1
3GPP Releases
•• Click
Releaseto edit
'99 Master text
functionally styles
frozen December 1999. The
• Second level basis for early 3G deployment in Japan, Isle
of Man, Monaco, and ……many more in
• Third level preparation.
•• Releaselevel
Fourth 4 functionally frozen March 2001. Defines the
low chip rate TDD mode of particular interest
• Fifth level to China, but with high potential in other
markets.
• Release 5 functionally frozen March/June 2002
• Release 6 expected to be functionally frozen in late
2003
2
Functional decomposition of requirements leads to the definition of a
number of “Features”.
3
Active project management
4
Active project management
3G Release 99 contained more or less the same functionality as GSM
R99, but of course using the new UTRA radio access network technology
(W-CDMA).
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
http://www.3gpp.org/ftp/Information/WORK_PLAN/
5
Release 4
6
Release 5
7
Release 6
8
Take a closer look at the project management techniques …
9
Take a closer look at the project management techniques …
10
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
11
The work plan is reviewed at every TSG SA meeting …
12
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
13
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
14
Every Feature (top level functional enhancement) is examined
in sufficient detail to ensure that
• Its definition is (still) correct, and that
• It is making adequate progress according to plan.
15
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
16
Its Work Item Definition sheet is
• Click
updated to edit
if necessary Master
and re-issued text styles
as a TSG meeting document. This
• Second
is the document whichlevel
will be
referred to in the next issue of the
• Third
Work Plan. level
• Work
The Fourth levelsheets
Item Definition
are re-issued after each TSG SA
• Fifth level
meeting.
17
Its Work Plan is re-issued after
• TSG
each Click to edit Master
SA meeting. text styles
• Second level
• Third level
• Fourth level
• Fifth level
You can find it at
http://www.3gpp.org/ftp/Information/WORK_PLAN .
18
• Click For
to edit
moreMaster text styles
information please visit
• Second level
• Third level http://www.3gpp.org
• Fourth level Or contact
• Fifth level
john.meredith@etsi.org
19