Professional Documents
Culture Documents
O & M For BTS 3012: Internal
O & M For BTS 3012: Internal
O&M
for BTS 3012
www.huawei.com
Connect the other end of the cable to the network port of the
Site Maintenance Terminal System (your PC)
Step 4 In the Select Communication Port list box, choose Network Port.
In the Configure IP list box, set the IP address of the DTMU to 129.12.15.15
(default IP address).
Click OK. The Site Maintenance Terminal System window is displayed
It means that the Site Maintenance Terminal System starts successfully
The BTS is reinitiated. BTS configuration data is loaded, but the program is
not loaded.
Fourth level reset:
Reset the BTS hardware. Load data. Load program from the flash memory.
Reset port:
Ring network Port 0 is forward link, and port 1 is reverse link. Non-ring
network Not selected.
BIU loop test tests if the RSL on the data bus (DBUS) is normal.
TRX self-test tests the TRXs and reports the test result.
This test is used to test the receive and transmit performance on the air interface.
BIU loop test
The DTMU provides a path for the TRX to implement loop test. This test is used to test the performance
of the DBUS.
BTS sound loop test
This test is used to test the connection of the TRX speech channel between the air interface and the
DBUS.
TRX sound loop test
This test is used to test the connection of the TRX speech channel between the air interface and the
Digital Signal Processor (DSP).
This function is used to query the software version and alarm number of a board.