You are on page 1of 13

group members:

JESSICA LORENA BELLO BERNAL


CRISTIAN CAMILO NOSSA CARDENAS
PAEZ
EDISSON PLINIO ALARCON MORA
EDWIN DARIO TORRES SALAMANCA
 With the development of this project, the negative environmental impact produced
specifically by the livestock was reduced, through the start-up of a technified bio-
digester
 To Formulate a method of energy production from organic waste (animal biomass)
from agricultural activities developed in the village Turua, Municipality of Aguazul.
 To Technify the process through electronic devices.

 To Reduce the environmental impact generated from agricultural activities.

 To Promote the production and use of renewable energies.

 To Provide an alternative source of energy in case of emergency, to improve the


quality of life of users.

 To Promote the application of good agricultural practices (GAP) in the area.


 A theoretical argument was consolidated based on the investigation of projects and
articles related to the identified problem.
 The information obtained in the investigation was applied to the real panorama of
the situation found and it was determined that the appropriate method to solve the
identified problem was the design and implementation of a technified biodigester
prototype.
 In this stage, the materials and budget necessary for the preparation of the
biodigester were identified, but not before carrying out a virtual assembly of the
prototype, in addition to identify the area where the project would be carried out.
 Appropriate conditions were sought in this stage of the project by preparing the
land where the construction of the biodigester would be carried out and the
installation of some sensors to technify the process.
 In this stage, a series of pilot tests or small-scale tests were carried out with some
materials, in order to verify the viability of the project and make the necessary
corrections.
 It was carried out following the proposed design, our technical biodigester
prototype and before starting it, the beneficiary family was instructed on the
general management of the biodigester. To finally launch our project.
 Subsequently, periodic visits were made to the beneficiary family to collect data on
the operation of the biodigester, make some corrections and show that our project
achieved each of the initially proposed objectives.

You might also like