Detailed procedure
Detailed procedure
Contd
Merits
Time taking is shorter than the traditional
method
Dimensions and descriptions are written
only once (three times with traditional
system) and eliminate the preparation
and checking the abstract.
As soon as the taking off for each section
of work is completed, it can be shuffled,
edited, typed, read back and duplicated,
so that only a short time after all taking
off is completed.
Demerits
A comprehensive system of
reference required on each slip
and need to writ full descriptions
without using abbreviations.
Elemental Bill
BOQ is divided in to appropriate
building elements inserted if the
normal work sections
(06) Preliminaries
(19) Substructure
(21) External Walls
(22) Internal Walls, Partitions
(23) Floors, Galleries
(24) Stairs, Ramps
Disadvantage
it involve considerable repetition of
bill items, and where work is let to a
subcontractor, it was necessary to
prepare an abstract of items prior to
obtain quotations. For example there
can be brick walls in both
Substructure and External walls.
Operational Bill
items are subdivided in to site operations
as distinct from trades or elements
Labour and sometime plant requirements
were described in term of the operations
required, together with the schedule of
the materials for each operation
Operations were define as the work done
by a man or by a gang of men
Features
bulky and costly to produce
increased the work of the contractors
estimating department
estimator obtained a clear picture of
the work involved
Easy to obtain quotation for materials
need of a complete set of drawings prior
to the preparation of the bills coupled
with the delayed start on the site.
Activity Bill
subdivided in to sections based on
activities or operations derived from
a network analysis.
Some activities need to be
completed before others could be
started.
For example, foundation trenches
need to be excavated before the
concrete foundation can be laid.
Annotated Bill
full details of the quantity, type and
quality of material, and labour and
for an accurate and complete set of
drawings to show him where and how
the work is to be executed.
Annotated may be prepared in a
separate document from the bill of
quantities or they may be bound in
the back of the bill.