Long Son Petrochemicals Complex
– Ba Ria-Vung Tau - Project Profile
 Long Son Petrochemicals Complex is an important project of Vietnam, it’s invested 100% by Siam
Cement Group with CAPEX approximate 5,4 billion $.

 The project involves the construction of a greenfield petrochemical complex on 464ha site area.
The complex will be built into six stages.

The complex’s capacity will consist of:


 1.65 MTPA of olefins plant from a flexible cracker utilizing feedstock as ethane, propane, and naphtha;

 1.45MTPA of polyolefins plant;

 a 280,000 tonnes per annum (TPA) chloralkali plant with supporting infrastructure, such as warehouse, port,
jetty, power plant and other utilities.

 Furthermore, the cracker will be fully integrated with a wide range of downstream products, including
polyethylene (PE), polypropylene (PP) and vinyl chloride monomer (VCM).

 The project is designed to be able to use either gas or naphtha as feedstock.

 CEO: Roongrote Rangsiyopas