Anemometer Rope Slings Hooks Latches Hydraulic oil leaks
parts
BYE PASS
SWITCHES
EXTERNAL
(3RD PARTY )
obstructions
records of byepasses
Load charts
Crane
COUNTER WEIGHTS
Load charts
Crane
COMPACTION
Fully extended
Outrigger pins
Outriggers should be always placed in the centre of the pad Should be Stable and rigid
Anti slippery
CURTAINS
360
.
CRANES
BARRICADES
Load calculations
Some common rules followed Never a hollow pipe or a scaffold tube shall be used to lift cable drums Never cross/stand under a suspended load/boom No man lift shall work directly under a boom during any erection. Look for any under ground services 3rd party certificate for operator should be for the particular crane only Before lifting any equipment check the exact weight, it could differ if the equipment was under purging ,then it could weigh more than the specified weight.(since nitrogen is heavier than ambience air). In case of adverse weather condition, or in emergency try to place the load , back in ground level or secure the load properly so it will not fall and cordon off the whole area. Use spreader bars for wide loads
Thanks
These are Self generated slides Please advise if any lapse*
* Other than
slide design & photography