Berenlaan
Transforming the slums into integrated vertical dwelling and preserving the river banks as green area and water retention
The relocation of dwelling along the Ciliwung river banks potentially to revitalize the green area 12 Km long and 12Ha area
3000m
2000m
RSCM Megaria
1000m
Stasiun Manggarai
Rasuna Epicentrum
SMUN 8
Pasar Jatinegara
PROXIMITY STUDY
2000m
RS St. Carolus Stasiun Cikini Apartemen Eksekutif Menteng STT Jakarta Majelis Ulama Indonesia Tugu Proklamasi
1000m
Sekolah Tinggi Perpajakan Indonesia Gramedia Indonesia Yayasan Administrasi Negara
Pasar Rumput
Sekolah Marsudirini
Pasaraya
PROXIMITY STUDY
38,97 Ha
Indo Farma 3,01 Ha
STASIUN MANGGARAI
U
SDN 12 Kebon Manggis 0,26Ha
EXISTING SITUATION
DESIGN PRINCIPLE
River restoration
DESIGN PRINCIPLE
DESIGN SCHEME
3 dimensional mosaic
2 dimensional mosaic
BLOCK PLAN
DESIGN SCHEME
ZONA PERKANTORAN
Tahap - 1
18,4 Ha
Tahap - 2
20,57 Ha
ZONA PERUMAHAN
DESIGN SCHEME
Additional Unit Allocation
DESIGN SCHEME
Additional Unit Allocation
DESIGN SCHEME
Parking Location
DESIGN SCHEME
Pedestrian
DESIGN SCHEME
Elevated Public Space
GREEN AREA
Community Park
GREEN AREA
Riverfront
GREEN AREA
Inner Court
GREEN AREA
Rooftop Garden
GREEN AREA
PONDS AND GARDEN
SHOPPING ARCADE
COMMUNITY MOSQUE
UNIT DESIGN
Type 36 m2
UNIT DESIGN
Type 36 m2
INTERIOR PRECEDENT
UNIT DESIGN
Tower Type A
UNIT DESIGN
Tower Type A With Public Space
INTERIOR PRECEDENT
UNIT DESIGN
Tower Type B
UNIT DESIGN
Tower Type B With Public Space
UNIT DESIGN
Tower Type C
UNIT DESIGN
Tower Type C With Public Space
LIFT
SCHEDULE TAHAP 1
SCHEDULE
SCHEDULE
SCHEDULE
Appendix TAHAP 1
D
Total Unit Total Luas 3307 290.152
E
Total Unit Total Luas 2457 121.774
F
Total Unit Total Luas 2270 108.996
E
F
C
Total Unit Total Luas 4136 162.417
B
A
B
Total Unit Total Luas 3980 198.370
A
Total Unit Total Luas 3449 164.650
DEVELOPMENT INDEX
Phase 1
Phase 1
TOWER A NO 1 2 3 4 5 6 TAMBAHAN 1 2 3 4 5 6 7 8 9 10 TAMBAHAN 1 2 3 4 5 6 7 TAMBAHAN JML LANTAI 27 22 17 22 17 22 2 27 22 22 17 22 17 22 22 22 27 2 22 22 22 27 27 27 33 2 UNIT/LANTAI JUMLAH UNIT 17 459 22 484 17 289 42 924 17 289 44 968 18 36 17 17 17 29 12 29 12 17 17 17 26 12 29 45 25 28 17 10 12 459 374 374 493 264 493 264 374 374 459 52 3980 264 638 990 675 756 459 330 24 4136 TOTAL
C
3449
TOTAL B
B A
TOTAL C
TOTAL
DEVELOPMENT INDEX
Phase 1
Phase 1
TOWER D NO 1 2 3 4 5 6 7 TAMBAHAN 1 2 3 4 5 6 7 TAMBAHAN 1 2 3 4 5 6 7 TAMBAHAN
JML LANTAI 22 27 17 22 22 27 33 2
17 22 27 27 22 17 22 2 17 22 27 27 22 17 22 2
UNIT/LANTAI JUMLAH UNIT 14 308 25 675 27 459 15 330 17 374 29 783 10 330 24 48 25 13 17 12 17 17 12 18 14 14 12 17 15 17 13 18 425 286 459 324 374 289 264 36
TOTAL
E
F
TOTAL E
3307
TOTAL F
TOTAL
DEVELOPMENT INDEX
TOTAL TAHAP 1
19599
Phase 1
Phase 1
