UBP PERAK DAN GRATI

PT.INDONESIA POWER
UBP PERAK & GRATI fresh and clean

SELAMAT DATANG
MAHASISWA POLITEKNIK NEGERI MALANG

28 September
2011
Jakarta, 2010
oleh
WAHYU TRI ASMARA
SPS RENVAL OPERASI & NIAGA
UBP PERAK DAN GRATI
fresh and clean
PEMBANGKIT LISTRIK
UBP PERAK DAN GRATI PT. INDONESIA POWER fresh and clean

UBP. SURALAYA UBP. PRIOK UBP. SEMARANG UBP. PERAK GRATI


PLTU Batu Bara PLTG, PLTGU & PLTD PLTG, PLTU & PLTGU PLTU & PLTGU

3,400 MW (16 %) 1,446 MW (37.87 %) 1,469 MW (16.36 %) 864 MW (9.62 %)

Cilegon
Jakarta

Total Daya Terpasang


Bandung Semarang
Garut 8,978 MW
Banjarnegara Surabaya

Grati

UBP. SAGULING UBP. KAMOJANG Denpasar


PLTA PLTP UBP. MRICA
PLTA
798 MW ( 8.89 %) 375 MW (4.01 %) UBP. BALI
PLTG & PLTD
306 MW ( 3.41 %)
335 MW (3.73 %)
DENAH LOKASI PLTGU GRATI
UBP PERAK DAN GRATI
fresh and clean

Selat Madura
Letak Geografis
7o3904,41 LS
113o0127,35 BT

OPF
Santos Intake

Outlet
condensor Common
Unit

Tanki HSD Gedung


admin

Gas Turbin
DAYA TERPASANG
UBP PERAK DAN GRATI
UBP PERAK GRATI fresh and clean

UBP
PERAK DAN GRATI
MULAI OPERASI : JANUARI 1997
BLOK 1 = 450 COMISSIONING : APRIL 1996
MW 3 GT = 3 X 100 MW
1 ST = 1 X 150 MW

PLTU PERAK
PLTGU GRATI BLOK 2 = 300 MULAI OPERASI : JANUARI 1997
100 MW MW COMISSIONING : APRIL 1996
750 MW 3 GT = 3 X 100 MW

UNIT 3&4 = 100 MW MULAI OPERASI : TAHUN 1978


UBP PERAK DAN GRATI VISI DAN MISI
fresh and clean

Visi
Menjadi Perusahaan yang bergerak dibidang Pembangkit
Tenaga Listrik Gas Alam dengan kinerja berstandar Internasional
yang ramah dan peduli lingkungan

Misi
Mengelola bisnis Pembangkit Tenaga Listrik Gas Alam
dan bisnis lainnya yang berkompeten secara etis dan profesional
dengan memberdayakan potensi serta sumber daya yang ada
secara optimal, melalui kemitraan guna menjamin
kesinambungan dan pertumbuhan Perusahaan

Motto
Fresh and Clean Power Plant
KEUNGGULAN
UBP PERAK DAN GRATI UBP PERAK DAN GRATI fresh and clean

Merupakan Pembangkit Listrik yang memproduksi energi listrik


dari energi gas bumi yang bersih dan bersahabat dengan
lingkungan

Merupakan Pembangkit Listrik dengan pola operasi Base Load


yang terhubung dalam sistem transmisi JAMALI

Merupakan Pembangkit Listrik yang mempunyai


Reliable/Keandalan yang tinggi, Safety/Keamanan resiko rendah
dan Lingkungan sesuai standar

Merupakan Pembangkit Listrik yang bersertifikasi SMT (ISO 9001,


ISO 14001, SMK3, & OHSASS), PROPER BIRU, Pelabauhan ISPS
code sertified.

Memiliki sertifikat SMP (Sistem Manajemen Pengamanan) terpadu


dengan score 93,67 (bendera emas tertinggi se Indonesia)
PRESTASI DAN
UBP PERAK DAN GRATI PENGHARGAAN fresh and clean

No Penghargaan Kriteria Periode Sertifikat


24 Apr 2003 19 Des
1. Sistem Manajemen Mutu ISO 9001:2000 SAI Global
2009

Sistem Manajemen ISO 14001:2004 18 Jul 2005 16 Sept


2. SAI Global
Lingkungan 2011
SMK3 03 Jan 2005 06 Feb
Sucofindo
Sistem Manajemen Kesehatan OHSAS 2011
3. Sucofindo
& Keselamatan Kerja (K3) 18001:2007 15 Mar 2005 14 Mar
2011
Biru 2004 2005
PROPER (Program Penilaian Kementerian
Biru 2006 2007
4. Peringkat Kinerja Pengelolaan Lingkungan
Biru 2008 2009
Lingkungan) Hidup
HIJAU 2010
Sistem Manajemen
5. Emas 2010 2013 Kepolisian RI
Pengamanan (SMP)

