,688,237 47,590,513 1,672,089 5,492,027 513,703.3 3,189,428

Container B/Total commodities for import Container C/ Total commodities for internal. Container Total for commodities go throught Dongnai, Vungtau port erea.

II

Container
Total I+II III Container 15 July 2012

Teu
Ton Teu

205,894
48,685,662 2,377,03

230,602
53,957,404 2,772,048

265,192
63,632,942 3,438,045

294,363
70,632,548 3,816,230

323,799
77,695,803 4,197,853

ESTIMATED COMMODITIES GO THROUGHT TPP


No Commodities Unit 2010 2013 2018 2023 2028

Commodities that need for loading, unloading & transportation.

Ton

5,117,596

9,090,924

22,359,355

41,571,553

67,343,642

Commodities that loading, unloading & transportation follow investment planning.

Ton

890,603

1,545,922

3,646,097

4,502,199

5,394,226

Estimated ratio of commodities go throught TPP

17.41

17.01

16.31

10.83

8,01

15 July 2012

Master plan of Thanh Phuoc Port Corporation

15 July 2012

Thanh Phuoc Port

15 July 2012

LOCATION MAP NEIGHBOUR TPP

South Dong Phu Industrial Pack Tan Khai Industrial Pack Minh Hung III Industrial Pack Dong Xoai Industrial Pack North Dong Phu Industrial Pack Minh Hung-Korea Industrial Pack Becamex BP Industrial Pack Bau Bang Industrial Pack Chon Thanh Industrial Pack Sai Gon BP Industrial Pack

My Phuoc Industrial Pack My Phuoc IV Industrial Pack Rach Bap Industrial Pack An Tay Industrial Pack Viet Huong II Industrial Pack Mai Trung Industrial Pack

My Phuoc II Industrial Pack My Phuoc III Industrial Pack Thoi Hoa Industrial Pack Song Than III Industrial Pack Dat Cuoc Industrial Pack Kim Huy Industrial Pack Dong An II Industrial Pack Dai Dang Industrial Pack Nam Tan Uyen Industrial Pack Xanh BD Industrial Pack Phu Gia Industrial Pack

VSIP II Industrial Pack

Thanh Phuoc Port

15 July 2012

My Phuoc Industrial Parkc

VSIP II Industrial Park

Nam Tan Uyen Industrial Park Linh Trung 3 Industrial Park north-west Cu Chi Industrial Park

Duc Hoa 3 Industrial Park Thai Hoa Industrial Park

Viet Huong Industrial Park Viet Nam Singapore Industrial Park

Thanh Phuoc Bien Hoa AirPort Port


Amata Industrial Park Bien Hoa I Industrial Park Loteco Industrial Park

Song Than 2 Industrial Park Xuyen A Industrial Park Duc Hoa Dong Industrial Park Tan Son Nhat AirPort Binh Chieu Industrial Park Song Than 1 Industrial Park

Tam Phuoc Industrial Park

Tan Duc Industrial Park

Cat Lai Port Sai Gon Port Area

Vinh Loc 2 Industrial Park Thuan Dao Industrial Park

Hiep Phuoc Port Area

Cai Mep Port

Vung Tau Port

15 July 2012

DISTANCE BETWEEN THANHPHUOC PORT CORPORATION TO SOMES DEEP WATER PORT, INDUSTRIAL PARK AND IMPORTANCE AREA IN THE SOUTH OF VIETNAM.
THANH PHUOC PORT CORPORATION TO DISTANCE ( Km)
TRUCK ON ROAD 1 KCN Xanh Bnh Dng ( IP) 2 KCN Nam Tn Uyn (IP) 3 KCN VSIP I (IP) 4 KCN Tn ng Hip A (IP) 5 KCN Tn ng Hip B (IP) 6 KCN Kim Huy (IP) 5 5 10 10 10 10 BARGE ON RIVER

7 KCN Ph Gia (IP)


8 KCN t Cuc (IP) 9 KCN i ng (IP) 10 KCN VSIP II (IP)

10
10 10 10

11 KCN Vit Hng I (IP)


12 KCN Sng Thn I (IP)
15 July 2012 13 KCN

15
15 15

Sng Thn II (IP)

14 KCN ng An I (IP) 15 KCN Bnh Chiu (IP) 16 KCN Linh Trung II (IP) 17 KCN Sng Thn III (IP) 18 KCN ng An II (IP) 19 KCN Linh Trung II (IP) 20 KCN Tn nh (IP) 21 KCN Bnh An (IP) 22 KCN Bnh ng (IP) 23 KCN VSIP III (IP) 24 KCN M Phc 1,2 (IP) 25 KCN M Phc 3,4 (IP)

15 16 16 17 17 20 20 20 20 25 25 25

26 KCN Thi Ha (IP)


27 KCN Vit Hng II (IP) 28 KCN Bu Bng (IP) 29 KCN Rch Bp (IP)

30
40 40 40

15 July 2012

30 KCN An Ty (IP) 31 KCN Mai Trung (IP) 32 Tnh Bnh Phc (PROVINCE) 33 Tnh k Nng (PROVINCE) 34 Tnh k Lk (PROVINCE) 35 Tnh Gia Lai (PROVINCE)

40 40 50 150 250 300

36 Cng ng Nai ( DONGNAI PORT)


37 Cng khu vc Si Gn ( SAIGON PORT AREA) Cng khu vc KCN Hip Phc ( DEEP WATER

18
60

38

PORT)

69
110

39 Cng khu vc Ci Mp (DEEP WATER PORT)

15 July 2012

ADVANTAGES & POTENTIALS OF TPP :


1.

