Transportation and Routes

• Two parts arriving at the machines to be processed, Part A = 12 min and Part
B = 15 min. The part are assigned in sequence to a machine to be processed
see below table,
Part A Part B
Turing 5 6
Milling 10 8
Paint 8 12

• Then the parts are routed to the correct station and are processed with the
same assigned process times. Once the processing times has completed, the
parts are then routed to the next station that will accept all finished goods.
Eventually disposed.