Professional Documents
Culture Documents
DCP Updates 06172016
DCP Updates 06172016
Procurement Status
Budg Batches
Actual Accomplishment
Programmed
Status
et
Amount
Year
2016
35
Regular Package SHS (184
150,792,600.00 For UNDP procurement; Made
schools)
modification on Specs.
38
SHS Special Package (Arts &
1,146,702,984.00 Submission and opening of bid is
on May 25.
Design, Technical Drafting,
Illustration TVL, Programming,
Medical Transcription TVL) +
Pen Tablet (889 schools)
38
Specialized Software
164,341,300.00
IT Equipment
396,310,000.00
(209 Division Offices)
37
JHS Package
690,920,300.00 Procurement Authority for
(replacement/additional)
downloading of fund to DBM-PS
(715 schools)
for software in process. For the
36
SHS Regular Package
4,358,312,,000 equipment, with intention to
procure through UNDP depending
(4,869 Secondary Schools)
on the result of the first batch to
be procured through them.
2015
29-33
6,209,739,200.00
(20 Lots) Lots 1, 2 , 5 and 8 (ASI-MSI,
NTP and Contracts received by
(DepEd- ASI)
1,515,741,220.00 CTI, ASI and RedDot;
PS)
Lots 6, 9, 10, 11 (CTI)
1,028,551,930.00
Lots 3, 14, 15 17, 18,19
SS
Total Schools
38,718
Deployed Computer Packages (DCP and
other sources)
Ongoing Deployment (First Time
Recipient)
Ongoing Procurement (First Time
Recipient)
Ongoing Deployment
(Replacement/Augmentation)
Ongoing Procurement
(Replacement/Augmentation)
8,161
28,449
73% 7,492
4,024
10% 138
472
1% -
92%
2%
0%
18,781
49% 3,166
39%
8,172
21% 887
11%
2016
1. Replacement of
packages in schools
that received on or
before 2011;
2. Augmentation for large
enrolments in ES and
some JHS;
3. New packages for:
Kinder to Grade 3
2014 newly opened
schools
Un-energized schools
4
1. Replacement of
packages in schools
that received in 2012
2. New packages for:
Senior High School
Senior High School w/
Arts and Design
Additional equipment
for SHSs with Arts and
Design
Pilot Testing of Tablets
for SHSs from selected
3 Divisions ( 1 each for
Luzon, Visayas and