You are on page 1of 3

Thermal power Generation from the source.

TP01 TP02
CSTPP (Solar + PNG) Gas turbine (PNG )

Power through Power through


Turbine Turbine
Heat Exhausted Heat Exhausted
(steam) (Flue gases)

Vapour Absorption Machine Vapour Absorption Machine

Waste Heat Waste Heat


(Condensate) (Flue gases)

Hot Water Generator


Hot Water Generator
Exhausted to
Return to Feed
atmosphere
water Tank
TP01
Sr No. Equipment Space Quantity Cost Total Cost

Annual operating cost =


Capital Cost =
Return on Investment =
TP02
Sr No. Equipment Space Quantity Cost Total Cost

Annual operating cost =


Capital Cost =
Return on Investment =

You might also like