Professional Documents
Culture Documents
Fix Presentasi Preparasi Kel. 1
Fix Presentasi Preparasi Kel. 1
Assalammualaykum wr wb
Kelompok 1
Data Tiap
Interpretasi
Fraksi
Flowsheet Tabel
Coal Washing Washability
Plant Composite
Kurva
Washability
Composite
Studi Kasus
Produksi PT. NaQxn Coal Company = 8400 ton/hari = 360 ton/jam
(1 hari = 20 jam) = 187.200 ton/bulan (1 bulan = 26 hari kerja)
BACK
Data Tiap Fraksi
Fraction (mm) Mass (%) Cummulative Mass (%)
-150+100 10 10
-100+50 9.2 19.2
-50 + 11.2 15.5 34.7
-11.2 + 4 12.5 47.2
-4 + 1.4 8.5 55.7
-1.4 + 0.5 14.8 70.5
0.5 29.5 100
BACK
Tabel Washability Composite Fraksi +50 -0.5
Tabel Washability Composite Fraksi +150 - 0.5
BACK
Kurva Washability Composite Fraksi +50 -0.5
Relative Density
0 102.1 202.0
2.2 2.2
2.1 2.0 1.9 30 1. 9 1.8
40 1.8 50 1.7 1.7 60 1.6 1.670 80
1.51.5 90
1.4
1.4 100
1.3
0 1.2 100
1.3 1.2
10 90
20 80
30 70
Cum Mass % Floats
Cum Mass %
40 60
50 50
60 40
70 30
80 20
90 10
100 0
Ash %
Instantaneous Ash Curve Cum Float Curve Relative Density Curve Near Gravity Curve Cum Sink Curve
Kurva Washability Composite Fraksi +150 -0.5
Relative Density
2.2 02.1
2.2 102.12.0 202.0 1.9 30 1. 9 1.8
40 1.8 50 1.7 1.7 60 1.6 1.670 80
1.51.5 90
1.4
1.4 100
1.3
0 1.2 100
1.3 1.2
10 90
20 80
30 70
Cum Mass % Floats
Cum Mass %
40 60
50 50
60 40
70 30
80 20
90 10
100 0
Ash %
Instantaneous Ash Curve Cum Float Curve Relative Density Curve Near Gravity Curve Cum Sink Curve
BACK
Flowsheet Coal Washing Plant
BACK
INTERPRETASI
Pada Fraksi +50 -0.5
Batubara bersih : 89% = 99714.89 ton/bulan
Batubara kotor : 11% = 12324.31 ton/bulan
Densitas yang digunakan : 1.69
Tingkat kesukaran : Moderate
BACK
Terima Kasih
Wassalammualaykum wr wb