You are on page 1of 14

CRANES

A2B Hoist
Anemometer Rope Slings Hooks Latches Hydraulic oil leaks

Battery terminals And other electromechanical

parts

BYE PASS
SWITCHES

ONLY DURING SERVICES,


MAINTNENANCES

Tyre And bolts

EXTERNAL
(3RD PARTY )

INTERNAL (PROJECT SPECIFIC)

Removal of All Unwanted materials

obstructions

Load Moment Indicators


Calibrations Previous

records of byepasses

Load charts

model Counter weight According to the PTW/SWP

Crane

COUNTER WEIGHTS

Load charts

model Counter weight

Crane

COMPACTION

Padding Outrigger pads

Fully extended

Outrigger pins

Check For level in spirit level or in LMI

Outriggers should be always placed in the centre of the pad Should be Stable and rigid

Anti slippery

THE SWINGING AREA

CURTAINS

360

.
CRANES

BARRICADES

Load calculations

Some common rules followed Never a hollow pipe or a scaffold tube shall be used to lift cable drums Never cross/stand under a suspended load/boom No man lift shall work directly under a boom during any erection. Look for any under ground services 3rd party certificate for operator should be for the particular crane only Before lifting any equipment check the exact weight, it could differ if the equipment was under purging ,then it could weigh more than the specified weight.(since nitrogen is heavier than ambience air). In case of adverse weather condition, or in emergency try to place the load , back in ground level or secure the load properly so it will not fall and cordon off the whole area. Use spreader bars for wide loads

Thanks
These are Self generated slides Please advise if any lapse*
* Other than
slide design & photography

You might also like