Professional Documents
Culture Documents
Summer Intern
Summer Intern
OIL INDIA
-Submitted by
Mohd Saif
Roll no- R820216071
SAP Id- 500053152
FIELD OPERATIONS
• Gas Lift Installation
• Zone Isolation Job
• Cement Squeezing Job
• Fishing Operation
• Nitrogen Injection
• Hot Oil Injection
• Caving Test Job
• Lead Impression Block and Blind Box
• Scrapping Job
• Milling Job
• Coil Tubing Operation
WELL CASES
• Wrong Perforation
• Pup Joint Parting while Unsettling and Recovering the
Tubing
• Pressure Shoot Up in Pump and Extra Drag in String during
Milling
• String Snapping during Well Operations
• Loss Circulation during Well Operation
• Fire and Theft
• Failure of Time Cycle Controller in Intermittent Gas Lifts
PRODUCTION INSTALLATIONS
• Oil Collecting Station
• Gas Compression Station
• Field Gas Gathering Station and Off Take Point
OIL COLLECTING STATION
GAS COMPRESSION STATION
GLYCOL TREATMENT PLANT
FGGS AND OTP
SEPARATOR SIZING
• Two Phase (Oil-Gas Separator)
• Three Phase Separator