TOWER NO 1 2 3 4 5 6 JUMLAH LANTAI 27 22 17 22 17 22 1 LUAS PER LANTAI 810 1,026 810 810 1,980 2,090 8,978 TOTAL (M2) 21,870 22,572 13,770 17,820 33,660 45,980 8,978 164,650 21,870 17,820 17,820 23,715 12,870 23,715 12,870 17,820 17,820 21,870 10,180 198,370 1 2 3 4 5 6 22 22 22 22 27 27 1 567 1,395 1,248 1,207 1,336 792 7,787 12,474 30,690 27,456 26,554 36,072 21,384 7,787 162,417
PODIUM TOTAL B
C B A
1 2 3 4 5 6 7 8 9 10
PODIUM
TOTAL C
27 22 22 17 22 17 22 22 22 27 1
810 810 810 1,395 585 1,395 585 810 810 810 10,180
PODIUM TOTAL
DEVELOPMENT AREA
Floor Area- Phase 1
Phase 1
TOWER D NO 1 2 3 4 5 6 7 JUMLAH LANTAI 22 27 17 22 22 22 33 1 LUAS PER LANTAI 6,772 1,215 1,281 810 810 1,395 417 6,495 TOTAL 148,984 32,805 21,777 17,820 17,820 30,690 13,761 6,495 290,152 20,400 13,684 21,654 15,282 17,820 13,770 12,870 6,294 121,774 11,407 14,762 15,876 17,820 16,082 13,770 13,398 5,881 108,996 1,046,359
E F
PODIUM TOTAL E
1 2 3 4 5 6 7
PODIUM TOTAL F
17 22 27 27 22 17 22 1
1 2 3 4 5 6 7
PODIUM TOTAL
TOTAL GFA TAHAP 1
17 22 27 22 22 17 22 1
DEVELOPMENT AREA
Floor Area- Phase 1
Phase 1
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN Rp. TOTAL Rp.
I
1
PERSIAPAN&INFRASTRUKTUR
PEKERJAAN PERSIAPAN & INFRASTRUKTUR TAHAP 1 184,300.00 m2 1,000,000.00 JUMLAH I 184,300,000,000.00 184,300,000,000.00
II
Tower A
A A.1 PEKERJAAN STRUKTUR A.2 PEKERJAAN ARSITEKTUR A.3 PEKERJAAN MEKANIKAL ELETRIKAL PLAMBING 164,650 164,650 164,650 M M M 1,800,000.00 1,200,000.00 1,000,000.00 JUMLAH II 296,370,000,000.00 197,580,000,000.00 164,650,000,000.00 658,600,000,000.00
III
Tower B
B.1 PEKERJAAN STRUKTUR B.2 PEKERJAAN ARSITEKTUR B.3 PEKERJAAN MEKANIKAL ELETRIKAL PLAMBING 198,370 198,370 198,370 M M M 1,800,000.00 1,200,000.00 1,000,000.00 JUMLAH III 357,066,000,000.00 238,044,000,000.00 198,370,000,000.00 793,480,000,000.00
IV
C.1 C.2 C.3
Tower C
PEKERJAAN STRUKTUR PEKERJAAN ARSITEKTUR PEKERJAAN MEKANIKAL ELETRIKAL PLAMBING 162,417 162,417 162,417 M M M 1,800,000.00 1,200,000.00 1,000,000.00 292,350,600,000.00 194,900,400,000.00 162,417,000,000.00
JUMLAH IV
649,668,000,000.00
COST ESTIMATION
Phase 1
Tower D
D.1 PEKERJAAN STRUKTUR D.2 PEKERJAAN ARSITEKTUR D.3 PEKERJAAN MEKANIKAL ELETRIKAL PLAMBING 290,152 290,152 290,152 M M M 1,800,000.00 1,200,000.00 1,000,000.00 JUMLAH V 522,273,600,000.00 348,182,400,000.00 290,152,000,000.00 1,160,608,000,000.00
VI
Tower E
E.1 PEKERJAAN STRUKTUR E.2 PEKERJAAN ARSITEKTUR E.3 PEKERJAAN MEKANIKAL ELETRIKAL PLAMBING 121,774 121,774 121,774 M M M 1,800,000.00 1,200,000.00 1,000,000.00 JUMLAH VI 219,193,200,000.00 146,128,800,000.00 121,774,000,000.00 487,096,000,000.00
VII
Tower F
F.1 PEKERJAAN STRUKTUR F.2 PEKERJAAN ARSITEKTUR F.3 PEKERJAAN MEKANIKAL ELETRIKAL PLAMBING 108,996 108,996 108,996 M M M 1,800,000.00 1,200,000.00 1,000,000.00 JUMLAH VII 196,192,800,000.00 130,795,200,000.00 108,996,000,000.00 435,984,000,000.00 4,369,736,000,000.00
TOTAL TAHAP 1
E F COST ESTIMATION
Phase 1
TEPBEK
ZIKON-11
DISBINTAL
Tahap - 1
18,4 Ha
BENGPUSZI
TAHAP - 2
20.57Ha
BANGUNAN CAGAR BUDAYA DITZIAD
TOWER T-36
FASOS
TOWER T-57
FASDIK
U