6. Zerro Accident Emas 2009 Depnaker


GRATI
UBP PERAK DAN GRATI
COMBINED CYCLE POWER PLAN fresh and clean

Kapasitas terpasang : 764.08 MW


Block I C/C
GT : 3 x 100,75 MW
ST : 1 x 159,58 MW

Block II O/C
GT : 3 x 100,75 MW
Block I beroperasi sejak 1996.
Block II pada tahun 2002.

Bahan Bakar Gas dan Minyak HSD

Supply gas mulai September 2009


dari PT Santos ( 60 BBTUD)
Diagram Proses PLTGU
UBP PERAK DAN GRATI
Losses : > 110.0C
25 MW HEAT LOSS (52 min fresh and clean
)
40 MW 101.6 57231.37 kWh
4
Start HRSG 50 MW 95.23
66.03 MW
50 MW 79.36 /92.18 jt
60 M 68.18
W
70 MW 54.48
75 MW 36.34
Fuel 75 MW 18.17
75 MW 0.00
125 0 C

Air
o
451ooC
470
467
462
C 451 0 C

GTG

58o
IGV : 56 DMPR : 100%
0%
90%
80%
45%

30%
40%
Supply Gas PLTGU Grati
UBP PERAK DAN GRATI
Supply Gas PLTGU Grati
UBP PERAK DAN GRATI
UBP PERAK DAN GRATI SPESIFIKASI GAS TURBIN
fresh and clean

Pabrikan : Mitsubishi Heavy Industries,Ltd, Japan


Tipe : MW-701
Tahun pembuatan : Nopember 1993.
Jumlah stage :4
Putaran : 3000 rpm
Kapasitas iso peak : 134,100 kW
Kapasitas site base : 113,840 kW.
Temp. udara masuk : 32 oC
Temp. Gas Buang : 533 oC
Bahan bakar : Minyak (HSD) / Gas.
UBP PERAK DAN GRATI SPESIFIKASI HRSG
fresh and clean

Pabrikan : CMI (Cookerill Mechanical Industries)


Tipe : Vertical with Assited Circulation
Tahun pembuatan : 1995.
Exhaust Gas : 1500 t/h ( Bahan Bakar Gas )
1502 t/h ( Bahan Bakar HSD )
Temperature : 531 o C
507 o C
Steam Flow 100% : HP 181,89 t/h / LP 49,50 t/h
: HP 507 o C / LP 161,1 o C
: HP 71,04 kg.cm2 / LP 6,50 kg.cm2
UBP PERAK DAN GRATI SPESIFIKASI TURBIN UAP
fresh and clean

Pabrikan : Mitsubishi Heavy Industries,Ltd, Japan


Tipe : TC2F-33.5
Tandom Compound two casing double
Exhaust
Rated Output : 189,500 kW.
Jumlah stage : 20 dan 5 X 2 .
Putaran : 3000 rpm (Clock wise)
Tekanan Uap Masuk HP: 75 ata / 505 oC
Tekanan Uap Masuk LP: 5,2 ata / 176 oC
Tekanan Exhaust : 697 mmHg.
Sistem Pengaturan : EHC .
UBP PERAK DAN GRATI SPESIFIKASI GENERATOR
fresh and clean

Pabrikan : Siemens AG, Germany


Tipe : TLRI 108/36 - 50S LEFT
Tahun pembuatan : 1995.
Fasa : 3 phasa, YY - WVU
Frekuensi /Putaran : 50 Hz/ 50 s-1
Faktor Daya : 0,8
Eksitasi : 375 V, 866 A.
Klas Isolasi : Mat.F, IM7215. IP 54
Pedingin : Air Cooling 34oC
UBP PERAK DAN GRATI SPESIFIKASI TRAFO UTAMA
fresh and clean

Pabrikan : Trafo Union.


