You are on page 1of 20

JICA's Activities for

Development of
Infrastructure in Mongolia
Japan International Cooperation Agency
Mongolia Office
October,2013

Railway Flyover (Narnii Guur)

TA for Sustainable Bridge


Maintenance and
Project Period:
Aug 2013 Sep 2015
Management
Project Purpose:
Ministry of roads, transportation's and
municipality of UB's capacity for planning
skills of bridge maintenance is improved.
Targeted Outputs:
1) Concept of "Bridge management cycle" is
widely understood, and guidelines and/or
manuals are developed.
2) Database system to record information of
bridges is developed in nation-wide and UB.
3) National policy on bridge maintenance and
management are developed.
4) Staff members related to bridge / structure
maintenance and management in MRT and
MUB are trained, and trainings are conducted
by Mongolian side.

JICA's Experience of Infrastructure


Projects

Urban Development Master


Urban development master plan is one of JICAs
Plan
technical cooperation activities which support
1)analysis of urbanization trend, 2)planning
concepts, 3)development land use, and
4)formulation of prior project plan.

Country

City

Year

Lao PDR

Vientiane

2011

Indonesia

Surabaya

2011

Afghanista
n

Kabul

2009

Mongolia

Ulaanbaata 2009
r

Vietnam

Hanoi

Kazakhstan Astana

2007
2001

JICA's Experience of Infrastructure


Projects

Airport

Activate economic development by enhancing aerial


transportation for the logistics and movements of
passengers
Country

Airport Name

Year

Mongolia

New Ulaanbaatar Intl Airport

2016

Kazakhstan

Astana Intl Airport

2011

Thailand

Suvarnabhumi Intl Airport(Bangkok)

2007

Kyrgyz

Manas Intl Airport(Bishkek)

2001

Sri Lanka

Bandaranaike Intl Airport(Colombo)

1999

Malaysia

Kuala Lumpur Intl Airport

1998

JICA's Experience of Infrastructure


Projects

Urban Mass Rapid Transit

Reduce traffic congestion and environmental load


Revitalize economic activity of the urbanized area

Country

City

Year

India

Delhi

2004

Thailand

Bangkok

2004

Vietnam

Ho Chi Minh

2006

China

Beijing

1995

Korea

Seoul

1974

JICA's Experience of Infrastructure


Projects

Disaster Management

Formulate hazard map


Construction of evacuation facility
Emergency assistance (Japan Disaster Relief
team)City
Countr
Year
y
Thailand Comprehensive Flood Management Plan
for the Chao Phraya River Basin

2011

Indonesi
a

Self-Sustainable Community
Empowerment Network Formulation in
Aceh Province

2009

China

Dispatch of JDR team to Sichuan


earthquake

2007

JICAs Priority Areas in Mongolia

JICAs Infrastructure Projects in


Mongolia

Ulaanbaata
r Master
Plan 2020

Approval on February 2013

JICAs Master Plan in 2009

JICAs Infrastructure Projects in


Mongolia

water supply and sewerage Stud

On-going/Planned

Seismic Disaster Risk Study

Completed
Grant Aid
Yen Loan
T/A

Narangiin Enger Disposal Site


Metro Study
Thermal Power Plant #4

Railway

Improving the Roads Narnii Zam


Ajilchin Flyover Study

Solar Power Generation

Railway Fly-over (Narnii guur)


Water Supply Facilities in UB
New UB International Airport

JICAs Infrastructure Projects in


Mongolia

RAILWAY FLYOVER (NARNII


GUUR)
Grant Aid Project
Project Cost: 3.6 Billion JPY
Bridge Length: 260m
Connecting Road: 630m
First Large Metal Bridge in Mongolia

JICAs Infrastructure Projects in


Mongolia

NEW ULAANBAATAR INTERNATIONAL AIRPORT


Yen Loan Project
Solution for demand increase of aviation
movements
Construction of new global gateway to

JICAs Infrastructure Projects in


Mongolia

FEASIBILITY STUDY OF UB METRO

PPP-FS Scheme
Proposed by Master Plan 2020
To reduce traffic congestion
To promote underground development in
Ulaanbaatar

JICAs Infrastructure Projects in


Mongolia

IMPROVEMENT OF CAPACITY OF 4TH POWER


PLANT
Collaboration of Yen Loan, Grant Aid, TA and
Volunteers
Supporting the economic development as
basic infrastructure since 1990

JICAs Infrastructure Projects in


Mongolia

Water project by
WB under USIP2

New Water Pipe


(18.8km)
New Water Sources (21 wells)

WATER SUPPLY DEVELOPMENT IN GACHUURT

Grant Aid project


Scheduled for completion in November 2014
Benefit 390,000 ger area and 40,000 urban area
residents
To provide the basic social service to ger area

JICAs Infrastructure Projects in


Mongolia

NARANGIIN ENGER DISPOSAL SITE & SOLID WASTE


MANAGEMENT
Collaboration of Grant aid and TA
Construction of new disposal Site
Provision of equipment, garbage trucks
Capacity development for maintenance and
management
First sanitary landfill in Mongolia

JICAs Infrastructure Projects in


Mongolia
TA: Strengthening the Capacity of
Seismic Disaster Risk Management
(2012-2013)
To enhance disaster prevention ability by risk
mapping , formulating disaster prevention planning,
and, capacity development

Grant Aid: Improvement of Capacity of


Fire Fighting Techniques and
Equipment(2013)
Provision of 22 units fire truck, water tank car, car
lighting etc.

Grant Aid: Improvement of Fire


Fighting Equipment and Maintenance
Workshop(2001)
Maintenance of equipment and provision of 17 units

JICAs Infrastructure Projects in


Mongolia

CAPACITY DEVELOPMENT PROJECT FOR URBAN REDEVELOPMENT


Technical Assistance Project
Technology transfer the concept of land
readjustment in Japan
Formulating urban re-development legal system
To reduce traffic congestion and air pollution
in Ulaanbaatar

JICA will support infrastructure


development;
-as new solutions for challenges in
Mongolia,
-as contribution for peoples life in
Mongolia