MTD Plan 2016 h1
MTD Plan 2016 h1
Plan
2016
Project Description
Expected Results:
Time Schedule :
1) Heat loss 2%
.
2)
Heat loss
( ) ,
July-Dec 2016
Project Detail
It
e
m
Action plan
Existing record
Technical
summarization
PR/PO Process
Installation plan
Technical report
M
a
y
Ju
n
e
Ju
ly
A
u
g
S
e
p
O
ct
N
o
v
160-200C
( 128C)
May16 (
128-130C)
Ceramic Fiber ()
Project Description
.
Time Schedule :
July-Dec 2016
Action plan
Studying
ceramic fiber
property.
Technical
Comparison with
concrete
refractory
Technical
summarization
Ju
ly
A
u
g
S
e
p
O
ct
N
o
v
D
e
c
Annual
Plan
2016
Charging
door ( )
1.
2. Metallic anchor
3. Insulation layer
4. /
,
1.
Nuts.
2.
3. nuts
.
4.
diaphragm
.
Expected Results:
Project Description
Charging & Central
diaphragm
.
Time Schedule :
Action plan
Charging &
Central
diaphragm
BOM
Furnace O&M
PR/PO Process
(AISI 310)
Technical
1. Diaphragm
,
2. 2 5 .
3. Maintenance cost
July-Dec 2016
Annual
Plan
2016
Ju
ly
A
u
g
S
e
p
O
ct
N
o
v
D
e
c
Existing
diaphragm
New design
Fibe
r
AISI
1.
310
Metallic anchor
2.Ceramic fiber
Project Description
Finish coil
Reprocess HFL
New Operation Practice
Yield loss Decoiling
Scratch, DC Rolling fold
DC no.3
Annual
Plan
2016
QCC story
Why-Why
Activity &
Following
Time Schedule :
July-Dec 2016
1)
Sep, 2016
2)
Dec, 2016
Expected Results:
Machine
reliability
Operation
Practice