FIELD OPERATIONS
• Gas Lift Installation
• Zone Isolation Job
• Cement Squeezing Job
• Fishing Operation
• Nitrogen Injection
• Hot Oil Injection
• Caving Test Job
• Lead Impression Block and Blind Box
• Scrapping Job
• Milling Job
• Coil Tubing Operation
WELL CASES
• Wrong Perforation
• Pup Joint Parting while Unsettling and Recovering the
Tubing
• Pressure Shoot Up in Pump and Extra Drag in String during
Milling
• String Snapping during Well Operations
• Loss Circulation during Well Operation
• Fire and Theft
• Failure of Time Cycle Controller in Intermittent Gas Lifts
PRODUCTION INSTALLATIONS
• Oil Collecting Station
• Gas Compression Station
• Field Gas Gathering Station and Off Take Point
OIL COLLECTING STATION
GAS COMPRESSION STATION
GLYCOL TREATMENT PLANT
FGGS AND OTP
SEPARATOR SIZING
• Two Phase (Oil-Gas Separator)
• Three Phase Separator

Problem- The existing separator at Oil Collecting Station


started suffering gas cut at level control valves due to increase
in gas flow over several decades. The units shows 2 level
control failure in single week. Due to this we needed to
troubleshoot the problem. And resize the separator, proposing
the problem and a required parallel separator unit in parallel.
MATLAB CODE
RESULT
GEOLOGY
• Stratigraphy of Assam
• Determination of Possible hydrocarbon Reserves
• Cutting Analysis
• Studying Contour Map
STRATIGRAPHY
CONTOUR MAP
RESERVOIR
• Building and Analysing Sections and Correlations on
‘PETREL Software’
• MWD Log Analysis and making ELAN Report
• Determination of Perforation Location
EXPLORATORY DRILLING
• Drilling Operations
• Determining the Well Trajectory
• Anti-Collision Planning
• Deviation Tracking and m.b.d. Calculations
SELECTION OF
ARTIFICIAL LIFT
• Inflow Performance Relation
• Tubing Performance Relation
• Choke Performance Relation
• Comparison of Lift Technology