3GPP CWTS workshop

Beijing, 28 January 2003


• Click to edit Master text styles
• Second level Presentation 2:
• Active
Third level project management
• Fourth level
John M Meredith
• Fifth level
3GPP Specifications Manager
ETSI Mobile Competence Centre

1
3GPP Releases

•• Click
Releaseto edit
'99 Master text
functionally styles
frozen December 1999. The
• Second level basis for early 3G deployment in Japan, Isle
of Man, Monaco, and ……many more in
• Third level preparation.

•• Releaselevel
Fourth 4 functionally frozen March 2001. Defines the
low chip rate TDD mode of particular interest
• Fifth level to China, but with high potential in other
markets.
• Release 5 functionally frozen March/June 2002
• Release 6 expected to be functionally frozen in late
2003

2
Functional decomposition of requirements leads to the definition of a
number of “Features”.

Feature 1 spec Feature 2 spec Feature 3 spec

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
Each feature enhances overall system capability by
• Fifth level
• Providing end users with new or improved functionality (e.g.
migration of SMS to EMS and to MMS); or
• Providing equipment suppliers with improved possibilities for
product differentiation; or
• Providing network operators with enhanced revenue-generating
possibilities.

3
Active project management

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
• Fifth level

4
Active project management
3G Release 99 contained more or less the same functionality as GSM
R99, but of course using the new UTRA radio access network technology
(W-CDMA).
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level

The 3GPP work plan can be consulted at:

http://www.3gpp.org/ftp/Information/WORK_PLAN/

5
Release 4

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
• Fifth level

6
Release 5

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
• Fifth level

7
Release 6

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
• Fifth level

8
Take a closer look at the project management techniques …

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
• Fifth level

9
Take a closer look at the project management techniques …

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
• Fifth level

10
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level

11
The work plan is reviewed at every TSG SA meeting …

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
• Fifth level

12
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level

13
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level

14
Every Feature (top level functional enhancement) is examined
in sufficient detail to ensure that
• Its definition is (still) correct, and that
• It is making adequate progress according to plan.

• Click to edit Master text styles


• Second level
• Third level
• Fourth level
• Fifth level

15
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level

16
Its Work Item Definition sheet is
• Click
updated to edit
if necessary Master
and re-issued text styles
as a TSG meeting document. This
• Second
is the document whichlevel
will be
referred to in the next issue of the
• Third
Work Plan. level
• Work
The Fourth levelsheets
Item Definition
are re-issued after each TSG SA
• Fifth level
meeting.

You can find them at


http://www.3gpp.org/ftp/Information/WI_Sheet .

17
Its Work Plan is re-issued after
• TSG
each Click to edit Master
SA meeting. text styles
• Second level
• Third level
• Fourth level
• Fifth level
You can find it at
http://www.3gpp.org/ftp/Information/WORK_PLAN .

18
• Click For
to edit
moreMaster text styles
information please visit
• Second level
• Third level http://www.3gpp.org
• Fourth level Or contact
• Fifth level
john.meredith@etsi.org