JSW : Process Flow
Non - coking coal Iron ore Coking coal Fluxes

Coke oven
Lump ore

Beneficiation

Lump ore
Pelletization
Sintering

HMPT Slab Caster


HSM
LHF,RH

Converter
CRM

DRI
Blast furnace
Corex LHF, Billet Caster
EAF

Wire Rod /
Re Bar Mill
Gas media in SMS#3
• Mixed gas
• LPG
• Oxygen
• Nitrogen
• Argon
Gas Media
• Mixed gas:
– Calorific value 1850 Kcal/Nm3
– Mixed gas is sourced from Gas mixing Station by mixing Low and
High calorific by-product gas i.e Blast furnace(750 K Cal/Nm3) and
Cokeoven gas (4400 Kcal/Nm3) in the ratio of 1: 2.2
• Oxygen, Nitrogen & Argon
– O2, N2, Ar are sourced from New Oxygen plant of capacity 1800 TPD
ordered on M/s Praxair India Private Limited(PIPL)
– The location for new oxygen plant will be coming up behind the
existing O2 plants near MSDS road.
• LPG
– Calorific value 11800 kcal/Kg
– Sourced from New LPG station of storage capacity 6 X 25 Tons by the
side of MSDS.
– Supplied by Ms/ TOIPL(M/s Elf)
COST OF FUEL/GAS

Unit rate of utilities UOM

Oxygen Rs/Nm3 2.89

Nitrogen Rs/Nm3 2.89

Argon Rs/Nm3 6.5

Corex gas Rs/Nm3 2.41

LPG Rs/kg 120


MIXED GAS COMPOSITION
Mixed gas % by volume
CO 18 ~ 19
H2 19 ~ 21
CH4 8~9
CnHm 0.6 ~ 0.8
H2S 0.04 ~ 0.08
CO2 13 ~15
N2 35~ 39
O2 0.2~ 0.5
NAPTHELENE Traces
TAR FOG mg/NM3 11~ 15
DUST mg/NM3 5 ~ 15
CALORIFIC VALUE Kcal/Nm3 1850 +/ - 5%
DENSITY Kg/Nm3 ~1.08
TEMPERATURE Deg C 40~50
Corex gas composition
SL CONTENTS BY VOLUME %
1 CO 42~45
2 CO2 30~35
3 H2 18~20
4 CH4 1~2
5 N2 2~2.5
6 H2O 2

Specific gravity=1.28kg/Nm3
Cv=1850~1950Kcal/Nm3
Pr=800mmwc
EFFECT OF CARBON MONOXIDE (CO) ON HUMAN SYSTEM IN DIFFERENT
CONCENTRATIONC IN OPEN ATMOSPHERE

Sl No CO % in air Effects
1 0.005 Imperceptable for 8 Hrs exposure
2 0.01 Imperceptable for 4 Hrs exposure
3 0.02 Mild and frontal headache after 2-3 Hrs of exposure
4 0.04 Nausea and mild frontal headache after 1-2 Hrs of
exposure. Occiptal Headache after 2-3 hrs of exposure.

5 0.08 Headache, dizziness & nausea after 3-4 hrs of exposure.

6 0.16 All the above symptoms in 20 minutes of exposure.


Collapse, Unconciouness and probability of death in 2
hrs exposure.
7 0.32 All the above symptoms in 5-12 minutes & death in 30
min.
8 0.64 All the above symptoms in 1-2 minutes &death in 15 min
exposure..
9 1.28 Effect instantaneous death in 1-4 minutes.
• Age and physical condition of the body also have their influence,
alcoholism and obesity lower the body’s resistance.
• There is also individual variation depending upon certain factors
influencing absorption ex. Blood volume, Circulation, deficiency,
breathing rate, state of health, anemia, old age etc.,

ACTIONS TO BE TAKEN IN CASE OF GAS EXPOSURE


The gas affected person should be removed from gassy atmosphere to
fresh air as soon as possible and the tight fitting clothes, shoes and the
belt should be loosened.
• Any type of physical exertion to the affected person must be avoided.
• The first aid station to be informed & the affected person should be sent
in an ambulance only.
• Artificial respiration if required should be started immediately by a
trained first aider or use of Oxygen resuscitator.
• Inform concerned supervisors of the dept , gas control & gas safety
station and safety dept
C. OXYGEN

• It is important to us because it is needed to support life. It is


colourless, odourless, tasteless and slightly heavier than air and its
volume in air by % is 20.9.

• It is dangerous as it supports combustion fiercely and gives high


temperature. It is potential fire hazard and must kept away from
the inflammable things and temperature zones.

• Used in furnace for maintaining the temperature as such in corex


to undergo reduction process at high temperature and for oxidation
process in BOF and services lines for gas cutting, torch cutting etc.,
D. NITROGEN
• It is colourless, odourless gas and is neither combustible nor a
supporter of combustion. Nitrogen is used as an inert gas,
purging/sealing medium and in some of pneumatic instruments and
drives etc.

• Nitrogen does not support life and in fact high concentration of


nitrogen in the atmosphere reduces the oxygen concentration,
causes as asphyxiation or suffocation.

E. ARGON
• This product is inert as a gas at normal temperature & pressure. It is
colourless, odourless, gas.

• Argon is a asphyxiant. Due to its presence, lack of oxygen can cause


death.

• It is used in BOF for hot steel stirring for uniform mixture and in BOF-
CCP lab
B. LPG (Liquefied Petroleum Gas )

• LPG is used as fuel for heating, cooking, Industrial purposes, cutting


and welding.

• It exists as vapours under ambient conditions of temp and pressure


and can be liquefied by the application of moderate pressure.

• Saturated hydrocarbons in the form of propane and butane


constitute the bulk of commercial available LPG.

