Inova Fairfax Hospital: South Patient Tower
Inova Fairfax Hospital: South Patient Tower
13
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION ANALYSIS#2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS)
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY IDENTIFY AREA FOR SIPS:
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
•RED AREA
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
•FLOW: FROM EAST TO SOUTH
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION •3,4,6,7,8 FLOOR MEDICAL/SURGERY ROOM
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
•9-11FLOOR ICU BEDS
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
14
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION ANALYSIS #2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS)
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
SCHEDULE ACCERLATOIN-SMART ROOM
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM •PREDESIGNED MEDICAL CARE/SURGERY ROOM BY HILL-ROM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY •FINALIZEINTERIOR ROOM LAYOUT
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION •2D, 3D REDERINGS FOR CLIENTS
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
15
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION ANALYSIS #2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS)
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) SCHEDULE ACCELERATION
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
•SUPERSTRUCTURE
III. SMART ROOM •ABOVE CEILING MEP
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY •FAÇADE
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
•INTERIOR
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) •SAVING ONE MONTH
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
•AUGUST2011-JULY2011
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
16
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
SPT GOAL: ENERGY REDUCTION 24.5 %
V. CASE STUDY AND FEASIBILITY
PROBLEM IDENTIFICATION BASED ON DATABASE OF SIMILAR BUILDINGS
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION •OPERATE 24/7 HIGH COOLING,ELECTRICITY HOT WATER DEMANDS
II. IDENTIFY AREA FOR SIPS
•EMERGENCY BACKUP, OPERATIONAL DURING NATURAL AND OTHER
III. SMART ROOM
IV. SCHEDULE ACCELERATION DISASTER
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION •TIGHT CONTROL OF TEMPERATURE, HUMIDITY, VENTILATION. VARY
II. NZE BUILDING CERTIFICATION
AMONG DIFFERENT SPACE TYPES
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS •DAY-TO-DAY OPERATION EQUIPMENT INTENSIVE, NO EFFICIENCY
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION RATING SYSTEMS FOR MEDICAL EQUIPMENTS
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
17
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
NET ZERO ENERGY BUILDING CERTIFICATION REQUIREMENT: NATIONAL RENEWABLE ENERGY LABORATORY(NREL)
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION •CONSTRUCTION AND RENEWABLE ENERGY SYSTEM CURB THE PROJECT’S
DEFINITION SUGGESTED BELOW TO DEFINE NET ZERO ENERGY:
II. IDENTIFY AREA FOR SIPS
CONTRIBUTION TO THE EFFECTS OF SPRAWLED DEVELOPMENT
III. SMART ROOM
• NET ZERO SITE ENERGY
IV. SCHEDULE ACCELERATION •THE BUILDING OPERATES AT NET ZERO ENERGY
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY • NET ZERO SOURCE ENERGY
I. PROBLEM IDENTIFICATION •NOT PRECLUDE ANOTHER BUILDING
II. NZE BUILDING CERTIFICATION • NET ZERO ENERGY COSTS
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
•ATTRACTIVE AND INSPIRING
IV. ELECTRICALBREADTH –DYNAMIC GLASS • NET ZERO ENERGY EMISSIONS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
18
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL UTILITY BILL:
II. IDENTIFY AREA FOR SIPS PRODUCED VS. USED
III. SMART ROOM • CHILLED BEAM ADD UP MONTYLY READINGS OF ONE YEAR
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY PASSIVE/ACTIVE/MULTI-SERVICE
I. PROBLEM IDENTIFICATION EXTRA ENERGY:
II. NZE BUILDING CERTIFICATION • COMBINED HEAT AND POWER(CHP) SELL BACK TO UTILITY COMPANIES
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS • SOLAR ELECTRIC FIXED PRICE
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION ROOF/GROUND/MOUNTED FACING SOUTH
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS NO SHADE 9:00AM-3:00OM DECEMBER
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS 2-4% NET COST
19
PRESENTATION OUTLINE:
I. PROJECT OVERVIEW
I.
II. PROJECT#1:
ANALYSIS OVERVIEW
IMPLEMENTATION OF BIM
II. I. PROBLEM
ANALYSIS IDENTIFICATION
#1: IMPLEMENTATION OF BIM
II.
I. BIM SCORECARD
ENERGY REDUCTION STUDIES Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
III.
II. BIM ROI LAYOUT AND DESIGN
SYSTEM DESIGN PARAMETERS:
IV.
III. INVESTIGATION OF BIM TOOLS
STRUCTURAL IMPACT
V.
IV. CASE STUDY
ENERGY AND FEASIBILITY
IMPACT BREADTH TOPIC: DYNAMIC GLASS WINDOW AREA/DAYLIGHTS CONTROLS /
III. ANALYSIS
V. #2: SHORT
FINANCIAL INTERVAL PRODUCTION SCHEDULES(SIPS)
FEASIBILITY
I. PROBLEM IDENTIFICATION SHADING/GLASS&FRAME TYPE
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
II.
I.
IDENTIFY AREA FOR SIPS
CASE STUDIES
THE FAÇADE DESIGN TOOL
III.
II.
SMART ROOM
INITIAL PREFABRICATION PLANNING 4A MIXED HUMID CLIMATE
IV. SCHEDULE ACCELERATION
III. SCHEDULE AND COST REDUCTION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
IV. SCHEDULE COMPRESSION
I. PROBLEM IDENTIFICATION
V. MODULAR DESIGN
II. NZE BUILDING CERTIFICATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
I. BIM EXECUTION GUIDE
IV. ELECTRICALBREADTH –DYNAMIC GLASS
II. CASE STUDIES
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
III. OPTIMAL DETERMINED USES
I. PROBLEM IDENTIFICATION
IV. VIRTUAL MOCK-UPS
II. STUDY ON IPD GUIDE
V. ANALYSIS
III. #4:PRIME
MULTI INTEGRATED PROJECT DELIVERY (IPD)
CONTRACTS
VI.
