You are on page 1of 40

A TRAINING ON BTS NOKIA

INSTALLATION AND
COMMISSIONING
SUMITTED TO :-
PRESENTED BY,
SAURABH BANSAL
DEPT. OF ECE
B.TECH (ECE)
Vth SEM
nov-12 SAURABH BANSAL B,.TECH ECE v SEM 1
Contents

Introduction about GSM system and BTS


Function.
Overview about BTS NOKIA (Flexi EDGE
BTS).
Outstanding features of Flexi EDGE BTS
Somes main Features of Flexi EDGE BTS
Guideline to Commissioning

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 2


NOKIA FLEXI EDGE BTS
INSTALLETION
COMMISSIONING AND
PLANNING

BASE TRANSCEIVER STATION


nov-12 SAURABH BANSAL B,.TECH ECE v SEM 3
. Monkey Wrench Cable ties cutter

Side Cutter

. Crimping Tool for 16Sq.mm to 70Sq.mm cables. .Measuring Tape (30M).

.Flash light ,pocket lamp or torch.


. Torque Wrench set 6.7 101.7 NM . And 1 NM

nov-12 4
SAURABH BANSAL B,.TECH ECE v SEM
. Hammer Drill . Extension Board.

. Drill with screw driver . Tool Case

. Marker Pen or Comparable tool


. Scissor

. Multigrip Pliers

. Leveling tool

nov-12 5
SAURABH BANSAL B,.TECH ECE v SEM
TEST EQUIPMENTS REQUIRED FOR COMMISSIONING

1.VSWR METER

2. POWER METER

3. SITE MASTER

4. DIGITAL MULTIMETER

nov-12 6
SAURABH BANSAL B,.TECH ECE v SEM
WHAT IS GSM?
GSM is a TDMA based wireless network technology
developed in Europe that is used throughout most of
the world. GSM phones make use of a SIM card to
identify the user's account. The use of the SIM card
allows GSM network users to quickly move their
phone number from one GSM phone to another by
simply moving the SIM card. Currently GSM networks
operate on the 850MHz, 900MHz, 1800MHz, and
1900MHz frequency bands.

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 7


GSM SYSTEM

Um Interface

PSTN
MS TUP,ISUP ISDN
BTS PSPDN
BSC
A Interface
MS MSC/VLR

MAP
BTS

BTS HLR/AUC/EIR
SMC/VM
MS
BTS OMC (NOC and O&M)

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 8


WHAT IS USE OF GSM BTS IN FUTURE?
Two highlights in the rich development of the 3G
networks are advanced technologies and high
efficiency.
the GSM network is the most widely applied
network in the world.
the GSM network is still favored and constantly
evolves due to the maturity of technical applications
and business models.

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 9


Features of Flexi EDGE BTS & its fun

Interface between MS and BSC


Transmission function, which manage transfer
of traffic and control data between BTS and
BSC.
O&M Functions, which supervise the
operation of the BTS.
External Alarm collection.
Measure Uplink and downlink signal.
.

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 10


SOME KINDS OF NOKIA BTS
Talk Family
Flexi talk (900/1800 2TRX)
City talk (900/1800 6TRX)
Intratalk (900/1800 6TRX)
1. Flexi talk GSM 900/1800 BTS 2TRX.
Flexitalk is Mini BTS located insite the house, office.. where another
Network cant cover it. It have only 2 TRX, using twisted cable or
coaxial cable (2Mbit/s).
2. City talk (900/1800 6TRX)
Called Indoor BTS, it can be able to use any where. Maximum
capacity is 6TRX. All kind of transmission is supported.
3. Intratalk (900/1800 6TRX)
Called outdoor BTS,
important position in the network
Ultra site:
Maximum capacity is 12TRX.
Support GPRS, EDGE

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 11


SOME KINDS OF NOKIA BTS

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 12


NOKIA FLEXI EDGE BTS

Features
FLEXI EDGE BTS is a Modular base station for
GSM/EDGE capacity and coverage.
Easy to install, reduce..
Taking the temparature from -33C +50 C
Support up to 24 TRX (12 hual TRXs)
Support Double Power TRX

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 13


CONSTRUCTION OF FLEXI BTS
AND PREPARATION OF SITE

System module (ESMA)


Dual TRX module (EXxA) EXTA GSM800
Dual duplexer module (ERxA) EXGA GSM900
EXDA GSM1800
Transmission module
EXPA GSM1900
Power module
Wideband combiner (EWxA)