Tipe : TRUM 8552
Tahun pembuatan : 1995.
Fasa / Frekuensi : 3 phasa./ 50 Hz
Daya Pengenal : 184.50 MVA (ONAN)
246.00 MVA (ONAF)
307.50 MVA (ODAF)
Vektor Group : YNd1d1
Tipe minyak isolasi : Shell Diala B.
Temp. minyak / Belitan : 52 / 57 oC
Tap Changer : Off Load.
SINGLE LINE DIAGRAM PLTGU GRATI

UBP PERAK DAN GRATI


fresh and clean
PAITON 2 PAITON 1 KRIAN 2 KRIAN 1 PIER 2 PIER 1 SST 1 SST 2

500 KV 150 KV

150/6 KV 150/6 KV

10,5 / 500 KV
15,75 / 500 KV 10,5 / 150 KV
20 KV
10,5 / 500 KV 10,5 / 150 KV

IBT 500/150 KV
G G G G G G G

ST 1.0 GT 1.3 GT 1.2 GT 1.1 GT 2.3 GT 2.2 GT 2.1

Output Daya:
PLTGU Blok I : 500 KV
PLTG Blok II : 150 KV
PLTU PERAK
UBP PERAK DAN GRATI
fresh and clean

Kapasitas terpasang :
PLTU Perak Unit 1 dan 2
berkapasitas 2x25 MW beroperasi
sejak 1964 dan out service pada
tahun 1996.

PLTG Perak berkapasitas 1x29 MW


beroperasi sejak 1975 pada tahun
1996 dipindahkan ke Cilacap.

PLTU Perak Unit 3 dan 4


berkapasitas 2x50 MW beroperasi
sejak 1978 sampai sekarang.

Lokasi di Pelabuhan Tanjung Perak


Jln. Nilam Barat No. 2-4 Surabaya
PEMBANGKIT LISTRIK TENAGA UAP
UBP PERAK DAN GRATI ( PLTU ) MINYAK
fresh and clean
UBP PERAK DAN GRATI KINERJA PRODUKSI UBP PGT
fresh and clean

PENJUALAN (MWH)

4,000,000

3,500,000

3,345,149
3,000,000

2,844,181
2,500,000
2,416,900 2,450,935
2,000,000 2,192,247

1,843,991
1,500,000 1,670,778 1,658,477
1,465,328
1,000,000
880,344
500,000

0
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011(s/d
AGT)
Tahun
DATA PENJUALAN UBP PERAK GRATI TAHUN
2002-2011 (GWh)

2645.1, 12.7%

3684.8, 17.7%

PLTU
PLTGU
PLTG

14438.4, 69.5%
UBP PERAK DAN GRATI KINERJA UBP PGT
fresh and clean
EAF DTP (%)

94.00
92.00
90.00 92.79
91.40 88.24 91.39 91.41
88.00 90.63
89.19
86.00 88.21
84.00
82.00
82.67 83.20
80.00
78.00
76.00
2002 2003 2004 2005 2006 2007 2008 2009 2010 REN
2011
EFOR (%)
%
16.00
14.11
14.00
12.00
10.00 11.36
8.00
6.00 7.41 7.26
4.00 5.43 5.56
1.49 1.10
2.00 3.52 3.31
0.00
2002 2003 2004 2005 2006 2007 2008 2009 2010 REN
2011
Tahun
SISTEM TENAGA LISTRIK JAMALI (500kv)
UBP PERAK DAN GRATI
fresh and clean

LAUT JAWA
SLAYA U S LIRA
PRIOK MKRNG

CLGON GU GU
J TAKE TGRNG
BKASI
AS AHI GU
U
ACC MTWAR
KKSTL
SRANG KMBNG CWANG KSBRU HRGLS

CBATU J TBRG
GNDUL J TLHR JAVA
DPOK H
A
SRAGI J PARA
MENES CBBAT
BUNAR
BGBRU CIBNG A
CRATA UBRNG TBROK PATI
MADURA
PDLRG KUDUS
GRSIK
RBANG
BDSLN CRBON PMLNG
GU
BABAT
P SGLNG BLORA LNGAN U
A KRPYK
SALAK ACC KBSEN PKLON GU GLTMR BKLAN
SMNEP
WLERI ACC CEPU
CGRLG KMJ NG
BMAYU S PANG PMKS N
CNJUR P UNGAR UNGAR A
BJ GRO U PERAK
GARUT KLBKL MRICA SGMDU
KDMBO
DRJ AT P MJ NNG GARNG
A
RWALO S GRAH KRIAN ACC
CAMIS J ELOK
A
WSOBO SRGEN WARU
TSMYA BNJ AR NGAWI
TASIK PWRJO BOJ LI J AJ AR BNGIL
LMNIS KNTUG
G GBONG PEDAN MKRTO GRATI PITON
PALUR
SURYA U STBDO
MNRJ O
BNTUL KLTEN PBLGO
MGUNG KBAGN
KDBRU
LWANG
BDWS O BWNGI
BALI
PCTAN
Wilayah TeganganRandah TRGLK A A PMRON
LMJ NG GLNUK
WLNGI KKTES BTRTI
BTRTI GNYAR
KAPAL AMLRA
JMBER
NGARA
KRBKN S ANUR