TOWER T-47
KAPTEN KE BAWAH
ZIKON-11 DISBINTAL
PERENCANAAN:
BENGPUSZI
TOWER T-36
FASOS
FASDIK
TOWER T-36
U
BLOK PLAN TAHAP 2
Tahapan Pengembangan
LETKOL/MAYOR
ZIKON-11 DISBINTAL
PERENCANAAN:
BENGPUSZI
DITZIAD
FASOS
FASDIK
TOWER T-47
U
TAHAP 2
TOWER T-47
Tahapan Pengembangan
KOLONEL
ZIKON-11 DISBINTAL
PERENCANAAN:
BENGPUSZI
: 11 UNIT : 99 UNIT
FASOS
TOWER T-57
FASDIK
U
TAHAP 2
Tahapan Pengembangan
TOWER T-57
TAHAP 2
Tahapan Pengembangan
IMAGE 1
K.TIDUR
K.TIDUR
UNIT TYPE A Living room Master Bedroom Bedroom 1 Bedroom 2 Bathroom Pantry Circulation
57 m = 18 m = 11 m = 9 m = 7,5 m = 3,5 m = 5 m = 3 m
R. KELUARGA
SELASAR
TYPE 57
UNIT KOLONEL
K.TIDUR
K.TIDUR
DAPUR
= = m = 3,5 m =6 m = 2,5 m
47 m 17 m 9 m
R. KELUARGA
TYPE 47
SELASAR
UNIT TYPE C36 m Living room = 13 m Bedroom 1 = 9 m Bedroom 2 = 6 m Bathroom = 3 m Pantry = 3 m Circulation = 2 m
TYPE 36
UNIT KAPTEN KEBAWAH
KEBUTUHAN RUANG KANTOR DAN RUMAH DLM RANGKA PENATAAN KOMPLEK BERLAN DITZIAD
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
1 15 32 74 94 133 550
60 48 36 9 6 4 4 30%
114 57 47 47 36 36 36 20%
DISBINTALAD
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
1 8 15 35 57 20 152
60 48 36 9 6 4 4 30%
114 57 47 47 36 36 36 20%
TEBEK
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
1 5 15 25
60 48 36 9 6 4 4 30%
114 57 47 47 36 36 36 20%
YONZIKON 11
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
1 1 25 127 422
60 48 36 9 6 4 4 30%
114 57 47 47 36 36 36 20%
MAKOSTRAD
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
114 57 47 47 36 36 36 20%
DISLITBANG
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
1 10 20 30 49 33 231
114 57 47 47 36 36 36 20%
DITPALAD
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
114 57 47 47 36 36 36 20%
STHM
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
0 6 12 21 31 17 79
90 90 58 58 36 36 36 20%
PUSINTELAD
NO PANGKAT JUMLAH KEB RUANG KANTOR INDEX M2 JUMLAH KEB RUANG RUMAH INDEX M2 JUMLAH
1 2 3 4 5 6 7
1 9 21 33 71 117 157
114 57 47 47 36 36 36 20%
NO 1. 2. 3.
SAT. M2 M2
KET : 1. Untuk jumlah harga point 1( tanah ) dan point 3 ( prasarana ) = Rp. 1.139.869.500.000 + Rp. 15.720.900.000 = Rp. Digunakan untuk pembangunan kantor dan rumah susun dinas 2.
1.155.590.400.000
Untuk jumlah harga point 2( bangunan ) = Rp. 78.604.500.000 Digunakan untuk mengganti nilai bangunan di asrama gabungan/campuran
NO 1 2 3 4 5 6 7 8 9
SATUAN DITZIAD DISBINTALAD TEBEK YONZIKON 11 MAKOSTRAD DISLITBANG DITPALAD STHM PUSINTELAD JUMLAH
57 M2 17 10 14 12 15 6 11 85
A. TYPE-57 (KOLONEL) 1 TOWER ( 9 LT ) + GARASI 2 KI LEOPARD B. TYPE-47 (LETKOL/ MAYOR) 2 TOWER (10 LT) C. TYPE-36 (KAPTEN KE BAWAH) 10 TOWER (15 LT)
TOTAL BIAYA
1. 2. BIAYA PEMBANGUNAN PERKANTORAN DAN PERUMAHAN (PenataanKompleks BERLAND) BIAYA PEMINDAHAN PANGKALAN, PEMBANGUNAN PERKANTORAN DAN PERUMAHAN YONZIKON 11 DI TANGERANG Rp. 1.675.042.395.750,-
Rp.232.821.950.000,-
GRAND TOTALRp.1.907.864.345.750,-