You are on page 1of 103

UNT

Oliver Gago
Porras
CANOT BE CONTROLLED ?
ROCK and EXPLOSIVE density

H (altura de banco) y machine drill capacity

Carga fondo y Carga columna


FRAGMENTATION
B

CL / Ø = ≥ 5
FLY ROCK

DS 055 MEM-2010
300 m (equipos) y 500 m (personas)
CONTROLLER BLASTING
-Vibrations
-Fly Rock
-Air Blast
AIR
BLAST
POWDER FACTOR

yd3
Low
UNDERGROUND COSTS
COSTS
INCENTIVE AND PRODUCTIVITY
BLASTING COSTS
DRILLING COSTS
DESCRIPTION SYMBOL FORMULA MAG UNIT
Own Cost Cown 8 $/hr
Operating Cost Cop 2,5 $/hr
Bit life BL 192 hr
BL 1700 feet
Bit cost BC 200 $
Drill cost DC DC = ( (Cown+Cop) BL(hr) + BC) / BL (ft) 1,30 $/ft
PRODUCTION DATA
+$7280/64,000 yd3

$3705/64,000 yd3
3. TOTAL COST = Blasting + Driling cost = $ 0.171/ yd3
63,000 x 2.4
BAST +DRILL COST
$0.189/yd3
THE DESIGN INVOLVES
CONCLUSION