M160100CE LIFTING OPERATION VS FLOATOVER INSTALLATION
Lifting Operation Floatover Installation
FABRICATION On yard in modules On yard as one unit
TRANSPORTATION On Barge/ HTV On Barge/ HTV INSTALLATION Modulewise Single Unit HOOK UP AND May get delayed due to Facilitates on time COMMISSIONING multiple heavy lift commissioning as TIME operations and installation multiple lift operations work are avoided. FLOATOVER OPERATION Multiple stages of floatover analysis are Load out analysis Stability Analysis During Transportation Motion Analysis Mooring Analysis Motion at Entrance Mating Load Analysis Motion at Exit Reference Min He, Ruhua Yuan, Huailiang Li, Installation Division, Offshore Oil Engg. Co. Ltd, Tianjin China- Floatover Installation Analysis and its Applications in Bohai Bay. Jilles van de Peppel, Eelco Manders, Dockwise,July 2014 Dockwise Float-over Seminar: Engineering for Float-overs C.Tribout,D. Emery, P.Webwer, Technip and R.Kaper, Dockwise,OTC19073 Floatovers Offshore West Africa.