HOLDING VESSELS (TO MINIMISE OUT- OF-STACK TIME) • SECONDARY BURNERS • OXYGEN CONTENT (27% MAX IN SLAG BLOW) • BLISTER OXYGEN LEVEL CONTROL (0.5%- 0.7% O2) • PUNCHING AND REAMING PRACTICE INSTALLATION DESIGN • NO EXPANSION ALLOWANCE IN THE TUYERE LINE • EXPANSION GAP BUILT BETWEEN BARREL AND ENDPLATE • MOUTH CONSTRUCTION WITH ROWLOCKS AND KEY-ARCH • LONGER TUYERE BRICK • LARGER TUYERE BRICK FIG.2 Refractory layout of Peirce-Smith Converter POROUS PLUG INJECTED ANODE VESSEL