PSGRH G

NS DUA

SAMUDRA INDONESIA
SUBSISTEM REGION JAWA TIMUR DAN BALI
BANDUNG/
MANDIRANCAN
UBP PERAK DAN GRATI 1,318.0 MW

694.1 MW
~ PLTGU GRSIK fresh and clean
( Block 2&3 )
896.1 MW 1,322.9 MW

IBT UNGAR IBT KRIAN PLTU PITON ( 1&2 ) : 743.0 MW


IBT GRSIK
500/150 kV 500/150 kV
500/150 kV
PLTU PITON ( JP 5&6 ) : 610.0 MW
( 2x500 MVA ) ( 2x500 MVA ) PLTGU GRATI PLTU PITON ( PEC 7&8 ) : 1,291.0 MW
( 1x500 MVA )
699.0 MW 202.0 MW ( Block 1 )
288.2 MW Total Thermis : 2,644.0 MW
~ ~
Ke Region-3 1,089.7 MW
GI. Cepu
31.0 MW
IBT PEDAN Madura
500/150 kV
( 2x500 MVA )

IBT GRATI IBT PITON


500/150 kV 500/150 kV
( 1x500 MVA ) ( 2x500 MVA )

Sub Sistem Barat 55.0 MW 390.3 MW


850.0 MW
RJTD+IBT KRIAN, GRESIK, GRATI & KDIRI
2,183.6 MW
1,164.0 MW

A B KOPEL BUS
BNGIL TERBUKA

IBT KDIRI Sub Sistem Timur


500/150 kV IBT PITON
SKLT
(1 2x500 MVA ) 820.8 MW
314.0 MW 82.0 MW
(Tidak Termasuk Bali)

Bali
363.0 MW
~ ~
PLTA TLGPA : 31.0 MW
PLTGU GRSIK ( Block 1 ) : 308.5 MW
PLTA MDLAN : 10.0 MW PLTGU GRATI ( Block 2 ) : 301.3 MW PLTA STAMI : 100.8 MW
PLTU GRSIK : 488.3 MW
PLTA SIMAN : 7.5 MW
PLTU PERAK : 57.1 MW Total Thermis : 301.3 MW PLTA WLNGI : 28.0 MW ~
PLTA GLANG : 1.5 MW PLTA SGRUH : 17.0 MW
PLTG GRESIK : 32.0 MW
PLTA GRNGN : 1.7 MW PLTA LDOYO : 4.5 MW
PLTG GILITIMUR : 31.0 MW PLTG GLMNK : 129.9 MW
PLTA NGBEL : 0.0 MW PLTA SLRJO : 2.7 MW
Total Thermis : 916.9 MW PLTG PSGRN : 103.2 MW
Total Hydro : 51.7 MW PLTA WNRJO : 3.2 MW PLTD PSGRN : 47.9 MW
Total Hydro & Thermis : 968.6 MW Total Hydro : 156.2 MW Total Thermis : 281.0 MW
Total Hydro & Thermis : 457.5 MW
UBP PERAK DAN GRATI
fresh and clean
02
UBP PERAK DAN GRATI
fresh and clean

Beban Puncak Oktober 2011


MW
21,000

20,000

19,000

18,000

17,000

16,000

15,000
Jan Peb Mar Apr Mei Jun Jul Agt Sep Okt Nop Des
ROT 18,050 18,470 18,942 19,216 19,280 19,325 19,308 19,358 19,397 19,626 19,793 19,634
ROB 17,950 17,925 18,627 18,693 18,800 18,900 18,950 18,950 19,100 19,150
Realisasi 18,044 18,374 18,115 18,673 18,884 18,598 18,916 18,804 18,865
UBP PERAK DAN GRATI
fresh and clean
Nov10 OK

99%ROT,
Growth
Beban Puncak Malam
UBP PERAK DAN GRATI 5,2%
fresh and clean
18,500

18,000 18,100
MW

17,999

17,500

17,000

16,500

16,000

15,500

15,000
Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
Real 2008 16,166 15,834 15,791 16,184 16,025 15,951 16,199 16,301 16,233 16,236 15,620 15,570
Real 2009 15,442 15,425 15,918 16,376 16,582 16,580 16,628 16,837 16,941 17,160 17,211 17,162
ROB 2010 17,225 17,065 17,100 17,500 17,750 17,900 18,050 18,000 18,050 18,100 18,100 18,025
Real 2010 16,885 17,157 17,503 17,776 17,896 17,802 17,645 17,840 17,860 18,100 17,999 17,919