Geographical location : Located along right side of Dong Nai River, TPP s being planned to connect all deep water ports in HCMC & Ba Ria-Vung Tau. In the central of Binh Duong industrial areas (Nam Tan Uyen, Song Than I,II,III; VSIP I,II; My Phuoc I,II,III), it s easy for TPP to collect & transit cargo. 2. Strong support from customers : TPP has contacted more than 80 customers in the area of Binh Duong and Binh Phuoc province in which 25 enterprises have signed the agreement and agrees to deliver the goods pass through TPP. Container production is estimated 4000-5000 teus / month. The remaining companies are very interested and said they will support TPP when it puts into operation. Key Accounts : VIETNAM RUBBER GROUP (VRG); PETEC Logistics Joint Stock Company; MAGNUSEN; Return Gold

15 July 2012

15 July 2012

Construction of infrastructure & Materials handling equipment


Total areas 63ha with total investment cost VND1,450 Billion. 16 piers ( 62 meter per pier). The first phases 2011-2014 build 08

piers. The second phases

2012-2018 build more 08 piers.

04 (Four) Liebherrs fixed cranes handling bulk cargo up to 90tons.

12 ( Twelve) Quay side gantry crane handling container 20, 40 45.


Rubber Tired Gantry handling for container 20, 40 45 at container

yard.
Reachstakers of Hyster for handling container up to 45tons.
Install updated software system for container, yard and barge

planning
15 July 2012

HANDLING MATERIALS EQUIPMENT


Rail mounted quay cranes, 17m rail span. Lifting capacity under Spreader (20/40/45) Crane lifting capacity Fixed crane 06 Sets ( First phase) 41m/t 50 m/t 30 cont/h/move 02 sets ( First phase) 12 (one over four, six wide) 33 cont/h/move 04 06 06 28

Rubber Tired Gantry Cranes ( 41m/t) Lifting capacity Reach Stacker Side Lifter CFS forklifts Yard tractors (company owned) Trailers (company owned)

20
Reefer connections
15 July 2012

370

TPP option for the first two piers come into operation on QI/2012

15 July 2012

Illustrate picture

WAREHOUSING

15 July 2012

Activities since Jan, 2012

15 July 2012

Handling commodities from barge to truck

15 July 2012

15 July 2012

International standard piers

15 July 2012

15 July 2012

TPPs barge operation

15 July 2012

Illustrate picture

Sea access to Thanhphuoc Port


THANH PHUOC PORT

15 July 2012

Save cost, time and labor for clients


Save cost compare to truck on road to deep water port area of -

CATLAI, HIEPPHUOC & CAIMEP. TPP handle for barge transportation with cost cheaper 5% compared to truck on road transportation (Depend on distance). Barge transportation save cost for clients up to 5%. Reduce traffic jam and road accidence. Avoid and reduce pollution for environment.

Save time and labor for clients. - Save transportation time for clients. - TPP handle the commodities for clients from clients factory to

deep water port ( go in/out) in shortest time with suitable cost. - Big volume in container or bulk cargo in barge transportation.

15 July 2012

Benefits to use TPP

Quay side gantry crane and Liebherr fixes cranes with

productivity 30move/crane/hour. Brand new yard equipment Reachstackers and RTG ( 1 over 4 high, six wide). Late cut time. High productivity. Pier availability. Close to high volume commodities market. On par or better cost saving to cargo owners

15 July 2012

Easy access to Thanhphuoc port by truck on road for

location near BinhDuong as BinhPhuoc, Highlands of south Vietnam to move by barge to deep water port at Hochiminh City and Caimep ( Vungtau province). Barge transportation cost cheaper than by using truck on road by 5%. Flexible customs. Congestion FREE, ability to grow. Attractive rates.

15 July 2012

www.thanhphuocport.com.vn
Port address: 207, DT 747A, Thanhphuoc Ward, Tan

Uyen District, Binh Duong Province. Email: thongpq@thanhphuocport.com.vn Mobil: +84.908 458590. Tel: +84.650.2475.859 Fax: +84.650.3629.434
15 July 2012

Welcome to Thanh Phuoc Port

Thank you!
Presented by TPP
15 July 2012

You might also like