• In JSW it is used as fuel for heating, pilot burning of flare stacks,


torch cutting machine in CCP, Runner heating and also in the
absence of mixed gas it is backup fuel.
LPG PROPERTIES
GAS MEDIA SUMMARY
SUMMARY OF SMS#3 MEDIA REQUIREMENT

MIXED GAS NM3/HR OXYGEN NM3/HR NITROGEN NM3/HR ARGON NM3/HR LPG NM3/HR
Pressure 800MMWC 16 BARG 15 BARG 15 BARG 2 BARG

DAILY DAILY DAILY DAILY


PEAK AVG PEAK AVG PEAK AVG PEAK AVG PEAK DAILY AVG
EAF SHOP 11070 7055 12250 7640 35257 1592 480 290 0 0

BILLET CASTER 6515 2000 870 380 343 159.2 34.8 21.2 80 60
TOTAL 17585 9055 13120 8020 35600 1751 515 311 80 60
CALCULATED PIPE
SIZING Dn mm 752 180 296 36 42

PIPE SIZING Dn mm 750 200 300 50 80

Considering Mills 1400 200 300 50 150


PROPOSED BAR MILL GAS MEDIA REQUIREMENT AND PIPE SIZING

The Approximate quantity requirement provided by Bar mill project team

• Mix Gas Flow Rate – 27,000 Nm3/hr


• Flow Rate for Nitrogen Purging – 150 Nm3/hr
• Flow Rate of LPG – 0.25 Tons/day ----5.2 Nm3/Hr
• Flow Rate of oxygen – 0.25 Tons/day ---7.3 Nm3/Hr

The new BRM pipe size and flow considered by SMS#3 in the common
network for SMS#3 & Bar mill which meets the requirement given by Bar
mill

Diameter in Maximum Flow in


Media mm Nm3/hr
Mixed gas 1000 28000
Oxygen 50 1000
Nitrogen 50 1000
LPG 50 100
Gas Media from Source to
SMS-3
MIXED GAS
SMS- 2x 130 MW JSWEL
2 O2,N2,AR
LPG
M
S
3 D
S
New oxygen
Gas
Mixin plant 1 A
g
STN
2 A
DRI
B
6
New 4 SMS-3
Existing LPG PLANT
STN 5
oxygen plants B

From Corex plant

CENTRAL AVENUE ROAD


EMD
DRI Area
General Arrangement Drawing
TOP Identification
MEDIA PIPE SIZING DIA LOCATION TOP TYPE TOP
MTR IDENTIFICATION
OXYGEN, 200 NEW OXYGEN SOURCE 1
PLANT
NITROGEN 300 NEW OXYGEN SOURCE 1
PLANT
ARGON 50 NEW OXYGEN SOURCE 1
PLANT
LPG 100 NEW LPG SOURCE 2
STATION
MIXED GAS 1400 FROM MIXED SOURCE 3
GASLINE TO
JSWEL
O2,N2,AR,MIXED,LPG DRI TOP TRANSITION 4
O2,N2,AR,MIXED,LPG SMS#3 MAIN CONSUMER 5
TOP
O2,N2,AR,MIXED,LPG SMS#3 CONSUMER 6
INDIVUDAL
EQUIPMENT
TOP
SMS-3 & DRI Steam
DRI SMS3 N2
N2 O2 LPG LPG Ar O2
Dia Dia Dia
Dia Dia Dia Dia Dia
Section A-A 250
250 200 150 150 80 200
300

At DRI EXPORT GAS TOP

LOAD DATA BASED ON SMS3 MEDIA


PIPES ONLY
DRI HORIZONTAL LOAD DATA
Dia 2800 1 T/MTR

VERTICAL LOAD DATA


2.5 T/MTR

Mixed
Dia 1400

8500 MM
Section B-B SMS-3 MEDIA PIPES
Steam
LPG
At SMS-3 TOP Dia
250 Dia
150
Ar
Dia
O2
Dia
N2
Dia
80 200 300

Mixed
Dia 1400

LOAD DATA BASED ON SMS3 MEDIA


PIPES ONLY
HORIZONTAL LOAD DATA
1 T/MTR

VERTICAL LOAD DATA


2.5 T/MTR

16800~17000 MM
SMS#3 MEDIA DETAILS
GAS SMS3 DRI
FLOW NM3/HR DIA MM FLOW NM3/HR DIA MM

DRI - - 200000 2800


MIXED 17500+27000(mill) 1400 - -
OXYGEN 15200 200 12000 200
NITROGEN 42000 300 25000 250
ARGON 700 50 - -
LPG 362 150 2000 200
STATUS
– Engineering from
• TOP 1,2,3,4 upto 5 M/s CECON------Ordered
• TOP 5 to 6 M/s ESPIC ( DRI Consultant)---- GA Drg along with Strl
& Civil Qty submitted, Detailed Piping from CECON
• TOP 6 to 7 M/s RSA---- GA drawing received and comments sent.
Awaiting Civil and Strl drawing
– Ordering
• From Source to TOP
– Work order placed on M/s Triveny
– PO placed for following items
» Butterfly valve M/s Fouress
» Expansion bellow M/s RM Applied
» Seamless pipes M/s Maharashtra seamless
» ERW pipes M/s Bhuwalaka & M/s Maharashtra Seamless
» Gate & Ball Valves M/s Fouress, M/s Intervalve, M/s Dhanjaya & M/s
Vasanth
» Seamless pipe fittings M/s Metallic metals
• Inside SMS-3 shop ordering BOQ received and finalisation under
process for ordering
– Seamless pipes Technical file sent to commercial
– Paints Technical file sent to commercial
– Workorder Technical file sent to commercial
COLOR CODING OF PIPELINES