You are on page 1of 3

CP07B - Lusail Plaza Infrastructure, LRT, Car Park, Road A1 & Landscape

DATE: 02-12-19 Activities in Zone 1


BACKFILLING

D5 ROAD EAST AND WEST OUTER WALL S13-15

Z Control measures Pics:


1. Equipment failure, Struck by a • Daily equipment checklist carried out by the
Moving Equipment's operator prior to work.
• Equipment/vehicles thoroughly examined by a
competent person and third party certified.
• Ensured all operator has valid third party
training card and valid driver’s license.
• Ensuring all equipment’s and machines are
quarterly inspected and safe to use.
• Only certified/trained personnel carried out
TBT FLAGMEN
the activity.
• Flagman was provided for Each equipment.
2. Noise and vibration • Toolbox talk meeting carried out for backfilling
workforce and discussed the following:
* Use of Ear plugs (hearing protection) during
the activity.
* Safe system of work for backfilling works
pursuant to backilling MS/RA.

BACKFILLING WORKS AT D5 TRENCH


DATE: 02-12-19 Activities in Zone 1
BACKFILLING

D5 ROAD EAST AND WEST OUTER WALL S13-15

BACKHOE LOADER

SKID LOADER