Professional Documents
Culture Documents
08 Quality
08 Quality
Contents
0. Definitions
1. Plan Quality
Just-in-time (JIT) :
Production strategy that aim to improving return on investment by reducing
in-process inventory and associated costs. Used in high quality practices.
)استراتيجية تهدف لتحسين العائد بتقليل البضاعة المخزنة و التكاليف المصاحبة (للمنجات عالية الجودة
Q u a l i t y M a n a g e m e n t
8.1 Plan Quality
Inputs :
Project Management Plan ■ Stakeholder Register
Risk Register ■ Requirements Documentation
Organizational Process Assets ■ Enterprise Environmental Factors
Tools and Techniques :
Cost-Benefit Analysis ■ Cost of Quality
Seven Basic Quality Tools ■ Benchmarking
Design of Experiments ■ Statistical sampling
Additional Quality Planning Tools ■ Meetings
Outputs :
Quality Management Plan ■ Process Improvement Plan
Quality Metrics ■ Quality Checklists
Project Documents Update
•Training
•Equipment Internal Failure •Rework
Prevention
•Document processes (Found by the project) •Scrap
•Time to do it right
•Testing •Liabilities
External Failure
Appraisals •Destructive testing loss •Warranty work
(Found by the customer)
•Inspections •Lost business
TT Benchmarking: القياس
• Comparing projects with past projects to identify best practices
Q u a l i t y M a n a g e m e n t
8.2 Perform Quality Assurance
Inputs :
Quality Management Plan
Process Improvement Plan
Quality Metrics
Quality Control Measurements
Project Documents
Tools and Techniques :
Quality Management and Control Tools
Quality Audits
Process Analysis
Outputs :
Change Requests
Project Management Plan Updates
Project Documents Updates
Organizational Process Assets Updates
• Tree diagrams
Also known as systematic diagrams
Used to decompose a high level goal
Ex: WBS, RBS, OBS
• Prioritization Matrix
Used to rank the alternatives for key issues
• Matrix Diagrams
It shows the relationships between factors
Q u a l i t y M a n a g e m e n t
8.3 Control Quality
Inputs :
Project Management Plan ■ Quality Metrics
Quality Checklists ■ Work Performance Data
Approved Change Requests ■ Deliverables
Project Documents ■ Organizational Process Assets
Tools and Techniques :
Seven Basic Quality Tools ■ Statistical sampling
Inspection ■ Approved Change Requests Reviews
Outputs :
Quality Control Measurements ■ Validated Changes
Verified Deliverables ■ Work Performance Information
Change Requests ■ Project Management Plan Updates
Project Documents Updates ■ Org. Process Assets Updates
Statistically Independent: The occurrence of one event does not affect the
probability of the other
Ex: The event of getting a 6 the first time a die is rolled and the event of getting
a 6 the second time are independent
Standard Deviation: How far you are from the mean (not Median)
Area under Normal Distribution curve will be:
1σ = 68.26 % 2σ = 95.46 %
3σ = 99.73 % 6σ = 99.99985 %
TT Inspection:
• Examination to the product to determine if it conforms to documented
standards or to validate defect repairs. Also called reviews, audits, or
walkthroughs.
• Conducted at any level (ex: single activity or final product)
Note:
Plan Quality : Look forward in time
Assure Quality : Look back in time at project standards
Control Quality : Look back in time at project records