Daftar Harga Barang Bangunan: No. Bahan Satuan Harga (IDR)
Daftar Harga Barang Bangunan: No. Bahan Satuan Harga (IDR)
Daftar Harga 3
4
5
Besi beton 16 mm x 12 m
Pasir
Semen 50 kg
batang
m3
sack
160,000
270,000
75,000
Barang Bangunan 6
7
8
Batu bata
Batako
Batu kerikil
buah
buah
m3
500
1,800
225,000
9 Cat 25 kg kaleng 500,000
10 Pipa PVC 4 inch buah 145,000
11 Pipa PVC 1 inch buah 42,500
12 Kawat beton kg 20,000
13 Keramik 60 cm x 60 cm dus 80,000
14 Asbes lembar 62,000
15 Paku kg 15,000
16 Seng lembar 72,000
17 Lampu 18 Watt buah 37,000
18 Kabel listrik rol 118,000
19 Saklar buah 18,000
20 Stop kontak buah 18,000
21 MCB buah 37,000
22 Kloset buah 900,000
23 Wastafel buah 500,000
24 Tandon air buah 980,000
25 Keran plastik buah 18,000
26 Selang rol 230,000
27 Kaca 10 mm m2 220,000
No. Karyawan Jumlah Karyawan Gaji per Bulan (IDR)
1 Project Manager 1 22,500,000
2 Kepala Administrasi 1 12,000,000
3 Anggota perizinan 3 6,000,000
4 anggota administrasi 5 6,000,000
5 Kepala Lapangan 1 14,000,000
6 Kepala Logistik 1 14,000,000
7 Kepala HSE 1 14,000,000
8 Anggota tim safety 5 6,000,000
No. Kegiatan Jumlah Satuan Durasi (hari) Jumlah Tenaga Kerja Harga (IDR)
1 Penentuan Lahan Pabrik 1 waktu 9 2 4,300,000
2 Survey Sumber Utilitas 1 waktu 5 1 3,500,000
3 Izin Lokasi 1 waktu 14 3 15,735,000
4 Transaksi Administrasi Lahan 1 waktu 10 4 9,465,000,000
5 Pengosongan Lahan 1 waktu 14 16 7,250,000
6 Legalitas perusahaan (SK, PT, SIUP, TDP, dll) 1 waktu 15 1 385,700,000
7 Izin Pabrik 1 waktu 15 1 7,349,000
8 Desain Konstruksi AMDAL 1 waktu 115 2 189,240,000
9 Pengelolaan Limbah 1 waktu 30 1 67,377,000
TOTAL 10,145,451,000
Detailed Engineering Drawing
No. Kegiatan Jumlah Satuan Durasi (hari) Jumlah Tenaga Kerja Harga (IDR)
1 Civil Drawing 1 waktu 14 3 22,400,000
2 Desain Arsitektur Interior 1 waktu 7 2 9,800,000
3 Desain Arsitektur Eksterior 1 waktu 7 2 9,800,000
4 Structural Drawing 1 waktu 14 3 22,400,000
5 Mechanical Drawing 1 waktu 14 4 16,800,000
6 Desain Sistem Ventilasi 1 waktu 7 2 9,800,000
7 Desain Sistem Air-Conditioning 1 waktu 7 1 8,400,000
8 Plumbing Drawing 1 waktu 18 4 14,400,000
9 Desain Sistem Jaringan Listrik 1 waktu 9 2 12,600,000
10 Desain Sistem Instrumentasi 1 waktu 9 2 12,600,000
TOTAL 139,000,000
No. Kegiatan Jumlah Satuan Durasi (hari) Jumlah Tenaga Kerja Harga (IDR)
1 Dryer 2 unit 4 3 295,493,063
2 Mixer 1 unit 4 4 875,535,000
3 Double Layer Cast Film Extrusion 1 unit 4 6 1,094,418,750
4 Hot Needle Micro Perforation 1 unit 4 7 248,068,250
5 Double Sided Adhesive Self Machine 1 unit 4 5 204,291,500
6 Pressing and Cutting Machine 1 unit 4 4 204,291,500
7 Process Piping 1987 m2 4 12 156,275,000
Plastic Packaging Films Universal Tensile Testing
8 1 unit 4 2 204,291,500
Machine
9 Transparency Tester 1 unit 4 1 26,266,050
10 High Precision Electronic Thickness Meter 1 unit 4 1 40,858,300
11 Weigher 1 unit 4 1 11,673,800
TOTAL 3,361,462,713
Comissioning, Testing, dan Start Up Produksi
No. Kegiatan Jumlah Satuan Durasi (hari) Jumlah Tenaga Kerja Harga (IDR)
1 Start Up Dryer 1 waktu 2 2 14,527,000
2 Pengecekan Kadar Air Produk PLA 1 waktu 2 2 4,269,000
3 Persiapan Bahan dan Pengaturan Rasio Aditif 1 waktu 15 2 30,750,000
4 Pengecekan Produk Mixer 1 waktu 3 2 3,670,000
5 Start Up Double Layer Cast Film Extrusion 1 waktu 2 2 39,645,000
6 Start Up Hot Needle Micro Perforation Machine 1 waktu 2 2 11,405,200
7 Start Up Double Sided Adhesive Self Machine 1 waktu 2 1 12,145,700
8 Start Up Pressing and Cutting Machine 1 waktu 2 1 9,815,000
9 Start Up Peralatan Quality Control 1 waktu 2 4 11,528,000
TOTAL 137,754,900
TOTAL BIAYA PROYEK
No. Kegiatan Biaya (IDR)
1 Pengadaan Lahan dan Perizinan 10,145,451,000
2 Detailed Engineering Drawing 139,000,000
3 Konstruksi Pabrik 10,839,279,000
4 Instalasi Mesin dan Peralatan Produksi 3,361,462,713
5 Comissioning, Testing, dan Start Up Produksi 137,754,900
TOTAL 24,622,947,613