Business CTQ Customer CTQ Internal CTQ Saving (Low COPQ) Project CTQ 1 To improve C-S Yield 2 To reduce Power consumption at SMS 1 To reduce instances of elbow jamming 2 To reduce problem in main hoist brake Basic for selecting project
3 To reduce down time at Grinder Productivity ( Down time) To improve MTTR & MTBF of 100 T A, 100 T 4 B, 40 T A To improve life of water cooled panels at 5 EAF-2 6 To reduce down time at EAF 1 To reduce down time due to elbow cleaning 7 at EAF-2
Company profit
Loss in operational consumables & Si rate due to increase scrap consumption in 300 series: out of scope. If we increase C-S yield then automatically other TEPs will be improved.
Loss in operational consumables & Si rate due to increase scrap consumption in 300 series: out of scope. If we increase C-S yield then automatically other TEPs will be improved.
1 2
SMS-1 EAF-1
Yield Productivity
27/8/2011 27/8/2011
3 4
27/8/2011 27/8/2011
Nov.11 Nov.11
5 6 7 8
To reduce down time at Grinder To reduce Power consumption at SMS To improve As Cast percentage of J4,304,IRSM44-97,JT To improve life of water cooled panels at EAF-2
S.S. Mishra (Leader) Mr. I.S Raswan Mr. Kalicharan Malla Mr.Balram Sharma
9 10
To reduce problem of lamination in 204Cu from 16% to 8% To improve MTTR & MTBF of 100 T A, 100 T B, 40 T A
27/8/2011 27/8/2011
Feb.12 Nov.11
PIP
SMS-2
Productivity
11
PIP
SMS-2
Productivity
27/8/2011
Nov.11
SMS-2
Quality
27/8/2011
Feb.12