Module 3

VSAT
Introduction
Objective
1. The participants can identify the VSAT
components and define visual features.

2. They should be familiar with all connections to


equipment belonging to other systems.

3. They will know what essential maintenance


procedures need be performed.
Scope
• Familiarization

• Maintenance
HUB
ODU
ODU
IDU1
IDU2
CMS
Remote site
ODU
IDU
IDU
• Five (5) LAN inputs – 2 used
• Rfin, Rfout – Coaxial
• LED indicators
Remote site interconnection
• Telephone set for HL from ACC as part of VSCS.
Remote site interconnection
• AISS/AMHS terminal combined in a single
platform
IDU

UPS

MUX
Maintenance
1. Regularly schedule a PMI.

2. VSAT is pre-configured already, changing


parameters is discouraged.

3. Refer to AD module for info on LED indicator


status. (VSAT TROUBLESHOOTING)