EVO-SJB NOV-DES 2010 28


OK

Nov10:
Beban Puncak Siang 100% ROB
UBP PERAK DAN GRATI Growth 5,5%
17,500
fresh and clean

17,000
MW

16,500 16,769
16,424
16,000

15,500

15,000

14,500

14,000

13,500

13,000
Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
Real 2008 14,667 14,066 14,354 14,673 14,604 14,513 14,653 14,678 14,807 14,966 14,345 14,518
Real 2009 14,389 14,316 14,845 15,378 15,418 15,542 15,520 15,576 15,773 15,983 15,867 16,189
Real 2010 15,911 16,262 16,668 16,824 16,865 16,695 16,464 16,483 16,470 16,769 16,658 16,424
ROB 2010 15,675 15,989 15,785 16,282 16,452 16,958 16,975 17,113 17,236 16,819 16,705

EVO-SJB NOV-DES 2010 29


Pertumbuhan Energi Distribusi 2010
UBP PERAK DAN GRATI
14,00% fresh and clean

12,00% 10,57%

10,00%
8,05%
8,00%
5,40% 5,80%
6,00%

4,00%

2,00%

0,00%
SM-1 TW-3 Nop Jan-Nop'10
Jaya-Tgr 10,38% 3,03% 7,66% 7,30%
Jabar-Btn 12,57% 5,47% 4,06% 9,06%
Jateng-DIY 8,47% 6,43% 4,11% 7,02%
Jatim 8,93% 7,45% 6,74% 7,84%
Bali 11,55% 11,46% 9,27% 11,32%
Total Dist 10,57% 5,40% 5,80% 8,05%

EVO-SJB NOV-DES 2010 30


UBP PERAK DAN GRATI
Pertumbuhan Energi Distribusi 2010
fresh and clean
12%
Chart Title
10%

8%

6%
Axis Title

4%

2%

0%

-2%
Jaya-Tgr Jabar-Btn Jateng-DIY Jatim Bali Total Dist
2009 2,25% 2,32% 6,12% 3,21% 8,59% 3,16%
2010 7,30% 9,06% 7,02% 7,84% 11,32% 8,05%

EVO-SJB NOV-DES 2010 31


UBP PERAK DAN GRATI
REN
fresh and clean
REAL
1 C
2 3
22,000

21,000

20,000

19,000

18,000
MW

17,000

16,000

15,000
1. Demolish Muarakarang 242 MW;
2. Labuan #2 280 MW (Ok);
14,000
3. Pemaron & Pesanggaran 65 MW
13,000

12,000

11,000

10,000
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52
Minggu
Minggu
Mampu Pasok Cad. Opr. FO Der Variasi Musim MO PO Beban Puncak
Rp/kWh

0
3.000

500
1.000
1.500
2.000
2.500
3.500
GRT2
CLP
SGL
UBP PERAK DAN GRATI

GRSG
CRT
REG1
3.380

REG2
REG3
SGL
MRC
REG4
STMI
BRTS
RENC

JTL
CLG
GRS-B3
GRS-B1
LBN
GRS-B2
TJB
MKR-R
GRT1
PTN
REAL VC

JP
MKR-B1
PEC
SLY57
SLY14
DRJ
CLP
MTW-B1
KMJG4
DING
SLK13
WWD

EVO-SJB NOV-DES 2010


DRJ2
DRJ3
SLK46
PRK-GU
CKRNG
MTW-B4
GRSK-U
KMJ
PRK-G
TBR
Harga Energi November 2010

GRS12
PRAK
TBR
MKR45
PSRN
GLM
PSRN2
PMRON
34

MTW B3
fresh and clean
OK

Aliran Daya Saat Beban Puncak Malam


UBP PERAK DAN GRATI
Rabu, 10 November 2010 19:30 WIB BP 17.992 MW fresh and clean

7.271 MW Jawa-Bali: 170 MW


3.614 MW
Jawa-Madura: 131 MW
502
SLAYA

KMBNG 2.705 MW 3.685 MW


CLGON 483 BKASI
GU MTWAR

483 DPOK
GNDUL
CBATU
MDCAN
480 508 TJATI
CWANG
JAWA
CIBNG
CRATA
BDSLN
494
MADURA
GRSIK

SGLNG
498 496
UNGAR
499
KRIAN 534 MW
500 TASIK
PEDAN 496
GRATI PITON

5.729 49 KEDIRI

MW 6 499 492
4.015
MW 2.537
MW
5.592
MW 276 MW

EVO-SJB NOV-DES 2010


UBP PERAK DAN GRATI
fresh and clean

EVO-SJB NOV-DES 2010 36