Professional Documents
Culture Documents
1 © Nokia Siemens Networks Flexi Edge Bts Status / Veti/ 10122009
1 © Nokia Siemens Networks Flexi Edge Bts Status / Veti/ 10122009
Wall
installation
Pole
installation
Up
to
150
me
te
r s*
uniqu
e
reducing multiradio
costs
*BB hopping
Slot for
TRS interface
Slot for
0-2 WBCs
HU = 44.4 mm
Remote Tunable
Combiner
DDU/WBC is a flexible
high capacity
combining method
supporting both
wideband and
baseband hopping
Dual TRX
module
System module
System extension
module
30%
90%
BTS sites
70%
BTS energy consumption
goes down
Always enabled, on per timeslot basis
Decision to switch the bias on/off made
dynamically by the BTS during start of
each timeslot.
efficiency low
efficiency high
TRXs manufactured
bias on
BTS+
Flexi
bias off
Copied to UltraSite
NSN
Smart Site
Solution
Example
10
12
13
Solar System
efficiency low
efficiency high
BTS+
Flexi
bias on
bias off
Solar Panels
14
Battery House
EASY INSTALLATION
Cabinet not mandatory, no cranes
Modules carried by one man
POWER
CONSUMPTION
-30% vs. UltraSite 2006
-15% vs. UltraSite 2007
-Real time PA shot down
-DTRX complete shut down
MULTIRADIO SITES
Complements Flexi story
Flexibility for multiradio
installations
PRODUCTIZATION
More value in sw, lisencing for:
MHA support, TRX capacity, DPTRX,
TRS i/f & funct.
Performance
-Matching UltraSite RF
-Feederless Site for
cost effective coverage
15
DIMENSIONS
24TRX in UltraSite 12TRX volume
4+4+4 in height of 86cm and
150kg
TRANSMISSION
ENHANCEMENTS
Flexi optimized for tail and chain sites
FlexiHub adds capacity and new
interfaces
Thank You!
16