Construction Plan
Planning stage
Carry out studies to determine the feasibility of the Clients requirement.
Selection of site
EXCAVATIONS
THE NUMBER OF PITS NEED TO BE EXCAVATED AS PER THE
EXCAVATION DETAILS
PIT SIZES ARE MENTIONED AS BELOW
C1/F1 106X110
C2/F2 86X96
C3/F3 66X76
C4/F4 56X66
MATERIALS
CEMENT
STEEL
COARSE AGGREGATE
FINE AGGREGATE
CONCRETE MIXING
MIX DETAILS
COLUMNS MIX
M20-1:1.5:3
FOOTINGS MIX
M25-1:2:4
PLINTH BEAMS
M20-1:2:3
FOOTING
HERE THE FOOTING DETAILS ARE MENTIONED IN THE FOOTING PLAN
THE FOOTING DETAILS OF THE STRUCTURE HERE ARE FOLLOWS
FOOTING SIZE
PCC THICKNESS
REINFORCEMENT ON SLAB
CONCRETE FILLING
MASONRY WORK
FOR BRICK WORK UNDER MASONRY 43 GRADE CEMENT WILL BE
USED
HERE IN THESE CONSTRUCTION BRICK ALIGNMENT IS ENGLISH
BOND
FOR CRACK PREVENTION 43 GRADE CEMENT WILL BE USED
STAIR CASE
PARTIAL CONSTRUCTION
Handover Building
Clean, test and handover building to client.