VI. SUMMARY AND
SUMMARY AND CONCLUSION
CONCLUSION
VII.
VII. ACKNOWLEDGEMENTS
ACKNOWLEDGEMENTS
20
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI BREADTH TOPIC: DYNAMIC GLASS
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
SOUTH FACADE
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
EAST FACADE WEST FACADE 21
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
BREADTH TOPIC: DYNAMIC GLASS
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
DYNAMIC GLASS
IV. SCHEDULE ACCELERATION
•REDUCE VISUAL GLARE
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION •REDUCING COOLING HEATING USAGE BY 20%
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL •REDUCING PEAK LOAD BY 30%
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) •COST:20$ / SF.
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
22
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI BREADTH TOPIC: DYNAMIC GLASS
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
TOTAL ENERGY SAVING= 31,789,200kBTU x 25%= 7,947,300kBTU
III. SMART ROOM
IV. SCHEDULE ACCELERATION
TOTAL COST SAVINGS=7.9473 x 1000 x 35.16= $ 279,427
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION SOLADIGM INC. $20 /SF
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS TOTAL COST= $20/ ft2 x 22450 ft2 = $449,000
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
23
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I.
II.
PROBLEM IDENTIFICATION
BIM SCORECARD
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD)
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
PROBLEM IDENTIFICATION
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION COMPLEXITY OF MEP SYSTEM: EAST ELEVATION EXTERIOR WALL:
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM MORE THAN ONE YEAR BIM COORDINATION •LIGHT GAGE METAL FRAIMING
IV. SCHEDULE ACCELERATION
•REDESIGN TO COORDINATE
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY NO EARLIER CONTRIBUTION TO DESIGN PHASE
I. PROBLEM IDENTIFICATION BETTER WITH WOMEN’S HOSPITAL
II. NZE BUILDING CERTIFICATION AND COORDINATION PROCESS
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL •REVISED ENGINEERING DRAWINGS
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) PREPARED BY FRAMING
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE SUBCONTRACTOR.
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
24
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I.
II.
PROBLEM IDENTIFICATION
BIM SCORECARD
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD)
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
PROBLEM IDENTIFICATION
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION SOUTH ELEVATION :
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM 1ST AND 2ND FLOOR CURVED WALL
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY CURVES NOT MATCH
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION ARCHITECTURE AND ENGINEERING DRAWING MISTAKES
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
SCHEDULE DELAYED
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
25
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM • ABILITY TO CHANGE DECREASE
I. PROBLEM IDENTIFICATION
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD) • COST OF CHANGES INCREASE
II. BIM SCORECARD • IPD PUT MORE EFFORT IN
III. BIM ROI
STUDY ON INTEGRATED PROJECT DELIVERY A Guide(AIA) PREDESIGN/SCHEMATIC DESIGN PHASE
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY Items Traditional Project Delivery Integrated Project Delivery
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
Team Fragmented, “minimum- Mutual Respect and Trust
I. PROBLEM IDENTIFICATION
necessary” basis, strongly
II. IDENTIFY AREA FOR SIPS
hierarchical
III. SMART ROOM
IV. SCHEDULE ACCELERATION Compensation/re Individually pursued Mutual Benefit and
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY ward Reward
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION Risk Individually managed, Collaborative Innovation
transferred to the greatest extent and Decision
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
possible
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
Process linear, segregated,information Early Involvement of Key
I. PROBLEM IDENTIFICATION hoarded. Participants, goal
II. STUDY ON IPD GUIDE Definition, Intensified
III.
V. CASE STUDY AND FEASIBILITY
ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
RISKS: MOST IDEAL WAY TO ACHIEVE IPD
I. PROBLEM IDENTIFICATION • COMBINE ALL NEW TECHNOLOGIES
•TRYING SOMETHING NEW AND UNTESTED
II. IDENTIFY AREA FOR SIPS • BIM LEAN SUSTAINABILITY
III. SMART ROOM
•BUILDING WITHOUT A GMP
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
•OWNER TAKING RISKS BACK
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
•DIFFICULT TO MEASURE THE BENEFIT
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
27
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
DIVISION OF CAPITAL ASSET MANAGEMENT OF
I.
II.
PROBLEM IDENTIFICATION
BIM SCORECARD
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD) COMMONWEALTH OF MASSACHUSETTS
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
MULTI PRIME CONTRACTS • FREQUENT MEETINGS
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
• SHARING SENSITIVE, PROPRIETARY OR CONFIDENTIAL
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS INFORMATION
III. SMART ROOM
IV. SCHEDULE ACCELERATION
• SELECT AND BUILD STRONG IPD PROJECT TEAMS
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
• MASTER KEY COMPONENTS OF CONTRACTS AND RISK
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION MANAGEMENT
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
• UNDERSTAND ECONOMIC AND MARKET FACTORS THAT ARE
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
DRIVING IPD ADOPTION
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
28
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION SUMMARY AND CONCLUSION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) ANALYSIS#1INCREASE IMPLEMENTATION OF BIM ANALYSIS#3 NET ZERO ENERGY INCREASE
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS SCHEDULE/COST PLANNING BUILDING ENERGY EFFICIENCY
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY ANALYSIS#2 SIPS ACCELERATE SCHEDULE ANALYSIS#4 INTEGREATED PROJECT DELIVERY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
PREDESIGNED SMART ROOM ELIMINATE BARRIERS INCREASE
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
V.
IV. ELECTRICALBREADTH –DYNAMIC GLASS
ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
PRODUCTIVITY
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
29
ACKNOWLEGEMENTS
30