Professional Documents
Culture Documents
ICP OM ConstructionCivilEng
ICP OM ConstructionCivilEng
Outline
2 Data Requirements
3 Overall Methodology
6 Timetable
2
Classification of the Construction
Sector
3 Categories
3 Basic of Input 50 Input Resources
Headings Resources
3
Data Requirements Residential Non Residential Civil Engineer.
Expenditure Value Expenditure Value Expenditure Value
Materials Resource Mix [%] Resource Mix [%] Resource Mix [%]
Importanc Importanc Importanc
1 Price Price Price
e e e
Importanc Importanc Importanc
e Price e Price e Price
Importanc Importanc Importanc
38 e Price e Price e Price
Equipment Resource Mix [%] Resource Mix [%] Resource Mix [%]
1 Hire Rate Hire Rate Hire Rate
Labour Resource Mix [%] Resource Mix [%] Resource Mix [%]
1 Labor Rate Labor Rate Labor Rate
7 Labor Rate Labor Rate Labor Rate
Contractors mark-ups
Professional Fees 4
Overall Methodology
Aggregate the PPPs for the 3 subheadings using the Resource Mixes
3
to obtain weighted PPPs for the 3 BHs
Adjust the 3 BH PPPs for mark ups, professional fees and end-user
4
taxes
5
A 7-Sheet Survey Questionnaire
2 Explanatory Notes
3 Material
4 Equipment
5 Technical
5 Labour
Survey Forms
7 Supporting Information 6
1. Introduction
1 Country
2 Currency
Survey respondent
3 Name
4 Employer
7
2. Notes Item Descriptions
Locally Identical or
available Materials and collect
General equivalent to
Identify and their
notes Commonly services
prescribed
items prices
used
8
2. Notes - Prices
9
3. Material Layout of the questionnaire
1 2 3 4 5 6 7 8 9 10
Specifications Pref. Alternati Unit Non Civil
Ref Item Residential Notes and Comments
Notes Unit ve. Unit Price Residential Engineering
Aggregat
Clean, hard,
01 e for
concrete strong
m3 1 1 1
02 1 1
03 1
1 1
36 1
37 1
Typical
Electriv
38
ity
average KWhr 1 1
commercial..
Enter 1 or * if important
Comments
10
4. Equipment Layout of the questionnaire
1 2 3 4 5 6 7 8
Specifications Pref. Alternative. Unit Price with Unit Price without
Ref Item Notes and comments
Notes Unit Unit operator operator
02
03
04
Rated
Compact track
05 capacity: 864 hour
loader
kg
Comments
11
5. Labour Layout of the questionnaire
1 2 3 4 5 6 7
Pref. Alternative. Number of
Ref Item Unit Price Notes and comments
Unit Unit hours
02
03
04
06 Electrician hour
Comments
12
6. Project Prices Layout of the questionnaire
1 2 3 4 5 6
Pref. Alternative.
Ref Project Type Unit rate Notes and comments
Unit Unit
m 2 floor m 2 floor
Two storey attached house, mass market, centre unit in terrace/
02 area area
row of four units, otherwise as above
03
04
The collection of project prices is optional as those prices are not essential for the calculation of PPPs. They
can however be used as an additional resource in the validation process.
13
7. Supporting Information Layout of the
questionnaire
Non Civil
The mix of construction resources Residential
Residential Engineering
02 Construction equipment
Non
Contractors mark-ups Residential
Residential
Civil E.
01
Total mark-up of which, general site costs and
temporary works
03 Profit
Non
Professional Fees Residential
Residential
Civil E.
E E
27% 25%
M M
L L
63% 63%
10% 12%
Civil Engineering
M E
47% 23%
L
30%
15
Overall Validation Process
Data Compilation
16
Timetable
2011
17
THANK YOU
18