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 14


EDGE SYSTEM MODULE (ESMA)
Main features:
Module for BTS common functionalities and internal/external
connections Supports up to 6 DTRX modules (up to 12TRX)
5 main functions of the module:
BTS O&M: SW downloading and storing (2 * BTS SW),
configuration management, reference clock and alarms
BB switching: communication between modules via Ethernet
switch
BTS power distribution: single point for power intake and power
distribution to all modules
The BTS Software is stored in ESMA.
Connect to BSC by Abis interface

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 15


EDGE SYSTEM MODULE (ESMA)

Synchronization
O In PDU (power
ut distribution
unit)
48V intake

PDU (power
distribution unit)
6x48V to other
modules 1xEAC
6x Ethernet to (External
DTRX Alarm &
Control)
12x alarm
Site support
system, MIBBU inputs+6
alarms (6), Aux x control
equipment Q1, outputs
Local
Management Port
(LMP)

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 16


EDGE SYSTEM MODULE
(ESMA)

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 17


EDGE DUAL TRX MODULE (EXxA)

The Dual TRX Module is a two-carrier TRX.


Support Double Power TRX (DPTRX).
RF part with 2 independent transmit (TX) chains and 4 receive
(RX) chains

When using 2 TRX we have to use EWxA to combine 2


transceivers in one.
DTRX connected to system module via single Gigabit Ethernet
interface

Power feed from system module via single cable

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 18


EDGE DUAL TRX MODULE (EXxA)

Phase feedback from WBC (DPTRX)


1xDTRX-DDU 1xPower
TX 1 4xRX TX 2

1xBus

0-2xWideband combiners

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 19


DUAL DUPLEXER MODULE (ERxA)
Dual duplexer (DDU) module together with Dual TRX create a logical Sector module
Min 1 DDU per sector is needed
DDU is attached to DTRX module
DDU provides
duplex functionality to combine TX and RX signals to same antenna feeder
multicoupling
2 antenna connections (for 1 or 2 sectors)
2 TX inputs and 4+4 RX outputs (4 RX from antenna 1 and 4 RX from
antenna 2)
DDU contains
2 duplex filter
2 Low Noise Amplifiers (LNAs) with high/low gain support for RX signal
2 Bias-Ts with VSWR measurement functionality
TRX loop is controlled through the DDU
Common TRX loop for all TRXs in same sector
Loop can be performed from either TX to any of 8 RX outputs (only 1 TX and 1
RX can be simultaneously tested

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 20


DUAL DUPLEXER MODULE (ERxA)

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 21


WIDEBAND COMBINER (EWxA)

TxA, TxB use to combine 2 TxA


and TxB of EXxA.
Out is connected to ERxA (after
combining.
DP When use DPTRX.
EWGA 850/900 MHz Bands
EWDA 1800 MHz Band

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 22


The connection from ERxA to EXxA
COMBINING MODE
ANTA ANTB

Duplexer Duplexer
Filter Filter Filter Filter

LNA LNA
Spliter Spliter

WBC Spliter Spliter Spliter Spliter WBC

Bridge Bridge
TX RX RXd TX RX RXd RXd RX TX RXd RX TX

TRE 1 TRE 2 TRE 3 TRE 4

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 23


Cable Connections

2 TRX/1Sector

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 24


Cable Connections

4 TRX/1Sector

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 25


The general requirements for the
commissioning of gsm bts
1. Commissioning Resources:-
PC , Multimeter, Ethernet cable , GSM MSs for testing Site
Master, Light emitting diode (LED),Flat-head
screwdrive,Serial port cable
Site Information.
Board Software.
2. Commissioning Prerequisites:-
Hardware Requirements.
Software Requirements,

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 26


COMMISSIONING STEPS
Step 1

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 27


COMMISSIONING STEPS

Step 2

nov-12
28 SAURABH BANSAL B,.TECH ECE v SEM
COMMISSIONING STEPS
Step 3

29nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING STEPS
Step 4

30nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING STEPS

Step 5

31nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING STEPS

Step 6

32nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING STEPS
Step 7 (1.5 and 2.7)

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 33


COMMISSIONING
Step 8

34nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING STEPS

Step 9

35nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING

Step 10

36nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING STEPS
Step 11

37nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING STEPS

Step 12

38nov-12 SAURABH BANSAL B,.TECH ECE v SEM


COMMISSIONING STEPS

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 39


Thanks for your attention.

nov-12 SAURABH BANSAL B,.TECH ECE v SEM 40

You might also like