Best Practices in Solar Photovoltaics
• HIGH PERFORMANCE
• SAFETY
PHYSICAL:
20,000 MW Utility Grid
2000 MW Off- Grid.
100MW Roof –Top Installations
Lighting Systems for 20Million Houses
COST:
• Rs. 7- 9/ Wp
MAIN PV SYSTEMS / APPLICATIONS
• LIGHTING SYSTEMS
- PROTABLE, FIXED HOME LIGHT AND STREET LIGHTING
• PV POWER PACKS
- < 1kWp POWER PLANTS
• STAND ALONE POWER PLANTS
- 1kWp TO 25kWp POWER PLANTS, TELECOMM
• UTILITY SCALE (MW CAPACITY) GI POWER PLANTS
- 1MW TO 50MW GI POWER PLANTS
• PV WATER PUMPS
- ½ HP TO 5HP AC/DC SURFACE OR SUBMERSIBLE
• OTHER APPLICATIONS
- WATER PURIFIERS, GLOW SIGN DISPLAY,
PV STANDARDS ADOPTED FOR PV COMPONENTS AND SYSTEMS
PV Modules :
STC PERFORMANCE
- IEC 60904-2 (I-V )
- IEC 60891 ( TEMP & INTENSITY CORRECTIONS)
DESIGN QUALIFICATION
- IEC 61215 (MON & MULTI CRYSTALLINE SILICON)
- IEC61646( THIN FILM)
- IEC 62108( CONCENTRATOR)
SAFETY
- IEC 61730 (ALL MODULES)
PV BoS SYSTEMS:
EFFICIENCY / PERFORMANCE
- IEC 61683 (PCU)
- IEC 62093( CHARGE CONTROLLERS & MPPT
ENVIRONMENTAL
- IEC 60068 2 (1,2,14, 30)
STORAGE BATTERIES
- IEC 61427 (ALL TYPE BATTERIES)
- IS 1651
- IS 13369
CABLES, SWITCH/ CIRCUIT BREAKERS/ CONNECTORS
- IEC 60947 PART I,II & III
- EN 50521
- IEC 60189, IS 694, IS1554, IS/ IEC 69947
PV STANDARDS ADOPTED FOR PV COMPONENTS AND SYSTEMS
PV SYSTEMS :
Jn. BOXES/ ENCLOSURES
- IEC 2208
- IP 65 / IP 21
SPV SYSTEM DESIGN
- IEC 62124
INSTALLATION PRACTICES
- IEC 60364
- IEC 61727
NATIONAL ELECTRIC CODES (NEC)
INDICATORS MATTERS..
• PV MODULE STC EFFICIENCY
• PV ARRAY AND SYSTEM EFFICIENCY
• LIFE TIME ENERGY YIELDS (YL)
• PERFORMANCE RATIO (PR)
• CAPACITY UTILIZATION FACTOR (CUF)
• LOSS OF LOAD PROBABILITY (LOLP)
• LIFE CYCLE COST (Rs./ kWh) ( GRID PARITY ?)
• Conditioning test
• Electronic efficiency test
• Charge discharge efficiency
measurement
• Protections test
• Lumen measurement
• LUX measurement
• Spectral distribution
measurement of LED
• Measurement of view angle
LED AND CFL PERFORMANCE
COMPARISON AND SYSTEM
REQUIREMENTS
Color recognition
SOX lamp
Green-Red LEDs
19
Residential street
- PV ARRAY STRUCTURES
- TESTING OF PROTO-TYPE
• Stand Alone
• Hybrid
COMPONENTS SPV POWER PLANTS
1. SPV Modules
2. Batteries
3. Inverters
4. Charge Controllers
5. Loads CFLs, Pumps, Motors, Refrigerators etc.
6. Structures
STANDARDS FOR STAND ALONE POWER PLANTS
- POOR INSTALLATIONS
- SHADOWING
- CERTIFICATION OF COMPONENTS
• REQUIREMENTS ARE :
- MANPOWER
• NABL ACCREDITED ADDITIONAL CENTERS FOR IELECTRONICS , LIGHTING SYSTEMS , NVERTERS & MPPTS
ETDC (Bangalore), UL, TUV, INTER TEK (Noida), ERTL (kolkata), ETDC Pune, ETDC Maholi and ETDC
(G)
• ALL TESTING LABS WITH NABL ACCREDITATION FOR ENVIRONMENTAL , MECHANICAL & IP TESTS ARE
APPROVED
QUESTIONS ??