You are on page 1of 8

UPDATES AND

FIELD PLAN FOR THE DRY SEASON

Manuel, Amihan Y.
2011-62204
MSc Geomatics Engineering (RS)
WASI-5 SENTINEL-2

Chlorophyll-a Concentration
WASI-5 SENTINEL-2

SPM Concentration
WASI-5 SENTINEL-2

➔ Currently processing
November 17 image
◆ Inconsistent outputs,
working on image
subsets on both WASI-
4 and WASI-5
➔ Will run Sentinel 2
processing on CoARE
Project’s HPC Service
◆ Service Request form
◆ Endorsement Letter
Dry Season Fieldwork

➔ The field survey aims to acquire spectral data along with


water quality data for spectral matching with remote sensing
reflectance. IOP’s for this fieldwork will be used for fine-
tuning the model for the dry season.

➔ The continuous intensive field surveys are scheduled to be


done near a satellite overpass for Sentinel-2 for closer
spectral reconstruction
EQUIPMENT
➔ CLW and Spectrometer
EXPECTED
OUTPUTS

➔ CHL and Turbidity concentration in sampling stations


➔ Spectral data
◆ Reflectance
● Surface/Above Water (Rrs)
● Sub-surface (just below) (rrs)
● At 0.5m depth
● At 1m depth
ROUTES

Total # of points: 47
(12 additional points)

Total fieldwork days: 5

Points per field day: 9-10


each day

Time per station: 5-7


minutes

Boat speed: 12 kph

Time to get to next


sampling station: 30-45
minutes

Estimated time duration


from first to last sampling
station: 9am - 3pm