You are on page 1of 14

Success Story

100 kWp Rooftop Solar Power Plant


at
DPS International School, Gurgaon
BD Khanna Estates Pvt. Ltd.
May 2018


Background- Key Players
The Client: The EPC: The SNA:

DPS International School, Gurgaon Sunkalp Energy, M/S BD Khanna HAREDA


• DPS International, Gurgaon a co- Estates P Ltd • The Department is responsible for
educational school uses the best • One of the premier roof-top solar formulating policies and programmes
practices available in International companies in North India and a grade A necessary for popularizing the
Education to help students develop into channel partner of MNRE applications of various renewable
well rounded, responsible individuals • Presence in Delhi, Haryana, Punjab, sources of energy in the State.
with a wide range of skills and ability to Maharashtra and Rajasthan. • It is implementing various schemes
analyse complex issues of local, national concerning utilization of solar energy,
• Having been in the roof-top solar
and global significance. biogas, micro hydel, biomas Energy
industry since 2012, it has executed the
• As an International Baccalaureate® (IB) largest roof-top project in Rajasthan at etc.
school, DPSI offers a continuum of the Mahatma Gandhi University of • It is acting as a State Designated
Primary Years Programme, Midlde Years Medical Sciences. Agency for the implementation of the
Programme and the Diploma • Executed more than 75 roof-top solar Energy Conservation Act, 2001 for
Programme. These programmes taking full advantage of fiscal and
projects and boasts a client list that
encourage both personal and academic financial incentives made available by
includes Apeejay Group and the Reserve
achievement, challenging students to MNRE.
Bank of India
excel in their studies and in their
personal development.

The Site


The Briefing- Client’s Key Requirements
The DPS International School, Gurgaon is an architectural beauty. Naturally, in addition to going
green, the school wanted to preserve it’s look and image. Keeping these two factors in mind the
below briefing was given to Sunkalp:

Fit at least 5% of Façade to remain


Roof to remain
connected load, i.e. 100 untouched, i.e. no visible
untouched, i.e. no drilling
kWp Solar strips or cables

Guaranteed generation
Solar Installation not be
School to not be disturbed despite shadow on roof
visible from outside the
during construction from clock tower, flag and
school
mumtee


Solution
A detailed shadow analysis was done for both the available roofs to prepare an optimized arrangement.


Solution
In order to maximize the capacity in the limited roof area and negate the shadow effect, three
different types of structures were installed at DPS International School:

Single Portrait Double Portrait Ballasted


Solution
Further to ensure proper system safety while keeping in mind that the façade or roof are not
damaged below design elements were included:

Chemical Earthing Use of ESE type LA Design of


with Cu bonded to cover the entire foundations as per
electrodes and spread of system IS 875 to
connection with counteract wind
hidden Cu Cables load without
and GI Strips penetrating the
roof


The Rooftop Solar Power Plant


COMPONENT DESCRIPTION
HAREDA Sanction No. & Date DNRE/GGM/2017/4991-92 dated 17.01.2017
Location with Complete Address DPS International School, Gurgaon
HS-01, Block W, South City II, Sector 50, Gurugram, Haryana 122001
Longitude / Latitude 28.409126, 77.063612

Capacity of System Installed (kWp) 100.17 kWp


Type of modules Multicrystalline Solar PV
Make Vikram Solar Eldora VSP.72.AAA
Wattage x No of modules 315 Wp x 318 Nos

Inverter and MPPT Grid Sycnronous String Inverter with Dual MPPT
Make and ACOutput Delta RPI M50, 50 kVA

Structures Hot Dip Galvanized Steel Structures


Tilt Angle of Modules 25 degrees for Single and Double Portrait
15 degrees for Ballasted Type

Earthing and protections Chemical Earthing with Cu Bonded Electrodes


Isolated DC and AC Earthing pits
Surge Protection Devices
Lightening Arrester ESE type LA with 70m coverage radius
Metering Net Metering with DHBVN, 2x bi-directional meters, 1 x solar meter

Date of Commissioning Apr-17


Date of Net Metering Aug-17 ™
COMPONENT DESCRIPTION
DPSI's Connected Load 2000 kVA
Solar Capacity 5% of Connected Load, i.e. 100 kWP

DPSI's Annual Electricity Consumption 14 lac units


Estimated Annual Solar Output 10% of Consumption, i.e. 1.4 lac kWh

Annual Carbon Offset 103,000 kg of CO2e


Equivalent to Planting 500+ trees


Results
The Solar Power Plant has successfully generated more than 55,000 units since after net metering
in August 2017, despite dense smog in NCRs during this winter.


Results
The system has generated more than 25,000 units in the first 4 mos of 2018.


Results
The Solar Power Plant has successfully generated more than 55,000 units since after net metering